Power Scenario
Power Scenario
S.NO.
1.
2
3.
4.
5
6.
7.
8.
9.
10.
11.
12
13.
14
15.
16.
17.
18.
19.
20.
21.
22.
23
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
STATE/REGION
PROJECTS COMMISSIONED DURING 2007-2009
PROJECTS COMMISSIONED DURING 2009-2011
ALL INDIA
ALL REGIONS
INSTALLED CAPACITY OF STATES
Northern Region
Chandigarh
Delhi
Haryana
Himachal Pradesh
Jammu & Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttaranchal
Western Region
Chhatisgarh
Gujarat
Madhya Pradesh
Maharashtra
Goa
Daman and Diu
Dadra and Nagar Haveli
Southern Region
Andhra Pradesh
Karnataka
Kerala
Tamil Nadu
Pudducherry
Eastern region
Bihar
DVC
Jharkhand
Orissa
Sikkim
West Bengal
North-Eastern Region
Arunachal Pradesh
Assam
Manipur
Meghalaya
Mizoram
Nagaland
Tripura
Andaman & Nikobar Islands
Lakshadweep
PAGE NO.
3-4
5-6
7
9
10
11
13
15
19
23
27
31
35
39
43
47
49
53
57
61
65
67
69
71
73
77
81
83
87
89
91
93
95
97
101
103
107
109
111
113
115
117
119
121
123
125
PROJECT NAME
THERMAL PROJECTS
SIPAT-II UNIT-4
PARAS UNIT-1
DHOLPUR CCGT UNIT-2
BIRSINGPUR UNIT-5
DHUVRAN ST
RAIGARH (JINDAL) U-I
MEJIA UNIT-6
RATNAGIRI GAS
500
250
110
500
40
250
250
740
300
250
210
300
500
250
300
210
110
250
250
250
500
300
(XI TH PLAN) AS
ON 31.03.2008
REGION
SECTOR
STATE
TYPE
TOTAL
CAPACITY
(MW)
(27/05/2007)
(31/05/2007)
(16/06/2007)
(18/06/2007)
(13/08/2007)
(02/09/2007)
(01/10/2007)
(28/10/2007)
WR
WR
NR
WR
WR
WR
ER
WR
C.S.
S.S.
S.S.
S.S.
S.S.
P.S.
C.S.
C.S.
CHAT
MAHA
RAJ.
M.P.
GUJ.
CHAT
DVC
MAHA
COAL
COAL
GAS
COAL
GAS
COAL
COAL
GAS
500.00
250.00
110.00
500.00
40.00
250.00
250.00
740.00
(01/11/2007)
(07/11/2007)
(20/11/2007)
(24/11/2007)
(03/12/2007)
(11/12/2007)
(21/12/2007)
(24/12/2007)
(27/12/2007)
(03/01/2008)
(10/02/2008)
(06/03/2008)
(16/03/2008)
(29/03/2008)
NR
ER
SR
ER
SR
WR
ER
ER
NR
NR
WR
WR
ER
NR
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
P.S.
P.S.
C.S.
S.S.
HAR.
W.B.
A.P.
W.B.
KAR.
CHAT
W.B.
W.B.
RAJ.
PUN.
CHAT
CHAT
BIH.
HAR.
COAL
COAL
COAL
COAL
COAL
COAL
COAL
COAL
GAS
COAL
COAL
COAL
COAL
COAL
300.00
250.00
210.00
300.00
500.00
250.00
300.00
210.00
110.00
250.00
250.00
250.00
500.00
300.00
SUB-TOTAL(THERMAL)
HYDRO PROJECT
PURLIA PSS UNIT-4 (JV)
PURLIA PSS UNIT-3 (JV)
PURLIA PSS UNIT-2 (JV)
PURLIA PSS UNIT-1 (JV)
6620.00
225
225
225
225
(18/07/2007)
(27/08/2007)
(23/11/2007)
(20/01/2008)
ER
S.S.
W.B.
HYDRO
900.00
OMKARESWAR UNIT-1
OMKARESWAR UNIT-2
OMKARESWAR UNIT-3
OMKARESWAR UNIT-4
OMKARESWAR UNIT-5
OMKARESWAR UNIT-6
OMKARESWAR UNIT-7
OMKARESWAR UNIT-8
65
65
65
65
65
65
65
65
(21/07/2007)
(09/08/2007)
(29/08/2007)
(13/09/2007)
(27/09/2007)
(18/10/2007)
(27/10/2007)
(04/11/2007)
WR
C.S.
M.P.
HYDRO
520.00
BALIMELA UNIT-7
BALIMELA UNIT-8
75
75
(05/01/2008)
(27/03/2008)
ER
S.S.
ORI.
HYDRO
150.00
76
76
76
76
170
170
170
39
(16/01/2008)
(21/01/2008)
(25/01/2008)
(10/03/2008)
(06/02/2008)
(20/03/2008)
(28/03/2008)
(28/03/2008)
220 (11/04/2007)
(XI TH PLAN) AS
ON 31.03.2008
NR
S.S.
UTTA
HYDRO
304.00
ER
SR
C.S
S.S.
SIKK
A.P.
HYDRO
HYDRO
510.00
39.00
2423.00
SR
C.S.
KAR.
NUCLEAR
220.00
220.00
9263.00
SUB-TOTAL(NUCLEAR)
TOTAL(THERMAL+HYDRO+NUCLEAR):-(2007-2008)
PROJECT NAME
REGION
SECTOR
STATE
THERMAL PROJECTS
BHILAIEXN.TPPUNIT-1
250 (20/04/2008)
WR
C.S.
CHAT
VALUTHUR PH-II GTPP
59.8 (6/02/2009)
SR
S.S.
TAM.
AMARKANTAK U-5
210 (15/06/2008)
WR
S.S.
M.P.
RAIGARH (JINDAL) U-4
250 (17/06/2008)
WR
P.S.
CHAT
SAGARDIGHI U-2
300 (20/07/2008)
ER
S.S.
W.B.
GHGTPP-II,LEHAR MOB.
250 (31/07/2008)
NR
S.S.
PUN.
SIPAT ST-II U-5
500 (13/08/2008
WR
C.S.
CHAT
VALUTHUR PH-II ST
32.4 (17/02//2009)
SR
S.S.
TAM.
SUGEN CCPP
382.5 (4/02/2009)
WR
P.S.
GUJ
* KUTCH LIGNITE
75 ( 22/10/2008)
WR
S.S.
GUJ
TROMBAY Extn.
250 (26.03.2009)
WR
P.S.
