IOM CAUTION! ALWAYS follow this instruction if anything conflicts with standard chiller IOM!
/Installation 1.1 Detail drawing 1 shows Fundamental instruction for heat recovery chiller. Normally, condenser has two separated water boxes, the upper set of which is for heat recovery and the lower one is for the original condenserSee detail drawing 2.
TC
Auxiliary Boiler
TE
TCV
HWP
Tower Condenser
TXV
Motor
Hot Gas
Evaporator
ChWP
Cooling Load
1:
Fundamental instruction
Page 1/2
// Installation, Operation & Maintenancefor Heat Recovery Units w/o Hot Water Control (YS, YK-F & YR)
1.2 The inlet or outlet direction of nozzles on water box should follow as the marker on the water box. 1.3 Make sure flowing water be non-stop from cooling water tower. /Operation 1. The requirement for water quality should take cooling water for reference. 2. Our chiller doesnt monitor and record the parameters for heat recovery. The heat quantity of heat recovery should depend on the operating conditions and part load of chiller.