Worksheet 1: Buildg

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 164

Worksheet 1: buildg

buildg

PUSAT LATIHAN POLIS DI MUKIM PELANGAI, BENTONG, PAHANG


ELEMENTAL BREAKDOWN OF BUILDING WORKS
LAMPIRAN B

ELEMENT
NO.

DESCRIPTION
Contract
Amt (RM)

1.00
2.00
3.00
4.00
5.00
6.00

Work Below Lowest FF Level


Apron & Perimeter Drain
Frame
Upper Floor
Roof Construction & Finishes

7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00

Wall and Partition


Doors and Windows
Int. Floor Finishes
Int. Wall Finishes
Int. Ceiling Finishes
Ext. Finishes
Sanitary Fittings & BWIC

15.00
16.00

1,459,208.35
160,369.23
1,266,941.84
770,180.67
1,561,849.83

KULIAH PGA
Revised
Amt (RM)

Different
Amt (RM)

Contract
Amt (RM)

KAFETERIA
Revised
Amt (RM)

Different
Amt (RM)

Contract
Amt (RM)

DEWAN MAKAN
Revised
Amt (RM)

Different
Amt (RM)

1,919,411.90
170,387.16
1,947,138.18
1,099,197.50
1,375,380.53

460,203.55
10,017.93
680,196.34
329,016.83
-186,469.30

141,545.56
25,129.30
78,067.25
22,712.80
197,402.55

221,111.68
37,631.65
87,831.00
17,980.50
162,214.30

79,566.12
12,502.35
9,763.75
-4,732.30
-35,188.25

433,459.91
47,038.31
215,294.60
497,622.55

711,222.45
44,952.20
156,470.50
20,997.02
531,593.99

277,762.54
-2,086.11
-58,824.10
20,997.02
33,971.44

261,848.85
736,045.18
665,204.79
513,409.82
239,965.80
218,485.90
622,219.14
75,009.68

246,972.55
662,720.11
600,587.28
635,349.82
214,215.90
253,604.00
426,146.00
73,629.17

-14,876.30
-73,325.07
-64,617.51
121,940.00
-25,749.90
35,118.10
-196,073.14
-1,380.51

17,815.12
52,809.48
16,008.42
26,892.91
7,366.34
59,882.18
12,602.02

35,891.05
29,549.27
53,681.80
17,103.50
7,770.00
36,431.75
7,881.50

18,075.93
-23,260.21
37,673.38
-9,789.41
403.66
-23,450.43
-4,720.52

3,716.12
47,712.46
171,840.03
91,871.15
99,002.48
39,858.79
126,424.20
21,927.28

5,284.48
94,876.25
101,055.19
108,281.85
90,441.50
41,990.30
90,790.60
18,527.00

1,568.36
47,163.79
-70,784.84
16,410.70
-8,560.98
2,131.51
-35,633.60
-3,400.28

Internal Cold Water & Sanitary Plumbing Installation


495,500.00
Miscellaneous
5,719.98

495,500.00
5,346.00

0.00
-373.98

177,900.00
2,691.57

177,900.00
-

0.00
-2,691.57

294,800.00
-

294,800.00

0.00

-122,156.24

5,971.30

-5,971.30

31,408.47

10,125,586.10

951,470.80

844,796.80

892,978.00

48,181.20

2,121,976.35

Staircase/Step/Ramp Construction & Finishes

Builder's Work In Connection To Services

TOTAL CARRIED TO
GENERAL SUMMARY

122,156.24

9,174,115.30

page 2 of 164

2,311,283.33

-31,408.47

189,306.98

buildg

PUSAT LATIHAN POLIS DI MUKIM PELANGAI, BENTONG, PAHANG


ELEMENTAL BREAKDOWN OF BUILDING WORKS
LAMPIRAN B

ELEMENT
NO.

DESCRIPTION
Contract
Amt (RM)

1.00
2.00
3.00
4.00
5.00
6.00

Work Below Lowest FF Level


Apron & Perimeter Drain
Frame & Shear Wall
Upper Floor
Roof Construction & Finishes

7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00

Wall and Partition


Doors and Windows
Int. Floor Finishes
Int. Wall Finishes
Int. Ceiling Finishes
Ext. Finishes
Sanitary Fittings & BWIC

15.00
16.00

ASRAMA PEGAWAI LELAKI


Revised
Different
Amt (RM)
Amt (RM)

570,347.22
82,242.09
918,460.40
540,660.51
677,128.53

Contract
Amt (RM)

