Suppose that you are working in a software house and your responsibility is to conduct Project Reviews which plays a key role in high-quality product developmet.The project you are working on passing 30 defects to detailed design from Preliminary design. In detailed design phase 8 defects were passed on to the next phase and the remaining 22 were amplified by the ratio 1:3. In addition, there were 60 new defects introduced at this stage. In code and Unit test stage 30 defects were passed on to next phase and the remaining were amplified by the ratio 1:4 and we start to test our system and assuming 40% defect removal efficiency and 60% defect removal efficiency for the rest of the phases

a. You need to fill out the whole table below and find out how many defects present in the delivered product

0 0
30

30

0%

8 6 422*3 0% *1.5 60 25

134

292 30 10 2 40% 104*4 27 3 40 25

Preliminary Design

Detailed Design

Code /Unit test

292

292 4 117 0 50% 60% 0 Integration test

117 47 47 0 60% 5% 0 Validation test

19 47 2 0 60% 50% 0 System test

b. Now start testing your system from preliminary stage assuming 70% defect removal efficiency, 60% defect removal efficiency in detailed design and 70% defect removal efficiency in code and test phase and 60% defect removal efficiency for the rest of the phases. You need to fill out the above table considering these values and find out how many defects present in the delivered product and explain why the defects in the delivered product reduced.

0 0 10 30

70% 0%

33 7 2 7*3 60% 26*4 3 70% 4 *1.5 0% 27 * 20% 40 60 25 25

45

Preliminary Design

Detailed Design

Code /Unit test

45 18 94 0 50% 60% 0 Integration test

7 47 18 0 60% 50% 0 Validation test

7 24 0 0

3 50% 60%

System test