"National Thermal Power Corporation Anta (Raj.) ": A Report On Practical Training Taken at
"National Thermal Power Corporation Anta (Raj.) ": A Report On Practical Training Taken at
REPORT ON
PRACTICAL TRAINING TAKEN AT
SUBMITTED TO:
SUBMITTED BY:
ARPAN PORWAL
PREFACE
Realizing that the practical experience is an academic allowed development of a person practical
training forms an integral component of any professional course like engineering. The theoretical
studies build the engineer in him pols of knowledge where the practical studies build the engineer make
him complete.
Training may be defined as a short term process utilizing septamic and organized by which trainee
personally acquire technical knowledge and skill of a definite purpose.
In this regard I have undergone my training at NTPC ANTA.
I hope this response will be helpful to any person who is inhacted to know about NTPC ANT GAS
POWER PROJECT. As I am student of ELECTRICAL & ELECTRONICS ENGENEERING III year have to go
the practical training for 30 days.
ACKNOWLEDGEMENT
It has been privileged to work under the trained and inspiring guidance of Mr. ANANTH
JAGANNATH.
We are grateful to his supervision guidance and encouragement.
I am heartily thankful to Mr. B. L. SISODIA who gave me such a nice opportunity to take
training at NTPC, ANTA.
My thanks are due to all the staff members of NTPC, ANTA for their kind valuable support
and corporate.
I am also thankful to Mr. Ajay Sharma, HOD of Electrical & Electronics Department of
MAIIT.
ARPAN PORWAL
CONTENTS
1. INTRODUCTION1
1.1. LOCATION OF NTPC.4
1.2. FUTURE PLANS AND PERFORMANCE.6
1.3. NTPCs MISSION AND VISION..8
1.4. NTPCs CORE VALUES..8
1.5. ANTA GAS POWER STATION9
1.6. PRODUCTS , SERVICES AND DELIVERY MECHENISM.12
1.7. ORGANIZATIONAL HIERACHY13
1.8. CORPORATE SOCIAL RESPONSIBILITY 14
2. TECHNOLOGY, EQUIPMENT AND FACILITIES.15
2.1. POWER GENERATION PROCESS15
2.2. OVERVIEW OF COMBINED CYCLE18
2.3. GENERAL DESCRIPTION OF COMBINED CLCLE21
2.4. OVERVIEW OF GAS TURBINE..22
2.5. OVERVIEW OF WASTE HEAT RECOVERY BOILER29
2.6. OVERVIEW OF SYSTEM
TURBINE.32
3. GENERATOR.35
3.1. BASIC DESIGN AND
TYPE.35
3.2. GENERATOR36
3.3. LOSSES IN THE
GENERATOR37
3.4. GENERATOR
PROTECTION..37
3.5. MAJOR
FAULTS..38
4. TRANSFORMER..42
4.1. SPACIFICATION OF GENERATOR TRANSFORMER.42
4.2. UNIT AUXILIARY
TRANSFORMER.43
4.3. CAPACITIVE VOLTAGE
TRANSFORMER.43
LIST OF PHOTOGRAPHS
1. NIGHT VIEW OF NTPC, ANTA.14
2. BIRDS EYE VIEW OF PLANT..16
3. BIRDS EYE VIEW OF CONTROL ROOM BUILDING.16
4. VIEW OF WASTE HEAT RECOVERY BOILERS.17
5. VIEW OF PLANT INTAKE CHANNEL.17
6. VIEW OF WHPB...........................................................................................22
7. GENERATOR ROTOR.26
8. STEAM TURBINE FLOOR.32
9. SWITCHYARD AT NTPC, ANTA52
LIST OF FIGURES
1. MAP SHOWING ALL NTPC PLANTS.3
2. FUTURE PLANS..6
3. OPERATING PLF: NTPC v/S ALL INDIA PLANTS..7
4. GENERATION v/S CAPACITY..7
5. LOCATION OF NTPC, ANTA..10
6. SOLIENT FEATURES OF NTPC, ANTA..11
7. ALLOCATION OF DIFFERENT STATES IN ANTAs POWER.12
8. ORGENIZATION CHART OF NTPC, ANTA.13
9. SIMPLE GAS TURBINE CYCLE..19
10. LINE DIAGRAM OF GAS TURBINE CYCLE.20
11. AIR INTAKE FILTERS..23
12. CROSS SECTIONAL VIEW OF GAS TURBINE..25
13. GENERATOR DATAs.27
LIST OF TABLES
1. COAL FIRED STATION QWNED BY
NTPC.4
2. GAS STATION OWNED BY
NTPC5
3. COAL FIRED STATION JOINT
VENTURE5
4. GAS STATION IN JOINT
VENTURE6
5. SPACIFICATION OF GENERATOR
TRANSFORMER42
6. SPACIFICATION OF
UAT.43