MAH
SUB-TOTAL(THERMAL)
HYDRO PROJECT
GHATGHAR PSS
125 (13/05/2008)
WR
S.S.
MAHA
GHATGHAR PSS
125 (01/07/2008)
WR
S.S.
MAHA
JURALA PRIYA
39 (31/08/2008)
SR
S.S.
A.P.
BAGLIHAR UNIT-1
150 (19/09/2008)
NR
S.S.
J&K
BAGLIHAR UNIT-2
150 (26/10/2008)
NR
S.S.
J&K
BAGLIHAR UNIT-3
150 (14/11/2008)
NR
S.S.
J&K
VARAHI EXT.UNIT 1
115 (11/1/2009
SR
S.S.
KAR
VARAHI EXT.UNIT 2
115 (09/2/2009
SR
S.S.
KAR
SUB-TOTAL(HYDRO)
NUCLEAR PROJECT
SUB-TOTAL(NUCLEAR)
TOTAL(THERMAL+HYDRO+NUCLEAR):-(2008-2009)
UNITS COMMISSIONED , YET TO ACHIEVE COMMERCIAL OPERATION.
TYPE
COAL
GAS
COAL
COAL
COAL
COAL
COAL
GAS
GAS
COAL
COAL
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
TOTAL
CAPACITY
(MW)
250.00
59.8
210.00
250.00
300.00
250.00
500
32.4
382.5
250
2484.7
125.00
125.00
39.00
150.00
150.00
150.00
115.00
115.00
969.00
0.00
3453.7
PROJECT NAME
TORANGALLU U-1
SUGEN U2
GAUTAMI
KONASEEMA U-1
SUGEN
U-3
LANCO AMAR U-1
BAKRESHWAR U-5
BHILAI U-2
KAHALGAON-II U-7
MUNDRA PH-I, U-I
UTRAN
TORANGALLU U-2
SURATGARH U-6
KOTA U-7
BUDGE-BUDGE-EX
KUTCH LIGNITE
U-4
VIJAYWADA ST.IV
U-I
UTRAN CCPP-II
JALIPA LIGNITE U-I
CHABRA U-I
CHANDRAPUR U-7
Lanco Kondapalli
St-II
NCTPP DADRI
UNIT NO.5
NEW PARLI EXT
U2
ROSA ST-I U1
MUNDRA TPP,PHI,U-2
LANCO
AMARKANTAK TPS
U-2
PARAS TPS EXT.
U2
CHANDRUPURA U10
RAJIV GANDHI
(HISSAR)
GIRAL LIGNITE
TOTAL THERMAL
HYDRO PROJECTS
JURALA PRIYA U-3
TOTAL HYDRO
ON 31.03.2010
COMMISSIONING
DATE/MONTH/
YEAR
(23.4.2009)
(7.5.2009)
(3.5.2009)
(3.5.2009)
( 8.6.2009)
(4.6.2009)
(7.6.2009)
(12.07.2009)
(31.07.2009 )
(4.8.2009)
(8.8.2009)
(24.8.2009)
(29.8.2009)
(30.8.2009)
(29.9.2009)
(1.10.2009)
REGION
SR
WR
SR
SR
WR
WR
ER
WR
ER
WR
WR
SR
NR
NR
ER
WR
SECTOR
P.S.
P.S.
P.S
P.S.
P.S.
P.S.
S.S
C.S
C.S
P.S.
S.S.
P.S.
S.S.
S.S.
P.S.
S.S.
STATE
KAR
GUJ
A.P.
A.P.
GUJ
CHATT
WB
CHATT
BIHAR
GUJ
GUJ
KAR
RAJ
RAJ
WB
GUJ
TYPE
COAL
GAS
GAS
GAS
GAS
COAL
COAL
COAL
COAL
COAL
GAS
COAL
COAL
COAL
COAL
LIGNITE
TOTAL
CAPACITY
(MW)
300
382.5
464
280
382.5
300
210
250
500
330
240
300
250
195
250
75
(8.10.2009)
SR
S.S
A.P.
COAL
500
(10.10.2009)
(16.10.2009)
(30.10.2009)
(4.11.2009)
(5.12.2009)
WR
NR
NR
ER
SR
S.S.
P.S.
S.S
C.S.
P.S.
GUJ
RAJ
RAJ
DVC
A.P.
COAL
LIGNITE
COAL
COAL
GAS
134
135
250
250
233
(29.01.2010)
NR
C.S.
UP
COAL
490
(10.2.2010)
WR
S.S.
MAH
COAL
250
(10.2.2010)
(17.03.2010)
NR
WR
P.S.
P.S.
UP
GUJ
COAL
COAL
300
330
(25.03.2010)
WR
P.S.
CHAT
COAL
300
(27.03.2010)
WR
S.S.
MAHA
COAL
250
(31.03.2010)
ER
C.S.
DVC
COAL
250
(31.03.2010)
NR
S.S.
HAR
COAL
600
NR
S.S.
RAJ
LIGNITE
125
9106
SR
S.S.
A.P.
HYDRO
39.0
39.0
C.S.
C.S.
RAJ
RAJ
NUCLEAR
NUCLEAR
220
220
440
9585
(27.06.2009)
NUCLEAR PROJECT
RAPP U-5
(4.02.2010)
NR
RAPP U-6
(31.03.2010)
NR
TOTAL NUCLEAR
TOTAL (THERMAL+HYDRO+NUCLEAR )(2009-10)
SR
S.S.
KERALA
HYDRO
50
NR
NR
NR
SR
NR
NR
SR
C.S.
C.S.
C.S.
S.S
P.S.
P.S.
S.S.
J&K
J&K
J&K
A.P.
H.P.
H.P.
KER
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
40
40
40
39
96
96
50
SR
S.S
A.P
HYDRO
39
490
9730.5
ALL INDIA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
27257.00
PRIVATE
1230.0
CENTRAL
7418
TOTAL
34653.7
Coal
47267.00
4241.4
25118.3
71091.3
Thermal
Gas Diesel
4077.12 602.61
4183.0
597.1
5809.0
0.0
13721.8 1201.8
(FIGURES IN MW)
Nuclear
Total
51946.73
9021.5
30927.3
86014.8
0.0
0.0
3900.0
3900.0
R.E.S.
