Renewal Options Analysis: East Ring Road Bridge
Renewal Options Analysis: East Ring Road Bridge
TABLE OF CONTENTS
INTRODUCTION EXISTING STRUCTURE
DECK CONDITION SURVEY FINDINGS
REPLACEMENT OPTIONS REHABILITATION OPTIONS COST MODELS LIFE-CYCLE COST ANALYSIS PREFERRED REPLACEMENT & REHABILITATION OPTIONS Q&A
INTRODUCTION
THE PURPOSE IS TO COMPLETE A RENEWAL OPTIONS ANALYSIS REPORT FOR THE EAST RING ROAD BRIDGE IN OTTAWA, ONTARIO. THE CONDITION SURVEY WAS PERFORMED BY JACQUES WHITFORD ON JUNE 14, 2006 AND BASED ON THE PROCEDURES AND FINDINGS, TO DETERMINE REPLACEMENT AND REHABILITATION OPTIONS FOR THE BRIDGE.
EXISTING STRUCTURE
THREE SPAN POST-
DIRECTION
SPAN OF 48.0m BETWEEN
ABUTMENTS
STRUCTURE WIDTH OF 13.9m
GOOD CONDITION
DECK SOFFIT
GOOD CONDITION W/ SOME DELAMINATION AT NORTH END
MINOR CRACKING AT DECK EDGES
OTHER COMPONENTS
THE PIERS, WING WALLS, SIDEWALKS ARE IN GOOD CONDITION
REPLACEMENT OPTIONS
: Replacement with post-tensioned solid concrete deck of the same thickness and configuration as the existing deck.
REPLACEMENT OPTIONS
: Replacement of deck with concrete slab on steel plate girders.
REHABILITATION OPTIONS
: Rehabilitation including converting deck to semi-integral configuration
REHABILITATION OPTIONS
: Rehabilitation including replacement of expansion joints
: Rehabilitation of the deck including sealing of expansion joints
COST MODELS
QUESTIONS?