TENAGA NASIONAL BERHAD

JABATAN PEMBANGUNAN ASET - SELATAN

LAPORAN RINGKASAN AKTIVITI HARIAN

NAMA PEKERJA : TARIKH


Jun 1, 09

MOHD AZYFIEDY BIN BURHANDIN PROJEK


PMU TLST

NO. PEKERJA : 10080984

GRED : TT 09

BULAN : JUNE 2009 ULASAN

KETERANGAN KERJA WIRING FOR 132 & 33 KV SYSTEM

Jun 2, 09

PMU TLST

WIRING FOR 132 & 33 KV SYSTEM

Jun 3, 09 Jun 4, 09 Jun 5, 09 Jun 6, 09 Jun 7, 09 Jun 8, 09 Jun 9, 09 Jun 10, 09 Jun 11, 09 Jun 12, 09 Jun 13, 09 Jun 14, 09 Jun 15, 09 Jun 16, 09 Jun 17, 09 Jun 18, 09 Jun 19, 09 Jun 20, 09 Jun 21, 09 Jun 22, 09 Jun 23, 09 Jun 24, 09 Jun 25, 09 Jun 26, 09 Jun 27, 09 Jun 28, 09 Jun 29, 09 Jun 30, 09

PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST

WIRING FOR 132 & 33 KV SYSTEM MEMASANG CONDUTOR & SPACER BAGI BAY TX6 MEMASANG CONDUTOR & SPACER BAGI BAY TX6 MEMASANG CONDUTOR & SPACER BAGI BAY TX6, LAY CABLE UNTUK BUSBAR PROTECTION PANEL WIRING & TESTING FOR 132& 33KV SYSTEM PREPARATION FOR RSV RSV FOR 132 & 33KV TRANSFORMER 6 BAY RSV FOR 132 & 33KV TRANSFORMER 6 BAY & COMMISSIONING TX6 BAY HOUSEKEEPING & TX5 PREPARATION FOR ERECTION TX5 HOUSEKEEPING & TX5 PREPARATION FOR ERECTION TX6 TRAVELLING TO OFFICE AHAD OFFICE

PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST

TRAVELLING TO TLST TRACING CABLE FOR 132KV SYSTEM AT TX5 BAY TRACING CABLE FOR 132KV SYSTEM AT TX5 BAY TRACING CABLE FOR 132KV SYSTEM AT TX5 BAY TRAVELLING TO OFFICE AHAD

PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST PMU TLST

TRAVELLING TO TLST CONDUCTOR & SPACER ERECTION FOR TX5 BAY CONDUCTOR & SPACER ERECTION FOR TX5 BAY ISOLATOR ARM ERECTION FOR TX5 BAY & SKELETON BAY ISOLATOR ARM ERECTION FOR TX5 BAY & SKELETON BAY TRAVELLING TO OFFICE AHAD CUTI HOL

Tandatangan Pekerja :

Diperakui Oleh : . Diluluskan Oleh :

TENAGA NASIONAL BERHAD


JABATAN PEMBANGUNAN ASET - SELATAN

LAPORAN RINGKASAN AKTIVITI HARIAN

NAMA PEKERJA : TARIKH


Nov 1, 11

MOHD AZYFIEDY BIN BURHANDIN PROJEK


PMU PGTC

NO. PEKERJA : 10080984


KETERANGAN KERJA

GRED : TT 11

BULAN : NOVEMBER 2011 ULASAN

TESTING-CONTACT RESISTANT FOR BUSBAR ISOLATOR AND LINE ISOLATOR, METER TEST FOR 132KV, UNDERVOLTAGE RELAY TEST, ERECTION- EARTHING WORK,ALIGNMENT ISOLATOR AT BAY PGDT NO.2, WIRING DEFECT RECTIFICATION. TESTING-SCADA TEST FOR 132KV AND 33KV, SECONDARY INJECTION TEST, OVERCURRENT RELAY TEST, ERECTION- EARTHING WORK, WIRING DEFECT RECTIFYING,. TESTING-SCADA TEST FOR 33KV AND 132KV, DEW POINT TEST AND PURITY TEST FOR CIRCUIT BREAKER 33KV,AVR TEST, ERECTIONEARTHING WORK FOR FENCIN, CHANGE LIMIT SWITCH AT VT SWGR, CHANGE CLAMP FOR TX1 AND TX2 HV BUSHING, DRESSING CABLE SPARE, MODIFICATION OFF MODE FAR FAN AT RTCC, TESTING-SECONDARY INJECTION, SCADA TEST FOR 132KV AND 33KV, WIRING CHECK, ERECTION- EARTHING WORK FOR FENCING AND SWITCHYARD, WIRING DEFECT RECTIFICATION. ERECTION- EARTHING WORK FOR SWITCHYARD AND FENCING SUCH AS COPPER BENDING, BRAZING AND BACKFILLING SOIL.

