Cessna 15 Before Start

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

CESSNA 152

BEFORE STARTING ENGINE


1.- Preflight Inspection 2.- Seat Belts, Shoulders Harnesses 3.- Fuel shutoff Valve 4.-Radios Electrical Equipment 5.- Brakes 6.- Circuit Breakers COMPLETE ADJUST & LOCK ON OFF TEST & SET CHECK IN

BEFORE TAKEOFF
1.- Parking Brakes 2.- Cabin Doors 3.- Flight Controls 4.- Flight Instrument 5.- Fuel Shutoff Valve 6.- Throttle 7.- Mixture SET CLOSED FREE & CORRECT SET ON 1700 RPM AS REQUIRED

STARTING ENGINE
1.- Mixture 2.- Carburetor Heat 3.- Primer 4.- Throttle 5.- Propeller Area 6.- Master Switch 7.- Ignition Switch 8.- Throttle 9.- Oil Pressure & Temp 10.- Beacon & Nav Lights 11.- Radios RICH COLD (in) AS REQUIRED OPEN INCH CLEAR ON START 1000 RPM CHECK ON AS REQUIRED ON

8.- Magnetos

CHECK

a) Not exceed 125 RPM b) Not Differential Between mag 50 c) Engine Instrument & Ammeter d) Suction Gage CHECK e) Throttle 1000 RMP 9.- Radios SET 10.- Strobe Lights AS REQUIRED 11.- Throttle Friction ADJUST 12.- Brakes RELEASE

COMM FREQ MMGL


RAMPA TERRESTRE TORRE DESPACHO TERMINAL VOR ATIS ILS RWY 10 ILS RWY 28 ZAPOPAN 134.10 121.90 118.10 122.35 119.30 120.80 117.30 127.90 110.10 111.30 118.45

You might also like