(MNRE)
2822.32
6784.8
0.0
7760.5
Total
73047.4
17036.3
42245.3
132329
(FIGURES IN MW)
Nuclear
R.E.S
Total
(MNRE)
52156.73
0.00
2822.32
19755.52
0.00 13964.66
39122.23
4560.00
0.00
111034.48
4560.00 16786.98
. Total
82236.05
35145.18
52367.63
169748.86
NOTE:-
78441
81492
84574
87906
93,255
100715
108866
109809
119,166
119,437
117,409
69189
71547
75066
77652
81,792
86818
90793
96785
104,009
107,286
105,060
Peak
Deficit/
Surplus
(MW)
-9252
-9945
-9508
-10254
-11,463
-13897
-18073
-13024
-15,157
-12,151
-12,349
Peak
Deficit/
Surplus
(%)
-11.8
-12.2
-11.2
-11.7
-12.3
-13.8
-16.6
-11.9
-12.7
-10.2
-10.5
Energy
Requirment
(MU)
522537
545983
559264
591373
631554
690587
739343
777039
830,594
638,181
71,363
Energy
Availability
(MU)
483350
497890
519398
548115
578819
624495
666007
691038
746,644
582,225
65,529
Energy
Deficit/
Surplus
(MU)
-39187
-48093
-39866
-43258
-52735
-66092
-73336
-86001
-83,950
-55,956
-5,834
Energy
Deficit/
Surplus
(%)
-7.5
-8.8
-7.1
-7.3
-8.4
-9.6
-9.9
-11.1
-10.1
-8.8
-8.2
NOTE :- PEAK DEMAND - 141678 MW , ENERGY REQUIREMENT - 906316 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - MARCH & OCTOBER
SOURCE:- DMLF DIVISION
4. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
3482.0
3491.0
8654.0
15627.0
Coal
19985.0
9515.0
23350.0
52850.0
Thermal
Gas
Diesel
3316.4
0.0
2037.0
0.0
1490.0
0.0
6843.4
0.0
Nuclear
Total
23301.4
11552.0
24840.0
59693.4
0.0
0.0
3380.0
3380.0
Wind
0.0
0.0
0.0
0.0
Total
26783.4
15043.0
36874.0
78700.4*
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12 (DEMAND AS PER 17TH EPS)
Period
Peak
Peak
Peak
Peak Energy
Energy
Energy
Energy
Demand
Met
Deficit/
Deficit/
RequiAvailDeficit/
Deficit/
(MW)
(MW)
Surplus
Surplus
rment
ability
Surplus
Surplus
(MW)
(%)
(MU)
(MU)
(MU)
(%)
2011-12
152746
142765
-9981
-6.5 968659 948836
-19823
-2.0
STATE
SURPLUS CAPACITY
PEAK (MW)
ENERGY (MU)
1472
4609
188
2118
772
4344
2023
23344
109
11387
1214
3137
1646
15610
45
539
6
234
HIMACHAL PRADESH
JAMMU & KASHMIR
UTTRAKHAND
DELHI
WEST BENGAL
SIKKIM
DVC
ARUNCHAL PRADESH
MIZORAM
Hydro
Coal
23620.00
31080.50
19382.50
18235.38
60.00
0.00
92378.38
13622.75
7447.50
11299.03
3882.12
1116.00
0.00
37367.40
(FIGURES IN MW)
Thermal
Gas
Diesel
3884.76
12.99
7903.81
17.48
4690.78
939.32
190.00
17.20
787.00
142.74
0.00
70.02
17456.35
1199.75
Nuclear
Total
27517.75
39001.79
25012.60
18442.58
989.74
70.02
111034.48
1620.00
1840.00
1100.00
0.00
0.00
0.00
4560.00
R.E.S.
(MNRE)
2777.32
4918.28
8517.55
344.41
223.32
6.10
16786.98
Total
45537.82
53207.57
45929.18
22669.11
2329.06
76.12
169748.86
Peak
Demand
Peak
Met
(MW)
(MW)
37,431
34,570
34,101
30,881
-3,330
-3,689
39,621
32,763
39,621
32,711
SOUTHERN
APR -DEC,2010
DECEMBER ,2010
32,214
EASTERN
APR -DEC,2010
DECEMBER ,2010
NORTHERN
APR -DEC,2010
DECEMBER ,2010
WESTERN
APR -DEC,2010
DECEMBER ,2010
Energy
/Requirment
(MU)
Energy
Availability
(MU)
-8.9
-10.7
196,439
21,490
179,927
19,885
-16,512
-1,605
-8.4
-7.5
-6,858
-17.3
195,361
169,017
-26,344
-13.5
-6,910
-17.4
23,795
20,391
-3,404
-14.3
29,054
-3,160
-9.8
167,097
157,921
-9,176
-5.5
29,022
28,057
-965
-3.3
17,831
17,394
-437
-2.5
13,767
13,085
-682
-5.0
71,770
68,574
-3,196
-4.5
12,520
11,882
-638
-5.1
7,433
7,091
-342
-4.6
NORTH-EASTERN
APR -DEC,2010
DECEMBER ,2010
Peak
Deficit
Surplus
(MW)
Peak
/Deficit
Surplus
(%)
Energy
Deficit
Surplus
(MU)
Energy
/Deficit/
Surplus
(%)
1,913
1,560
-353
-18.5
7,514
6,786
-728
-9.7
1,676
1,529
-147
-8.8
814
768
-46
-5.7
3. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Region
NORTHERN
WESTERN
SOUTHERN
EASTERN
N.EASTERN
ISLANDS
ALL-INDIA
Hydro
7488.0
1170.0
1094.0
3151.0
2724.0
0.0
15627.0
Coal
11280.0
16875.0
9885.0
14060.0
750.0
0.0
52850.0
Thermal
Gas
Diesel
1720.0
0.0
3335.0
0.0
1001.2
0.0
0.0
0.0
787.2
0.0
0.0
0.0
6843.4
0.0
Nuclear
Total
13000.0
20210.0
10886.2
14060.0
1537.2
0.0
59693.4
440.0
0.0
2940.0
0.0
0.0
0.0
3380.0
Wind
Total
0.0
0.0
0.0
0.0
0.0
0.0
0.0
20928.0
21380.0
14920.2
17211.0
4261.2
0.0
78700.4*
CHANDIGARH
DELHI
HARYANA
H.P.
J&K
PUNJAB
RAJASTHAN
U.P.
UTTRAKHAND
CHATTISGARH
GUJARAT
M.P.
MAHARASHTRA
GOA
D&D
D&N HAVELI
A.P.
KARNATAKA
KERALA
T.N
PUDUCHERRY
D.V.C
BIHAR
JHARKHAND
ORISSA
SIKKIM
W.BENGAL
ARUNACHAL P.
