Agreement And Conditions
Of
PAM Contract 2006
(Without Quantities)‘Table of Contents
Articles Of Agreement
Preliminary Recitals
Articles
Article
Article 2
Article 3
Article 4
Article 5
Astle 6
Atle 7
Aaticle 8
Date of agreement
Parties to agreement and their addresses
‘The nature of the works andthe location
The drawings
Contactors Obfigeions
Contract Sum
Architect
Engineer
Quantity Surveyor
Specialist Consultant
Definitions
Meanings
Attestation/Signatories Of The Partios
‘The Conditions Of Contract
Clause
10
t
12
13
4
20
21
22
23
2a
30
3
Contractor's Obligations
‘Completion of Works in accordance with Contract Docaments|
‘Temporary work and construction method
Contractor's design and responsibilities
Diserepancy or divergence between documents
Architect's Instructions (‘AP
Contractor to comply with Al
AL
Provisions empowering instructions
Failure of Contractor to comply with AT
Contract Documents, Progr
Contact Docurnents
Custody of tender documents
Copies of documents
Further drawings or details
Works Programme
Programme not pert of Contract
Architect's acceptance of programme
‘Availability of documents
Limitation of use of documents
‘As-built Drawings and operation and maintenance manuals
Statutory Obligations, Notices, Fees And Charges
Statutory requirements
Inconsistencies with statutory requirements
PAM Contract 2006 (Without Quantities)
Page‘Table of Contents (Cont'd)
‘The Conditions Of Contraet (Cont'd)
Clause
43
44
so
3
60
61
62
63
6a
65
66
67
68
100
104
102
110
HI
n2
n3
a
us
16
47
Hg.
ng.
120
RI
122
130
Ba
140
lat
142
43
144
150
151
152
153
134
Conforming to statutory obligations
Fees, levies and charges
Levels And Setting Out Of The Works
Setting out
‘Materials, Goods And Workmanship To Conform To Description, Testing And Inspection
Standards of works, materials, goods and workmanship
Provision of vouchers
Inspection and testing
Contractor's obligation not relieved
Work notin accordance with the Contract
‘No compensation for time and cost
Failure of Contracior to comply
‘Warranties in respect of materials and goods
Royalties And Intellectual Property Rights
Indemnity to Employer
Contractors Fablity to pay
Government royalties
Site Agent
Site Agent
Instructions to Site Agent
“Exclusion of Person employed on the Works
‘Access To The Works
‘Access tothe Works
Site Staft
Duty of Site Staff
Directions given by Si
Staff
Variations, Provisional And Prime Cost Sums
Definition of Variation
[No Variations required by Architect shal vi
Issue of Variations after Practical Completion
‘Alon P.C. Sums and Prov
Valuation of V
Valuation rules
‘Additional expense caused by Variation
‘Access to Contractor's books and documents
‘Variations and addtional expenses added to Contract Sum
‘Quality And Quantity Of The Works
Quality and quantity of the Works
‘Lamp Sum Contract
Contract Sum
Contract Stam not to be adjusted or altered
Materials And Goods
Matetials and goods not to be removed
Materials and goods included in certificates
Responsibility for materials and goods
‘Warranty of title of goods and materials
Practical Completion And Defects Liability
Practical Completion
Cerificate of Practical Completion
Gontraccor's failure to comply with undertaking
Schedule of Defects
PAM Contract 2006 (Without Quantities)
Page
oo