Professional Documents
Culture Documents
Calcualtions MC Chandigarh 25april
Calcualtions MC Chandigarh 25april
Car park Level Area (m2) Height (m) Volum e (m3) ACPH Air qty require d CFM Air qty require d (m3/s) Total cut-outs (m) Area availab le for fresh air (m2) Fresh air Mechani intake cal fans (conside required ring 1.66 for m/s balance velocity) 4*43250 CFM
Basement 7860 3.12 24523.20 12 173215 81.74 3 B) Normal Exhaust @ 12 ACPH Basement 7860 3.12 24523.20 12 173215 81.74 3 C) Emergency Exhaust @ 30 ACPH for Smoke evacuation Basement 7860 3.12 24523.20 30 433038.84 204.36 3
RESULT : Lower Basement 3 Mechanical supply of fresh air is required A Total of 433038.84 CFM required for the emergency situation. Some amount of fresh air will enter through MOAT and hence ramps are considered self ventilated. Four extraction points are present. SUGGESTION