ASRAMA APR LELAKI


Revised
Amt (RM)

Different
Amt (RM)

Contract
Amt (RM)

ASRAMA PEG/APR WANITA


Revised
Different
Amt (RM)
Amt (RM)

557,481.70
58,853.35
824,699.90
895,879.27
489,253.02

-12,865.52
-23,388.74
-93,760.50
355,218.76
-187,875.51

529,638.00
77,057.00
874,627.50
509,707.50
680,501.50

607,072.55
55,832.79
976,468.33
791,222.34
519,840.72

77,434.55
-21,224.21
101,840.83
281,514.84
-160,660.78

566,082.80
77,057.00
920,301.00
522,541.50
678,485.50

555,223.75
58,810.44
1,166,635.90
831,045.44
545,394.65

-10,859.05
-18,246.56
246,334.90
308,503.94
-133,090.85

125,428.19
328,352.23
316,476.78
234,655.15
313,948.25
53,337.41
270,365.98
104,707.96

130,599.12
384,027.53
292,750.83
273,918.40
286,502.00
58,800.00
110,133.00
87,587.50

5,170.93
55,675.30
-23,725.95
39,263.25
-27,446.25
5,462.59
-160,232.98
-17,120.46

125,679.55
336,034.50
357,008.00
273,316.50
290,750.50
58,752.20
310,285.40
111,577.00

137,096.61
355,055.00
304,673.77
291,021.60
305,470.00
53,025.00
110,723.00
104,261.00

11,417.06
19,020.50
-52,334.23
17,705.10
14,719.50
-5,727.20
-199,562.40
-7,316.00

125,679.55
274,681.00
295,717.00
229,010.10
280,445.30
49,820.40
295,852.30
94,731.00

143,097.61
349,970.12
271,617.41
256,441.85
250,219.00
54,961.00
110,753.00
86,380.50

17,418.06
75,289.12
-24,099.59
27,431.75
-30,226.30
5,140.60
-185,099.30
-8,350.50

Internal Cold Water & Sanitary Plumbing Installation


472,800.00
Miscellaneous
-

472,800.00
49,568.00

0.00
49,568.00

431,400.00
-

431,400.00
35,118.00

0.00
35,118.00

465,800.00
-

465,800.00

0.00

-17,658.61

17,694.00

-17,694.00

17,776.00

38,668.00

20,892.00

4,972,853.62

(53,715.69)

4,984,029.15

5,078,280.71

94,251.56

4,893,980.45

Staircase/Step/Ramp Construction & Finishes

Builder's Work In Connection To Services


TOTAL CARRIED TO
GENERAL SUMMARY

17,658.61

5,026,569.31

page 3 of 164

5,185,018.67

291,038.22

buildg

PUSAT LATIHAN POLIS DI MUKIM PELANGAI, BENTONG, PAHANG


ELEMENTAL BREAKDOWN OF BUILDING WORKS
LAMPIRAN B

ELEMENT
NO.

DESCRIPTION
Contract
Amt (RM)

1.00
2.00
3.00
4.00
5.00
6.00
7.00

Work Below Lowest FF Level


Apron & Perimeter Drain
Frame & Shear Wall
Lift Core Wall
Upper Floor
Roof Construction & Finishes

8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00

Wall and Partition


Doors and Windows
Int. Floor Finishes
Int. Wall Finishes
Int. Ceiling Finishes
Ext. Finishes
Sanitary Fittings & BWIC

16.00
17.00

947,765.58
92,988.95
2,430,782.82
348,702.31
681,160.14
1,292,637.06

Staircase/Step/Ramp Construction & Finishes

427,481.04
817,631.62
1,669,510.83
908,996.22
913,913.28
89,341.17
402,329.28
244,446.29

Internal Cold Water & Sanitary Plumbing Installation


641,250.00
Miscellaneous
2,340.94
Builder's Work In Connection To Services
TOTAL CARRIED TO
GENERAL SUMMARY

24,451.42

11,935,728.95

KUARTERS E/F
Revised
Amt (RM)

Different
Amt (RM)

Contract
Amt (RM)

KUARTERS C
Revised
Amt (RM)

Different
Amt (RM)

967,320.20
90,311.00
3,094,772.96
178,246.00
2,259,627.40
598,050.75

19,554.62
-2,677.95
663,990.14
-170,456.31
1,578,467.26
-694,586.31

66,643.00
16,259.40
41,365.00
20,747.00
111,999.50

97,461.10
18,847.42
64,271.00
18,751.26
95,087.55

347,614.84
783,848.62
1,250,358.16
1,060,835.60
632,435.00
244,795.00
226,367.10
251,282.00

