G1-VE-T-7400-C21-00051-0002 MEB Caisson Seafastening and Deck Strengthening Verification For Barges Ewan 29 & 30 - 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 39

Gorgon Project Barrow Island LNG Plant

SUPPLIERS FRONT SHEET


(FOR A4/A3 DOCUMENTS ONLY)

Purchase Order No. Package Description Suppliers Name Suppliers Reference No.

78500051 DESIGN AND CONSTRUCTION OF LNG JETTY & MARINE STRUCTURES SAIPEM - LEIGHTON CONSORTIUM N/A

SUPPLIERS DOCUMENT NO.

Suppliers Rev 1

Suppliers Rev Date 7OCT11

Suppliers Name and Signature Prepared F KOSE Checked G MACKLEY Approved A PARR

REVIEW SHALL NOT BE ASSUMED TO INDICATE EITHER RESPONSIBILITY OR LIABILITY FOR ACCURACY AND COMPLETENESS OF THIS DOCUMENT OR TO ALTER ANY CONTRACTUAL TERMS AND CONDITIONS

GORGON PROJECT BARROW ISLAND LNG PLANT


Document Title:

1. AC - ACCEPTED. WORK MAY PROCEED 2. ACC ACCEPTED WITH COMMENTS. PROCEED WITH WORK. INCORPORATE COMMENTS AND RESUBMIT 3. NAC - NOT ACCEPTED. WORK MAY NOT PROCEED. REVISE AND RESUBMIT 4. NR NOT REVIEWED. FOR INFORMATION ONLY

MEB CAISSON SEAFASTENING AND DECK STRENGTHENING VERIFICATION FOR BARGES EWAN 29 & 30
Equipment/Tag Nos.

Name .............................................................................

This document supersede /is superseded by: G1-VEPROJECT DOCUMENT NO.

Signature ........................................................................

Disc Code

Unit No.

SDRL

PO No.

Sequence No.

Rev

G1-VEDate ................................................................................

7400

C21

00051

0002

GORGON PROJECT - BARROW ISLAND LNG PLANT DESIGN AND CONSTRUCTION OF LNG JETTY & MARINE STRUCTURES MEB CAISSON SEAFASTENING AND DECK STRENGTHENING VERIFICATION FOR BARGES EWAN 29 & 30
Ref

G1-VE

T
Disc

7400
Unit No.

C21
SDR

00051
PO No.

0002
Sequential

Rev : 1

Page: 2 / 2

REVISION RECORDING

Date

Rev.

Status

Description of Revision

7Oct11

IFA

Issued for Approval

Uncontrolled when Printed

You might also like