Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LEVEL -2-

D R I V E W A Y
OPEN PARKING
TRANSFORMER/R M U/ELEC: ROOM
FIRE
R.C.C WATER TANK
48
FIRE
ETS & PUMP ROOM
B
TO CUSTOMER SERVED AREA.
12" CHILLED WATER SUPPLY PIPE
B
A A
LEVEL -2- D R I V E W A Y
LEVEL -1 D R I V E W A Y
OPEN PARKING
LEVEL -2-
D R I V E W A Y
OPEN PARKING
L O B B Y
ENT.
TRANSFORMER/R M U/ELEC: ROOM
WATCHMAN ROOM
PANTRY
LEVEL -1- D R I V E W A Y
EXIT
ENT.
RAMP UP FROM GROUND TO 2nd LVL:
SLOPE 10%
RAMP DN FROM LVL:2 TO GROUND
SLOPE 10%
RAMP UP FROM LVL:1st TO LVL:2nd
SLOPE 8.1%
L O B B Y
RAMP DN: FROM LVL:2nd TO LVL:1st
SLOPE 8.1%
RAMP UP FROM LVL:2nd TO LVL:3rd
SLOPE 10%
RAMP DN:: FROM LVL:3rd TO LVL:2nd
SLOPE 10%
EXIT
FIRE
R.C.C WATER TANK
26
28 46 47
48 67
27
FIRE
FIRE
FIRE
ELEC: ROOM
1
74
ETS & PUMP ROOM
B
TO CUSTOMER SERVED AREA. 12" CHILLED WATER SUPPLY PIPE
B
A A
+1.425 2nd PARKING LVL:
+4.550 4th PARKING LVL:
+0.150 GROUND FLOOR LVL:
HEX
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING PARKING
PARKING
+1.425 2nd PARKING LVL:
+4.550 4th PARKING LVL:
+7.350 6th PARKING LVL:
+0.150 GROUND FLOOR LVL:
+10.150 8th PARKING LVL:
+12.950 10th PARKING LVL:
+15.750 12th PARKING LVL:
+18.550 14th PARKING LVL:
+21.350 16th PARKING LVL:
+24.150 18th PARKING LVL:
+26.950 20th PARKING LVL:
+29.750 22nd PARKING LVL:
+32.550 ROOF LVL:
ALUMN: CLADING
NOTE: ALL HEAT EXCHANGERS ARE TO BE SINGLE PASS.
950 6000
DESCRIPTION
HEX 1
CAPACITY
WEIGHT
DROP
0.70
PRESSURE
HEAT EXCHANGER DETAILS
COLD SIDE HOT SIDE
TEMP. TEMP.
IN OUT IN OUT
EACH
EACH
PRESSURE
16.0
DESIGN
SIZE
950 6000 HEX 2 0.70 16.0
OPERATING
MODEL
-
-
DISTRICT COOLING RETURN
PIPE TO PLANT.
DISTRICT COOLING SUPPLY
PIPE FROM PLANT.
CHILLED WATER RETURN
PIPE FROM CUSTOMER
SERVED AREA
CHILLED WATER SUPPLY
PIPE TO CUSTOMER
SERVED AREA
ELEVATION
CONTROL BUTTERFLY VALVE CONECTION DETAILS
NO SCALE
NATIONAL CENTRAL COOLING CO. (PJSC)
2 TAB / DB-01 / PT / M-01 1 OF 1
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SPECIFIED OTHERWISE.
NOTES
ENERGY TRANSFER STATION ARRANGEMENT IN GROUND FLOOR LEVEL
AND DETAILS
SHEIKH ZAYED ROAD
DB-01
DUBAI,UAE
MULTI-STOREY PARKING
(G+9 TYP. +R.)
PLOT NO. 335-170,SHEIKH ZAYED ROAD
2. ALL LEVELS ARE IN METERS UNLESS SPECIFIED OTHERWISE.
- CHILLED WATER PIPING BY TABREED
- CHILLED WATER PIPING BY OTHERS
LEGEND
- BUTTERFLY VALVE
-
- CONTROL BUTTERFLY VALVE
- MAG FLOWMETER FM
C. BFV
QC
BFV
PRIME TOWER
ETS GENERAL ARRANGEMENT
OVERALL BUILDING PLAN
SECTION A-A SECTION B-B
ASPIN HOLDING LLC
ASPIN TOWER
Date Rev. No. Description Drwn. Aprd. Chkd.
Z:\Draughting - Projects\000 Schemes\Dubai\DB-01 (SZR) bc\Prime Tower (Plot 335-117)\Tabreed\Mechanical\Tab DB-01 PT M-01 r02.dwg, 31/07/2011 12:13:08 PM, 1:1

You might also like