-79,866.20
-33,783.00
-419,152.67
151,839.38
-281,478.28
155,453.83
-175,962.18
6,835.71

16,399.50
23,924.50
60,366.50
30,711.70
25,934.20
7,311.10
24,496.85
7,496.00

641,250.00
-

0.00
-2,340.94

12,627,114.63

Contract
Amt (RM)

Different
Amt (RM)

255,208.00
52,787.00
101,180.00
230,955.04

90,945.60
8,739.40
-19,509.50

-1,995.74
-16,911.95

164,262.40
44,047.60
120,689.50
187,045.50

65,550.04
38,327.87
101,985.40
30,493.55
15,074.10
6,621.90
26,850.85
10,828.00

49,150.54
14,403.37
41,618.90
-218.15
-10,860.10
-689.20
2,354.00
3,332.00

7,698.00
38,323.50
70,484.50
33,817.80
31,349.40
17,236.20
56,167.40
23,637.50

8,289.54
55,468.52
94,496.38
52,155.00
16,726.50
30,945.60
57,927.90
22,464.80

591.54
17,145.02
24,011.88
18,337.20
-14,622.90
13,709.40
1,760.50
-1,172.70

38,700.00
-

38,700.00

0.00

203,535.00
-

203,535.00
-

0.00

-24,451.42

2,625.00

-2,625.00

23,804.00

16,126.00

-7,678.00

691,385.68

494,979.25

628,850.04

133,870.79

1,022,098.30

page 4 of 164

30,818.10
2,588.02
22,906.00

SURAU
Revised
Amt (RM)

1,198,265.28

43,909.54

176,166.98

buildg

PUSAT LATIHAN POLIS DI MUKIM PELANGAI, BENTONG, PAHANG


ELEMENTAL BREAKDOWN OF BUILDING WORKS
LAMPIRAN B

ELEMENT
NO.

DESCRIPTION
Contract
Amt (RM)

1.00
2.00
3.00
4.00
5.00
6.00

Work Below Lowest FF Level


Apron & Perimeter Drain
Frame
Upper Floor
Roof Construction & Finishes

7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00

Wall and Partition


Doors and Windows
Int. Floor Finishes
Int. Wall Finishes
Int. Ceiling Finishes
Ext. Finishes
Sanitary Fittings & BWIC

15.00
16.00

BENGKEL PENGANGKUTAN
Revised
Different
Amt (RM)
Amt (RM)

767,261.00
30,529.20
156,697.00
31,016.50
277,247.80

471,588.00
43,517.60
209,830.00
31,556.93
456,190.00

-295,673.00
12,988.40
53,133.00
540.43
178,942.20

32,890.10
89,265.70
172,735.80
67,974.50
96,021.70
46,386.90
45,954.70
19,183.40

58,662.94
146,343.80
184,867.69
71,509.65
47,829.60
49,623.90
36,241.15
15,752.20

25,772.84
57,078.10
12,131.89
3,535.15
-48,192.10
3,237.00
-9,713.55
-3,431.20

276,800.00

1,301.00

Staircase/Step/Ramp Construction & Finishes

Internal Cold Water & Sanitary Plumbing Installation


275,499.00
Miscellaneous
Builder's Work In Connection To Services
TOTAL CARRIED TO
GENERAL SUMMARY

Contract
Amt (RM)

12,300.71

2,120,964.01

2,100,313.46

SETOR PELURU KELAS C


Revised
Different
Amt (RM)
Amt (RM)

Contract
Amt (RM)

TNB 3 NOS
Revised
Amt (RM)

Different
Amt (RM)

49,982.20
9,438.00
23,302.50

87,747.85
15,671.55
52,856.65

37,765.65
6,233.55
29,554.15

193,123.10
28,692.00
56,017.20

189,278.70
51,610.59
61,912.50

-3,844.40
22,918.59
5,895.30

79,462.30

83,132.12

3,669.82

156,953.50

192,290.40

35,336.90

30,347.00
24,274.00
6,002.00
5,797.40
2,691.00
12,642.10

7,918.25
26,391.98
12,292.25
10,709.10
1,754.40
7,210.80

-22,428.75
2,117.98
6,290.25
4,911.70
-936.60
-5,431.30

103,507.90
43,047.30
6,722.30
13,741.80
6,861.70
8,396.40

18,938.85
56,087.10
77,542.05
4,358.70
20,826.90
4,876.20
21,741.90

18,938.85
-47,420.80
34,494.75
-2,363.60
7,085.10
-1,985.50
13,345.50

120,568.45

-120,568.45

737,631.65

699,463.89

(38,167.76)

-12,300.71

(20,650.55)

243,938.50

page 5 of 164

305,684.95

61,746.45

buildg

PUSAT LATIHAN POLIS DI MUKIM PELANGAI, BENTONG, PAHANG


ELEMENTAL BREAKDOWN OF BUILDING WORKS
LAMPIRAN B

ELEMENT
NO.