ASSAM
MANIPUR
MEGHALYA
MIZORAM
NAGALAND
TRIPURA
A&N ISLAND
LAKSHADWEEP
HYDRO
47.74
597.62
1334.68
1731.94
1503.53
2972.89
1467.80
1624.42
1924.18
120.00
772.00
3223.66
3331.84
0.00
0.00
0.00
3695.53
3599.80
1881.50
2122.20
0.00
193.26
129.43
200.93
2166.93
75.27
1116.30
97.57
429.72
80.98
230.58
34.31
53.32
62.37
0.00
0.00
COAL
27.09
3293.96
3812.99
118.30
263.70
3208.19
4659.48
7261.84
261.26
4464.00
8698.89
4360.10
12203.05
283.03
21.04
25.04
6969.88
4752.67
765.38
5519.81
207.01
3703.10
1661.70
1737.88
3028.10
68.10
6756.34
0.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
GAS
15.32
1079.51
560.29
61.88
304.14
288.92
665.03
549.97
69.35
0.00
3894.49
257.18
3475.93
48.00
4.20
27.10
2878.40
220.00
533.58
1026.30
32.50
90.00
0.00
0.00
0.00
0.00
100.00
21.05
441.32
25.96
25.96
16.28
19.19
181.84
0.00
0.00
DIESEL
0.00
0.00
3.92
0.13
8.94
0.00
0.00
0.00
0.00
0.00
17.48
0.00
0.00
0.00
0.00
0.00
36.80
234.42
256.44
411.66
0.00
0.00
0.00
0.00
0.00
5.00
12.20
15.88
20.69
45.41
2.05
51.86
2.00
4.85
60.05
9.97
10
THERMAL
TOTAL
42.41
4373.47
4377.20
180.31
576.78
3497.11
5324.51
7811.81
330.61
4464.00
12610.86
4617.28
15678.98
331.03
25.24
52.14
9885.08
5207.09
1555.40
6957.77
239.51
3793.10
1661.70
1737.88
3028.10
73.10
6868.54
36.93
522.01
71.37
28.01
68.14
21.19
186.69
60.05
9.97
figures in MW
NUCLEAR
R.E.S
TOTAL
8.84
122.08
109.16
34.08
77.00
208.04
573.00
335.72
22.28
47.52
559.32
273.24
690.14
25.80
7.38
8.46
214.28
195.36
78.10
478.50
16.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.05
105.90
337.82
129.33
295.63
1162.45
612.18
132.97
218.95
1851.04
244.36
2573.88
30.05
0.00
0.00
721.59
2437.49
142.86
5215.59
0.03
0.00
64.10
4.05
68.60
47.11
160.55
78.58
27.11
5.45
31.03
36.47
28.67
16.01
5.35
0.75
98.99
5094.22
5926.94
2284.15
2286.64
6973.67
8527.76
10384.13
2410.04
4850.47
15793.22
8358.54
22274.84
386.88
32.62
60.60
14516.48
11439.74
3657.86
14774.06
255.82
3986.36
1855.23
1942.86
5263.63
195.48
8145.39
213.08
978.84
157.80
289.62
138.92
103.18
265.07
65.40
10.72
NORTHERN REGION
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
6716.4
786.0
5498.0
13000.3
Coal
10977.5
0.0
7216.0
18193.5
Gas
Thermal
Diesel
1011.2
0.0
2312.0
3323.2
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
7052.55
978.00
5592.20
13622.75
14112.00
870.00
8638.00
23620.00
1469.20
71.50
2344.06
3884.76
(FIGURES IN MW)
Nuclear
15.0
0.0
0.0
15.0
Total
12003.7
0.0
9528.0
21531.7
0.0
0.0
1180.0
1180.0
R.E.S.
(MNRE)
247.9
565.5
0.0
813.4
Total
18967.9
1351.5
16206.0
36525.4
(FIGURES IN MW)
Diesel
Total
12.99
0.00
0.00
12.99
15594.19
941.50
10982.06
27517.75
Nuclear
R.E.S.
(MNRE)
Total
0.00
0.00
1620.00
1620.00
948.07
1829.25
0.00
2777.32
23594.81
3748.75
18194.26
45537.82
Peak
Demand
Peak
Met
(MW)
(MW)
23200
24092
23817
26834
28154
31516
32462
33034
37,159
37,431
34,570
21346
21889
22271
24125
25200
26644
29495
29504
31,439
34,101
30,881
Peak
Deficit/
Surplus
(MW)
Peak
Deficit
Surplus
(%)
-1854
-2203
-1546
-2709
-2954
-4872
-2967
-3530
-5,720
-3,330
-3,689
-8
-9.1
-6.5
-10.1
-10.5
-15.5
-9.1
-10.7
-15.4
-8.9
-10.7
Energy
/Requirment
(MU)
Energy
Availability
(MU)
150383
156610
161595
175498
188591
202125
219797
227104
254,231
196,439
21,490
Energy
Deficit/
Surplus
(MU)
142410
144218
152743
159358
168611
179986
196147
201951
224,661
179,927
19,885
Energy
Deficit/
Surplus
(%)
-7973
-12392
-8852
-16140
-19980
-22139
-23650
-25153
-29,570
-16,512
-1,605
-5.3
-7.9
-5.5
-9.2
-10.6
-11.0
-10.8
-11.1
-11.6
-8.4
-7.5
NOTE :- PEAK DEMAND - 44496 MW , ENERGY REQUIREMENT - 275171 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) JULY, AUGUST &
SEPTEMBER
4. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Region
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
Coal
5870.0
2680.0
2730.0
11280.0
964.0
1792.0
4732.0
7488.0
Thermal
Gas
1720.0
0.0
0.0
1720.0
Diesel
0.0
0.0
0.0
0.0
Nuclear
Wind
0.0
0.0
440.0
440.0
0.0
0.0
0.0
0.0
7590.0
2680.0
2730.0
13000.0
TH
Peak
Demand
(MW)
Peak
Met
(MW)
2011-12
48137
43790
Peak
Deficit/
Surplus
(MW)
-4347
Peak
Deficit/
Surplus
(%)
-9.0
11
Total
Total
Energy
Requirment
(MU)
294841
Energy
Availability
(MU)
293501
Energy
Deficit/
Surplus
(MU)
-1340
8554.0
4472.0
7902.0
20928.0
EPS)
Energy
Deficit/
Surplus
(%)
-0.5
12
CHANDIGARH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
15.0
0.0
15.0
0.0
Coal
0.0
0.0
26.0
26.0
0.0
0.0
30.2
30.2
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
47.74
47.74
0.00
0.00
27.09
27.09
Diesel
Total
0.00
0.00
0.00
0.00
0.00
0.00
42.41
42.41
0.00
0.00
15.32
15.32
Nuclear
Total
2.0
0.0
41.0
41.0
R.E.S.
