Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

NETWORK MANAGEMENT CENTER CHANGE REQUEST FORM 1. Task: i. Sites: ii. Planned Duration: a. Start Date/Time b.

. End Date /Time iii. Proposed Budget: iv. Task Leader: v. Task Members vi. Section: vii. Prepared By: viii. Date: 2. Background: Southridge BTS Dual Carrier Upgrade BSC / SOR BTS ii. 30 mins or less. a. 25/ 03 / 2012 @0000hrs b. 25/ 03 / 2012 @0030hrs Covered under the CDMA Network Operation Nikhil Praveen CDMA Network Nikhil 21/03/2012

Southridge BTS has about 25 Erlangs of traffic in one of its sectors. It needs another carrier on the same sector to cater for this high load sharing. Therefore the need for an upgrade to this BTS with another set of carriers and an additional E1.

3. Purpose: Configure dual carrier networking

4. Scope Of Works: Configure dual carrier configuration Reset BTS Upgrade card SW Check configuration and SW version Check traffic flow

To provide optimum service to our customers at all times through real time surveillance and precise control of the Network

5.Procedural Works Detail: As above

6. Risks: None.

7. Effect to Service and/or Customers: (How many circuits/customers) Actual outage to traffic 10mins or less when BTS resets after operation. Well test calls after modification. Time of work has very low traffic.

8. Support: OMC BSC Engineer

9. Awareness: NMC.

10. Other Comments/Recommendations: Looking forward to your approval. Thanks.

End

To provide optimum service to our customers at all times through real time surveillance and precise control of the Network

You might also like