DESCRIPTION
Contract
Amt (RM)

1.00
2.00
3.00
4.00
5.00
6.00

Work Below Lowest FF Level


Apron & Perimeter Drain
Frame
Upper Floor
Roof Construction & Finishes

7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00

Wall and Partition


Doors and Windows
Int. Floor Finishes
Int. Wall Finishes
Int. Ceiling Finishes
Ext. Finishes
Sanitary Fittings & BWIC

15.00
16.00

Miscellaneous

Staircase/Step/Ramp Construction & Finishes

STESEN SUIS UTAMA


Revised
Amt (RM)

66,308.97
9,851.42
19,233.54
53,890.09
35,539.52
14,780.33
2,308.11
4,718.24
2,355.97
2,882.90
-

Different
Amt (RM)

Contract
Amt (RM)

197,550.78
17,952.65
21,929.00

131,241.81
8,101.23
2,695.46

53,871.08

-19.01

11,990.00
16,177.38
1,436.20
12,059.00
1,470.60
10,098.80

-23,549.52
1,397.05
-871.91
7,340.76
-885.37
7,215.90

-41,391.03

Builder's Work In Connection To Services


TOTAL CARRIED TO
GENERAL SUMMARY

72,961.25
20,381.92
45,308.50

-28,721.45
4,647.42
2,362.50

86,039.11

3,634.95
63,026.75
8,573.50
2,334.00
8,400.00
2,625.00
64,497.50
5,581.00

253,260.12

344,535.49

91,275.36

Contract
Amt (RM)

101,682.70
15,734.50
42,946.00
73,034.00

Internal Cold Water & Sanitary Plumbing Installation

41,391.03

PENTAS TABIK HORMAT


Revised
Different
Amt (RM)
Amt (RM)

Different
Amt (RM)

13,005.11

179,075.40
48,894.00
34,835.90
7,271.90
86,683.60

214,190.04
12,214.28
40,473.50
122,712.15

35,114.64
-36,679.72
5,637.60
-7,271.90
36,028.55

4,532.50
33,395.63
5,384.66
23,326.00
9,168.00
26,125.00
19,897.10
4,364.00

897.55
-29,631.12
-3,188.84
20,992.00
768.00
23,500.00
-44,600.40
-1,217.00

6,332.70
14,572.10
2,643.40
6,387.90
1,458.60
19,258.90
5,801.80

13,667.55
11,001.09
2,506.50
7,581.60
1,399.50
117,832.48
5,599.00

7,334.85
-3,571.01
-136.90
1,193.70
-59.10
98,573.58
-202.80

52,500.00
-

52,500.00

0.00

3,677.60
88,513.70

3,750.00
12,485.00

72.40
-76,028.70

4,016.00

-4,016.00

3,027.25

-3,027.25

(45,202.23)

508,434.75

448,585.90

page 6 of 164

PAM MINYAK
Revised
Amt (RM)

403,383.67

565,412.69

56,977.94

buildg

PUSAT LATIHAN POLIS DI MUKIM PELANGAI, BENTONG, PAHANG


ELEMENTAL BREAKDOWN OF BUILDING WORKS
LAMPIRAN B

ELEMENT
NO.