(MNRE)
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
Total
2.0
0.0
76.2
76.2
(FIGURES IN MW)
Thermal
Gas
Coal
(FIGURES IN MW)
Peak
Deficit
Surplus
(%)
Nuclear
R.E.S.
(MNRE)
Total
0.00
0.00
8.84
8.84
0.00
0.00
0.00
0.00
0.00
0.00
98.99
98.99
Energy
/Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
180
206
188
224
240
264
275
279
308
180
206
188
224
240
247
275
279
308
0
0
0
0
0
-17
0
0
0
0
0
0
0
0
-6.4
0
0
0.0
1110
1146
1088
1157
1260
1343
1446
1414
1,576
1108
1141
1087
1148
1258
1341
1446
1414
1,528
-2
-5
-1
-9
-2
-2
0
0
-48
-0.2
-0.4
-0.1
-0.8
-0.2
-0.1
0.0
0.0
-3.0
301
301
0.0
1,187
1,187
0.0
197
197
0.0
109
109
0.0
NOTE :- PEAK DEMAND - 389 MW , ENERGY REQUIREMENT - 2125 MU FOR THE YEAR 2010-1011(AS PER 17TH EPS
REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - JUNE & JULY
Peak
Demand
(MW)
2011-12
420
Peak
Met
(MW)
82
Peak
Deficit/
Surplus
(MW)
-338
Peak
Deficit/
Surplus
(%)
-80.4
Energy
Requirment
(MU)
2308
Energy
Availability
(MU)
705
Energy
Deficit/
Surplus
(MU)
-1603
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective state.
13
Energy
Deficit/
Surplus
(%)
-69.4
T
y
p
e
S
t
a
t
u
s
Installed
Capacity
(MW)
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
3
1
1
COMM 120.00
H
H
N
U
U
C
240.00
400.00
440.00
240.00
400.00
440.00
1
2
3
COMM 440.00
KAHALGAON UT
6,7
TOTAL
WITH BEST EFFORTS
*KOLDAM
H
RIHAND-III U-5
T
TOTAL
1000.00
1000.00
COMM 1000.00
CENTRALSECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2
&3
*URI -II
*KOTESHWAR
RAPP U-5& 6
Capacity
Addition
During
XIth Plan
(MW)
Benefits
Shares
of
state
(MW)
Commissioned/
slipped
during
2007-2012
(MW)
Unit wise
Commissioning
Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010
23.07.2010
23.07.2010
(2010-2012)
(2010-2012)
4.02.2010,
31.03.2010
16.3.2008,
31.07.2009
13
U
U
800.00
1000.00
800.00
500.00
GRAND-TOTAL:-
4
2.72
6.72
19.72
(2011-2012)
(2011-2012)
8. T&D LOSSES
YEAR
T&D LOSSES %
2003- 04
39.06333 39.06
2004-05
30.37
2005-06
31.64
2006-07
25.13
2007-08
23.77
9. PEAK & ENERGY TABLE
(As per 17th EPS Report vs Actual Achieved)
PEAK
ENERGY
YEAR
Requirment Actual
Demand
as per
17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
248
267
288
311
335
361
389
420
Requirement
as Per 17th
EPS
224
240
264
275
279
308
14
1295
1407
1528
1659
1802
1957
2125
2308
Actual
Requirement
1157
1260
1343
1446
1414
1,576
DELHI
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
0.0
0.0
597.7
597.7
Thermal
Gas
Diesel
612.4
0.0
0.0
0.0
207.0
0.0
819.4
0.0
Coal
320.0
0.0
1967.0
2287.0
Diesel
0.00
0.00
0.00
0.00
(FIGURES IN MW)
Nuclear
Total
932.4
0.0
2174.0
3106.4
0.0
0.0
47.0
47.0
(FIGURES IN MW)
Nuclear
Total
1185.40
0.00
3116.57
4373.47
R.E.S.
(MNRE)
0.0
0.0
0.0
0.0
Total
932.4
0.0
2818.7
3751.1
R.E.S.
(MNRE)
Total
0.00
1.05
0.00
1.05
1185.40
72.55
3836.27
5094.22
0.00
0.00
122.08
122.08
Peak
Demand
(MW)
Peak
Met
(MW)
3118
3417
3389
3558
3722
4000
4075
4036
4,502
2879
3101
3289
3490
3600
3736
4030
4034
4,408
Peak
Deficit/
Surplus
(MW)
-239
-316
-100
-68
-122
-264
-45
-2
-94
4,810
3,471
4,739
3,471
-71
0
Peak
Deficit/
Surplus
(%)
-7.7
-9.2
-3.0
-1.9
-3.3
-6.6
-1.1
0.0
-2.1
Energy
Requirment
(MU)
19350
19946
20440
21157
21602
22397
22439
22398
24,277
Energy
Availability
(MU)
18741
19567
20160
20952
21281
22012
22301
22273
24,094
Energy
Deficit/
Surplus
(MU)
-609
-379
-280
-205
-321
-385
-138
-125
-183
Energy
Deficit/
Surplus
(%)
-3.1
-1.9
-1.4
-1.0
-1.5
-1.7
-0.6
-0.6
-0.8
-1.5
0.0
20,518
1,817
20,458
1,817
-60
-2
-0.3
-0.1
NOTE :- PEAK DEMAND - 5657 MW , ENERGY REQUIREMENT - 33600 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT ) , OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
JUNE & JULY.