Nov 2, 11

PMU PGTC

Nov 3, 11 Nov 4, 11

PMU PGTC PMU PGTC

Nov 5, 11

PMU PGTC

Nov 6, 11

PMU PGTC

CUTI HARI RAYA HAJI

Nov 7, 11

PMU PGTC

CUTI GANTI HARI RAYA HAJI TESTING-WIRING CHECK, OPERATION TEST FOR RTCC, ERECTION- WIRING DEFECT RECTIFICATION, EARTHING WORK AT BAY TRANSFORMER FOR EARTHING MASS. TESTING-SCADA TEST FOR 33KV AND 132KV, DEW POINT TEST AND PURITY TEST FOR CIRCUIT BREAKER 33KV,AVR TEST, ERECTIONEARTHING WORK FOR FENCIN, CHANGE LIMIT SWITCH AT VT SWGR, CHANGE CLAMP FOR TX1 AND TX2 HV BUSHING, DRESSING CABLE SPARE, MODIFICATION OFF MODE FAR FAN AT RTCC, TESTING-SCADA TEST FOR 132KV, BUSBAR PROTECTION RELAY TEST, ERECTION-EARTHING WORK FOR FENCING, AIR BAG DEFECT RECTIFICATION, UPDATE MASTER COPY DRAWING.

Nov 8, 11

PMU PGTC

Nov 9, 11

PMU PGTC

Nov 10, 11

PMU PGTC

Nov 11, 11

PMU PGTC

TESTING- BUSBAR STABILITY FOR BAY TRANSFORMER NO.1 AND TRANSFORMER NO.2,REF STABILITY TEST FOR HV, ERECTTOR- DEFECT RECTIFYING AT SWICHGEAR BY TAMCO, WIRING DEFECT RECTIFYING,ISOLATOR ALIGNMENT

Nov 12, 11

PMU PGTC

SABTU

Nov 13, 11

PMU PGTC

AHAD PRE RSV DONE BY AD SOUTH TECHNICAL SUPPORT TEAM, TESTING -TRIP TEST FOR 132 AND 33KV, ISOLATOR ALIGNMENT CHECK FOR ALL BAYS, TEST CERTIFICATE PREPARATION, EARTHING FOR FENCING AND SWICHYARD EARTHING BRACING AND BENDING. EARTHING WORK FOR EARTHING GRID AT SWITCHYARD, TEST CERTIFICATE PREPARATION, RSV PREPARATION, DRAWING UPDATING.

Nov 14, 11

PMU PGTC

Nov 15, 11

PMU PGTC

Nov 16, 11 Nov 17, 11

PMU PGTC PMU PGTC

EARTHING WORK FOR EARTHING GRID AT SWITCHYARD, TEST CERTIFICATE PREPARATION, RSV PREPARATION, DRAWING UPDATING. EARTHING WORK FOR EARTHING GRID AT SWITCHYARD, TEST CERTIFICATE PREPARATION, RSV PREPARATION, DRAWING UPDATING.

Nov 18, 11

CUTI REHAT

Nov 19, 11

CUTI REHAT .

Nov 20, 11 Nov 21, 11

CUTI REHAT CUTI REHAT

Nov 22, 11

CUTI REHAT

Nov 23, 11

PMU PGPS

PTW ISSUE BY AMJB FOR RNR CT AT GT3B WORK, PREPARATION FOR CT DISMANTLING AT GT3 BAY, EARTHING COPPER BENDING, CUTTING AND DRILLING. GT3B BAY CURRENT TRANSFORMER DISMANTLING, OLD CONDUCTORS AND CLAMPS DISMANTLING, PHASE PAINTING AT CT, STEEL STRUCTURE MODIFICATION, INSTALLING NEW CT INSTALL CONDUCTORS AND CLAMPS AT GT3B BAYS,WIRING AND TERMINATION FOR MK AND CT,EARTHING INSTALLATION,PRIMARY INJECTION TEST FOR CT GT3B WITNESS BY AMJB SABTU

Nov 24, 11

PMU PGPS

Nov 25, 11

PMU PGPS

Nov 26, 11

PMU PGPS

Nov 27, 11 Nov 28, 11

PMU PGPS PMU PGPS

AHAD CUTI AWAL MUHARAM

Nov 29, 11

PMU PGPS

PREPARATION FOR RSV FOR GT3B BAY RNR CURRENT TRANSFORMER

Nov 30, 11

PMU PGPS

RSV GT3B GENERATOR BAY FOR R AND R CURRENT TRANSFORMER AND COMMISSIONING

Tandatangan Pekerja :

Diperakui Oleh : .

Diluluskan Oleh :