DESCRIPTION
Contract
Amt (RM)

Different
Amt (RM)

Contract
Amt (RM)

Revised
Amt (RM)

Different
Amt (RM)

Contract
Amt (RM)

113,748.75
28,870.40
25,256.50

6,971.35
14,455.90
-18,455.00

116,685.89

2,018.89

18,302.50
4,474.90
3,672.00
7,420.00
1,180.80
15,573.70
9,756.00

19,050.15
6,838.51
3,666.00
6,332.40
425.70
24,616.20
12,963.63

747.65
2,363.61
-6.00
-1,087.60
-755.10
9,042.50
3,207.63

0.00
0.00
0.00
0.00
0.00
0.00

Internal Cold Water & Sanitary Plumbing Installation


97,765.00
Miscellaneous
-

97,765.00
4,000.00

0.00
4,000.00

0.00

-2,625.00

460,219.13

19,878.83

1.00
2.00
3.00
4.00
5.00
6.00

Work Below Lowest FF Level


Apron & Perimeter Drain
Frame
Upper Floor
Roof Construction & Finishes

7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00

Wall and Partition


Doors and Windows
Int. Floor Finishes
Int. Wall Finishes
Int. Ceiling Finishes
Ext. Finishes
Sanitary Fittings & BWIC

15.00
16.00

DRILL SHED
Revised
Amt (RM)

Staircase/Step/Ramp Construction & Finishes

Builder's Work In Connection To Services


TOTAL CARRIED TO
GENERAL SUMMARY

106,777.40
14,414.50
43,711.50
114,667.00

2,625.00

440,340.30

page 7 of 164

Revised
Amt (RM)

0.00
0.00
0.00
0.00

0.00

Different
Amt (RM)

Worksheet 2: Summary

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 9 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 10 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 11 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 12 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 13 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 14 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 15 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 16 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 17 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 18 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 19 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 20 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 21 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 22 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 23 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 24 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 25 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 26 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 27 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 28 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 29 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 30 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 31 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 32 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 33 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 34 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 35 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 36 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 37 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 38 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 39 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 40 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 41 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 42 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 43 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 44 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 45 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 46 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 47 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 48 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 49 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 50 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 51 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 52 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 53 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 54 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 55 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 56 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 57 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 58 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 59 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 60 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 61 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 62 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 63 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 64 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 65 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 66 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 67 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 68 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 69 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 70 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 71 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 72 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 73 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 74 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 75 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 76 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 77 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 78 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 79 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 80 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 81 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 82 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 83 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 84 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 85 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 86 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 87 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 88 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 89 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 90 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 91 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 92 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 93 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 94 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 95 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 96 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 97 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 98 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 99 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 100 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 101 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 102 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 103 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 104 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 105 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 106 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 107 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 108 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 109 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 110 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 111 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 112 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 113 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 114 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 115 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 116 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 117 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 118 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 119 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 120 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 121 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 122 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 123 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 124 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 125 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 126 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 127 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 128 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 129 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 130 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 131 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 132 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 133 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 134 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 135 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 136 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 137 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 138 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 139 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 140 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 141 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 142 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 143 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 144 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 145 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 146 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 147 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 148 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 149 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 150 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 151 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 152 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 153 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 154 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 155 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 156 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 157 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 158 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 159 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 160 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 161 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 162 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 163 of 164

494,979.25

4.51%

Summary
LAMPIRAN A

ITEM

BUILDING REFERENCE

CONTRACT
AMOUNT (RM)

KULIAH PGA

9,174,115.30

KAFETERIA

844,796.80

DEWAN MAKAN

REVISED
AMOUNT (RM)

DIFFERENT
AMOUNT (RM)

%
DIFFERENT

10,125,586.10

951,470.80

10.37%

892,978.00

48,181.20

5.70%

2,121,976.35

2,311,283.33

189,306.98

8.92%

ASRAMA PEGAWAI LELAKI

5,026,569.31

4,972,853.62

(53,715.69)

-1.07%

ASRAMA APR LELAKI

4,984,029.15

5,078,280.71

94,251.56

1.89%

ASRAMA PEG./APR WANITA

4,893,980.45

5,185,018.67

291,038.22

5.95%

KUARTERS E/F

11,935,728.95

12,627,114.63

691,385.68

5.79%

KUARTERS C

628,850.04

133,870.79

27.05%

SURAU

1,022,098.30

1,198,265.28

176,166.98

17.24%

BENGKEL PENGANGKUTAN

2,120,964.01

2,100,313.46

(20,650.55)

-0.97%

SETRO PELURU KELAS C

243,938.50

305,684.95

61,746.45

25.31%

PENCAWANG TNB (3 NOS)

737,631.65

699,463.89

(38,167.76)

-5.17%

STESEN SUIS UTAMA

253,260.12

344,535.49

91,275.37

36.04%

PENTAS TABIK HORMAT

448,585.90

403,383.67

(45,202.23)

-10.08%

PAM MINYAK

508,434.75

565,412.69

56,977.94

11.21%

DRILL SHED

440,340.30

460,219.13

19,878.83
page 164 of 164

494,979.25

4.51%

You might also like