Peak
Demand
(MW)
2011-12
6092
Peak
Met
(MW)
8115
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
2023
Energy
Requirment
(MU)
33.2
36293
Energy
Availability
(MU)
59637
EPS)
Energy
Deficit/
Surplus
(MU)
23344
Energy
Deficit/
Surplus
(%)
64.3
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
15
PROJECT
STATUS
TYPE
Under Construction
GAS/LNG
CAPACITY
(MW)
1250
commiissioned
GAS/LNG
250
AGENCY
PRAGATI-III (BAWANA)
PPCL
PRAGATI-III (BAWANA)
PPCL
U-1
SUB TOTAL -State Sector
24.10.2010
1500
NDPL
RITHALA CCPP
Comm 71.5
GAS/LNG
108
4.10.2010, 9.12.2010
108
1608
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - DELHI
Status
Status
Installed
Capacity
Type
Project Name
(MW)
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
Commissioned/
slipped during
2007-2012
(MW)
(MW)
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2 & 3
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
66
29
16
*URI -II
DADRI EXT.U-5&6
H
T
U
U
240.00
980.00
240.00
980.00
30
882
COMM 980.00
INDRA GANDHI
(JHAJJAR)
*KOTESHWAR
RAPP U-5,6
1500.00
1500.00
750
COMM 500.00
H
N
U
C
400.00
440.00
400.00
440.00
39
56
COMM 440.00
KAHALGAON U-6,7
1000.00
1000.00
60
COMM 1000.00
1000.00
1000.00
1000.00
875
500
1000
COMM 120.00
Unit wise
Commissioning
Date/ (Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010
23.07.2010
23.07.2010
(2010-2012)
29.01.2010
30.07.2010
31.10.2010
(2010-2012)
4.02.2010
31.03.2010
16.3.2008
31.07.2009
(2010-2011)
(2010-2011)
(2010-2012)
4303
1500.00
1050
COMM 250.00
24.10.2010
COMM 71.5
4.10.2010, 9.12.2010
1050
108.00
500.00
800.00
660.00
16
108
108
65.95
101
75
241.9
5
5702.95
(2011-2012)
(2011-2012)
(2011-2012)
C COMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS
ARE YET TO BE ISSUED ARE TENTATIVE
** AS PER MOM HELD ON 18.02.2005 IN MOP "THERE WAS A CONSENSUS THAT THE BENEFICIARY
STATES ARE TO
PROVIDE OFF-PEAK POWER FROM THEIR ALLOCATION FOR THE PUMPING
OPERATION OF TEHRI PSS AS A BANKING TRANSACTION.
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
44444444
T&D LOSSES %
43.66
45.40
48.61
33.00
28.65
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
3626
3905
4205
4529
4877
5253
5657
6092
Actual
Demand
3558
3722
4000
4075
4036
4502
17
Requirement as
Per 17th EPS
21157
22853
24684
26662
28799
31107
33600
36293
Actual
Requirement
21157
21602
22397
22439
22398
24277
18
HARYANA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
Thermal
Diesel
0.0
3.9
0.0
0.0
534.0
0.0
534.0
3.9
Coal
1602.5
0.0
380.0
1982.5
946.6
0.0
384.1
1330.7
(FIGURES IN MW)
Nuclear
Gas
Total
1606.4
0.0
914.0
2520.4
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
884.51
0.00
450.17
1334.68
3410.00
0.00
402.99
3812.99
25.00
0.00
535.29
560.29
Total
2553.3
6.0
1374.1
3933.4
(FIGURES IN MW)
Thermal
Gas
Coal
0.0
0.0
76.0
76.0
R.E.S.
(MNRE)
0.3
6.0
0.0
6.3
Nuclear
Diesel
Total
3.92
0.00
0.00
3.92
3438.92
0.00
938.28
4377.20
0.00
0.00
109.16
109.16
R.E.S.
(MNRE)
Total
70.10
35.80
0.00
105.90
4393.53
35.80
1497.61
5926.94
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
3000
3411
3465
4037
4333
4837
4956
5511
6,133
2900
3325
3278
3621
3931
4201
4821
4791
5,678
-100
-86
-187
-416
-402
-636
-135
-720
-455
-3.3
-2.5
-5.4
-10.3
-9.3
-13.1
-2.7
-13.1
-7.4
18138
20298
20743
21801
23791
26249
29353
29085
33,441
17839
19688
19779
20562
21631
23132
25652
26625
32,023
-299
-610
-964
-1239
-2160
-3117
-3701
-2460
-1,418
-1.6
-3.0
-4.6
-5.7
-9.1
-11.9
-12.6
-8.5
-4.2
6,142
5,570
5,574
4,768
-568
-802
-9.2
-14.4
26,571
2,927
24,901
2,757
-1,670
-170
-6.3
-5.8
NOTE :- PEAK DEMAND - 6343 MW , ENERGY REQUIREMENT - 35493 MU FOR THE YEAR 2010-2011 (AS PER 17TH EPS
REPORT ), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) JULY & AUGUST.
PRIVATE SECTOR:
NIL
TH
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
EPS)
Energy
Deficit/
Surplus
(%)
2011-12
6839
5192
-1647
-24.1
38417
37005
-1412
-3.7
th
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
19
2
3
PROJECT
AGENCY
CAPACITY
(MW)
STATUS
TYPE
Under Construction
COAL
1000
2010-12
Commissioned
COAL
500
31.10..2010
1500
Commissioned
COAL
600
1.11.2007
29.03.2008
Commissioned
COAL
600
31.03.2010
Commissioned
COAL
600
1.10.2010
1800
TOTAL - (HARYANA)
3300
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - HARYANA
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
28
12
7
*URI -II
INDAR GANDHI
(JHAJJAR)
*KOTESHWAR
RAPP U-5& 6
H
T
U
U
240.00
1500.00
240.00
1500.00
13
750
H
N
U
C
400.00
440.00
400.00
440.00
17
25
COMM 440.00
KAHALGAON U-6,7
1000.00
1000.00
23
COMM 1000.00
MEZIA PH II
U
1000.00
1000.00
CENTRAL-SECTOR TOTAL:-
100
975
STATE-SECTOR
YAMUNA NAGAR U-1,2
600.00
600.00
600
COMM 600.00
1200.00
1200.00
1200
COMM 600.00
COMM 600.00
PRAGATI(BAWANA)
1500.00
1500.00
STATE - SECTOR TOTAL:-
150
1950
COMM 250.00
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2 & 3
UMPP
*ULTRA MEGA MUNDRA
U-1
UMPP- TOTAL
WITH BEST EFFORTS
RIHAND-III U-5
*KOLDAM
*ULTRAMEGA SASAN U-1
*ULTRA MEGA MUNDRA
U-2
4000.00
800.00
80
COMM 120.00
COMM
500.00
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010,
23.07.2010
23.07.2010
(2010-2012)
31.10.2010
(2010-2012)
4.02.2010
31.03.2010
16.03.2008
31.7.2009
(2010-2011)
1.11.2007
29.03.2008
31.03.2010,
1.10.2010
24.10.2010
(2011-2012)
80
T
H
T
T
U
U
U
U
1000.00
800.00
3960.00
4000.00
500.00
800.00
660.00
800.00
20
28.02
43
75
80
(2011-2012)
(2011-2012)
(2011-2012)
(2011-2012)
Capacity
Addition
During XIth
Plan
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
TOTAL
GRAND-TOTAL:-
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
226.02
3231.02
8.T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
32.
