Philip Wayne Project Manager M/s Galfar Engineering & Contracting SAOG P O Box 533 Muscat Sultanate of Oman
15 March 2010 Dear Sir, ASeeb Wastewater Project - Contract 3 DESIGN CHANGE NOTIFICATION & CHANGE PROPOSAL
Enclosed herewith, refer to your DTF Nos. DCN-0021 dated 07 Mar 2011, CP-0079 dated 23 Feb 2011, CP-0084 dated 07 Mar 2001 and DCN-0021 dated 07 Mar 2011; please find Change Proposals reviewed by Consultant: DTF No. ;DCN-0021: - 02/31/DCN /0095, Accepted. - 02/32/DCN /0099, Accepted. - 02/30/DCN /0100, Accepted. DTF No. ;CP-0079: - 02/29/CP /1453, Approved. DTF No. ;CP-0084: - 02/30/CP /1466, Approved. - 02/30/CP /1467, Approved.
With reference to our acceptance; please submit the revised drawing with incorporating the above changes. Ensure our instructions are followed for the change proposals submittal indicated our vide letter ref no PAR 2033/1.02.74.2677.
1|P age
Yours faithfully,