Gas Cond Jan 08
For lean gases (high high GOR) the profile is particularly important
field data (not real)
illustration:
calculated
Problem: placing the take- off point in liquid inventory and assessing the consequence of a wrong assumption
Liquid inventory
11
13
Flow rate
3
Gas Cond Jan 08
Pipeline discretisation
Check sensitivity to sectioning Liquid hold-up Pressure Temperature Use at least 2 segments for any pipe Try to follow the rule:
Li
Li+1
i 5
Default
The timestep is global i.e. on all N dx Normally ht varies between user specified limits with the CFL active i.e. ht min( L*section/Ufluid). Reducing this with a factor 2 by e.g. dividing the L*section by 2, could double Nht and thereby double the computing time ttotal Dividing all sections in 2 could increase computing time with a factor 4 by doubling both Ndx and Nht
A source pulse was introduced at inlet steady state flow rate of 1200 Bl/day and a maximum of 6600 Bl/day for 2 min
The Grids
3.5
Case 4
2.5
Case 3
NdX Pipe-2 is 5 of eq. length NdX Pipe-2 is 10 of eq. length NdX Pipe-2 is 5;1000, 500,250 and 2x 125 m NdX Pipe-2 is 5 of 300 and 2 of 250 m
Case 2
0.5
Case 1
800
PIPE-1
1600
2400
PIPE-2
3200
4000
Case-1Case-2Case-3Case-4-
Case-1Case-2Case-3Case-4-