T&D LOSSES %
32.07
32.11
30.51
33.35
32.83
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
4037
4353
4693
5060
5456
5883
6343
6839
Actual
Demand
4037
4333
4837
4956
5511
6133
21
Requirement
as Per 17th EPS
Actual
Requirement
21801
23890
25858
27989
30295
32791
35493
38417
21801
23791
26249
29353
29085
33441
22
HIMACHAL PRADESH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
476.7
386.0
760.0
1622.7
0.0
0.0
103.0
103.0
Thermal
Gas
Diesel
0.0
0.1
0.0
0.0
62.0
0.0
62.0
0.1
Diesel
(FIGURES IN MW)
Nuclear
Total
0.1
0.0
165.0
165.1
0.0
0.0
14.0
14.0
(FIGURES IN MW)
Nuclear
Total
0.13
0.00
0.00
0.13
0.13
0.00
180.18
180.31
R.E.S.
(MNRE)
Total
58.6
0.0
0.0
58.6
535.4
386.0
939.0
1860.4
R.E.S.
(MNRE)
Total
0.00
0.00
34.08
34.08
337.82
0.00
0.00
337.82
731.55
578.00
974.60
2284.15
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Peak
Demand
(MW)
562
770
670
678
788
873
1061
1055
1,118
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
562
770
670
671
749
873
1010
1014
1,158
Peak
Deficit/
Surplus
(%)
0
0
0
-7
-39
0
-51
-41
40
0.0
0.0
0.0
-1.0
-4.9
0.0
-4.8
-3.9
3.6
Energy
Requirment
(MU)
3293
3427
3439
4000
4302
5136
5992
6260
7,047
3206
3341
3424
3917
4258
4996
5814
6241
6,769
Energy
Deficit/
Surplus
(%)
-87
-86
-15
-83
-44
-140
-178
-19
-278
-2.6
-2.5
-0.4
-2.1
-1.0
-2.7
-3.0
-0.3
-3.9
1,250
1,187
-63
5,623
5,399
-224
-5.0
-4.0
1,250
1,187
-63
690
561
-129
-5.0
-18.7
NOTE :- PEAK DEMAND - 1451 MW , ENERGY REQUIREMENT - 8545 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT ) , OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
JANUARY & FEBRUARY.
Peak
Demand
(MW)
2011-12
1611
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
3083
Peak
Deficit/
Surplus
(%)
1472
91.4
Energy
Requirment
(MU)
Energy
Availability
(MU)
9504
14113
th
Energy
Deficit/
Surplus
(MU)
4609
Energy
Deficit/
Surplus
(%)
48.5
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
23
1
2
3
4
5
PROJECT
AGENCY
PARBATI - III
NHPC
CHAMERA III
NHPC
KOLDAM
NTPC
SUB TOTAL -Central sector
SUB TOTAL -state sector
BUDHIL
LANCO IPP
ALLAIN DUHANGAN U-1 & 2
RSWML
MALANA II
EVREST PC
KARCHAM WANGTOO
JPKHCL
SORANG
SORAND PC
SUB TOTAL -private sector
TOTAL (HP)
STATUS
TYPE
Under Construction
Under Construction
Under Construction
HYDRO
HYDRO
HYDRO
Under Construction
Commissioned
Under Construction
Under Construction
Under Construction
HYDRO
HYDRO
HYDRO
HYDRO
HYDRO
CAPACITY
(MW)
520
231
800
1551
0.00
70
192
100
1000
100
1462
3013
2010-11
16.09.10, 18.09.2010
2010-11
2011-12
2011-12
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - HIMACHAL PRADESH
Capacity
Addition
During XIth
Plan (MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
*URI -II
*KOTESHWAR
RAPP U-5 & 6
H
H
H
H
N
U
U
U
U
C
520.00
231.00
240.00
400.00
440.00
520.00
231.00
240.00
400.00
440.00
85
37
8
10
15
COMM 440.00
KAHALGAON U-6,7
1000.00
1000.00
15
COMM 1000.00
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
(2010-2012)
(2010-2012)
4.02.2010
31.03.2010
16.03.2008
31.7.2009
0.00
PRIVATE-SECTOR
KARCHAM WANGTOO
ALLAIN DUHANGAN U-1,2
BUDHIL
MALANA-II
H
H
H
H
U
U
U
U
1000.00
1000.00
1000
192.00
192.00
192
70.00
70.00
70
100.00
100.00
100
PRIVATE-SECTOR TOTAL: 1362.00
H
H
T
U
U
U
800.00
100.00
1000.00
800.00
100.00
500.00
GRAND-TOTAL :
COMM 192.00
130
100
16.85
246.85
1778.85
24
(2011-2012)
16.09.10, 18.09.2010
(2010-2011)
(2010-2011)
(2011-2012)
(2011-2012)
(2011-2012)
8.T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
22
T&D LOSSES %
22.76
28.90
23.55
19.77
16.98
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
0772
0858
0953
1059
1176
1306
1451
1611
Actual
Demand
678
788
873
1061
1055
1118
25
Requirement
as Per 17th EPS
4516
5022
5585
6212
6909
7684
8545
9504
Actual
Requirement
4000
4302
5136
5992
6260
7047
26
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
429.1
0.0
699.2
1128.4
0.0
0.0
235.0
235.0
Thermal
Gas
Diesel
175.0
8.9
0.0
0.0
129.0
0.0
304.0
8.9
Nuclear
Total
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
780.00
0.00
723.53
1503.53
0.00
0.00
263.70
263.70
175.00
0.00
129.14
304.14
(FIGURES IN MW)
183.9
0.0
364.0
547.9
R.E.S.
(MNRE)
0.0
0.0
68.0
68.0
Total
12.7
0.0
0.0
12.7
625.7
0.0
1131.2
1757.0
(FIGURES IN MW)
Nuclear
Diesel
Total
8.94
0.00
0.00
8.94
183.94
0.00
392.84
576.78
0.00
0.00
77.00
77.00
R.E.S.
(MNRE)
129.33
0.00
0.00
129.33
Total
1093.27
0.00
1193.37
2286.64
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
1209
1250
1268
1316
1450
1530
1950
2120
2,247
999
1060
1218
1166
1225
1309
1439
1380
1,487
-210
-190
-50
-150
-225
-221
-511
-740
-760
-17.4
-15.2
-3.9
-11.4
-15.5
-14.4
-26.2
-34.9
-33.8
6635
7243
7105
8138
9065
11725
11782
11467
13,200
5899
6327
6780
7387
7672
7983
8362
8698
9,933
-736
-916
-325
-751
-1393
-3742
-3420
-2769
-3,267
-11.1
-12.6
-4.6
-9.2
-15.4
-31.9
-29.0
-24.1
-24.8
2,250
1,800
1,503
1,320
-747
-480
-33.2
-26.7
10,101
1,200
7,556
982
-2,545
-218
-25.2
-18.2
NOTE :- PEAK DEMAND - 1977 , ENERGY REQUIREMENT - 10889 MU FOR THE YEAR 2010-2011 (AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - DECEMBER.
390 MW (DULHASTI)
NIL
PRIVATE SECTOR:
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
2063
2251
188
9.1
11202
13320
2118
18.9
th
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
27
S.NO.
1
2
3
4
PROJECT
CAPACITY
(MW)
AGENCY
STATUS
TYPE
SEWA II U-1
NHPC
Commissioned
HYDRO
40
SEWA II U-2&3
NHPC
Commissioned
HYDRO
80
Under Construction
Under Construction
Under Construction
HYDRO
HYDRO
HYDRO
240
45
44
449
Commissioned
HYDRO
450
URI II
NHPC
NIMOO BAZGO
NHPC
CHUTAK
NHPC
SUB TOTAL - Central sector
BAGLIHAR U-1,2
&3
JKPDC
LIKELY YEAR /
DATE OF
COMMISSIONING
22.06.2010
23.07.2010,
23.07.2010
2010-12
2011-12
2011-12
19.09.2008,
26.10.2008
14.11.2008
450
899
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - JAMMU & KASHMIR
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2 & 3
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
33
15
23
COMM 120.00
*URI II
*KOTESHWAR
KAHALGAON 6,7
H
H
T
U
U
C
240.00
400.00
1000.00
240.00
400.00
1000.00
46
19
29
COMM 1000.00
45.00
44.00
45.00
44.00
45
44
*NIMOO BAZCO
H U
*CHUTAK
H U
CENTRAL-SECTOR TOTAL: STATE-SECTOR
BAGLIHAR U-1,2 & 3
H C
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010,
23.07.2010
23.07.2010
(2010-2012)
(2010-2012)
16.03.2008
31.7.2009
(2011-2012)
(2011-2012)
254
450.00
450.00
450
COMM 450.00
19.09.2008
26.10.2008
14.11.2008
450
800.00
1000.00
800.00
500.00
50
32.81
82.81
786.81
28
(2011-2012)
(2011-2012)
8.T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
44444444
T&D LOSSES %
45.54
41.08
44.93
51.98
55.71
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
1316
1600
1669
1741
1817
1895
1977
2063
Actual
Demand
1316
1450
1530
1950
2120
2247
29
Requirement
as Per 17th EPS
Actual
Requirement
8138
9450
9722
10001
10289
10585
10889
11202
8138
9065
11725
11782
11467
13200
30
PUNJAB
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
2322.9
4.2
736.0
3063.2
Coal
2130.0
0.0
543.0
2673.0
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
264.0
0.0
264.0
0.0
Nuclear
Total
2130.0
0.0
807.0
2937.0
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
2230.23
0.00
742.66
2972.89
2630.00
0.00
578.19
3208.19
25.00
0.00
263.92
288.92
(FIGURES IN MW)
0.0
0.0
151.0
151.0
R.E.S.
(MNRE)
111.3
24.0
0.0
135.3
Total
4564.3
28.2
1694.0
6286.5
(FIGURES IN MW)
Nuclear
R.E.S.
(MNRE)
Diesel
Total
0.00
0.00
0.00
0.00
2655.00
0.00
842.11
3497.11
0.00
0.00
208.04
208.04
222.55
73.08
0.00
295.63
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Total
5107.78
73.08
1792.81
6973.67
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Deficit/
Surplus
(%)
5420
5849
5922
7122
7731
8971
8672
8690
9,786
4936
5455
5622
5559
6158
6558
7340
7309
7,407
-484
-394
-300
-1563
-1573
-2413
-1332
-1381
-2,379
-8.9
-6.7
-5.1
-21.9
-20.3
-26.9
-15.4
-15.9
-24.3
28780
30082
31420
33393
35682
38641
42372
41635
45,731
27577
28313
30520
30383
32591
34839
38795
37238
39,408
-1203
-1769
-900
-3010
-3091
-3802
-3577
-4397
-6,323
-4.2
-5.9
-2.9
-9.0
-8.7
-9.8
-8.4
-10.6
-13.8
9,399
5,489
7,938
5,285
-1,46
-204
-15.5
-3.7
35,729
3,175
33,454
3,054
-2,275
-121
-6.4
-3.8
NOTE :- PEAK DEMAND - 10435 MW , ENERGY REQUIREMENT - 56136 MU FOR THE YEAR 2010-2011 (AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
JULY & AUGUST.
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
11000
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
5488
Peak
Deficit/
Surplus
(%)
-5512
-50.1
Energy
Requirment
(MU)
60489
Energy
Availability
(MU)
37008
Energy
Deficit/
Surplus
(MU)
-23481
Energy
Deficit/
Surplus
(%)
-38.8
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
31
S.NO.
1
PROJECT
GH TPP-II U-,3,4
AGENCY
STATUS
TYPE
CAPACITY
(MW)
PSEB
Commissioned
COAL
500
LIKELY YEAR /
DATE OF
COMMISSIONING
3.01.2008
31.07.2008
500
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - PUNJAB
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2 & 3
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
41
18
10
COMM 120.00
*URI -II
*KOTESHWAR
RAPP U-5&6
KAHALGAON U-6,7
H
H
N
T
U
U
C
C
240.00
400.00
440.00
1000.00
240.00
400.00
440.00
1000.00
19
24
45
35
COMM 440.00
COMM 1000.00
CENTRAL-SECTOR TOTAL:STATE-SECTOR
GHTPP-II U-3,4
T C
PRAGATI(BAWANA)
T U
STATE - SECTOR TOTAL:PRIVATE-SECTOR
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010
23.07.2010
23.07.2010
(2010-2012)
(2010-2012)
4.02.2010, 31.03.2010
16.03.2008
31.7.2009
192
500.00
500.00
500
COMM 500.00
1500
1500.00
150
650
COMM 250.00
PRIVATE-SECTOR TOTAL:-
03.01.2008
31.07.2008
24.10.2010
0.00
UMPP
*ULTRA MEGA MUNDRA
U-1
UMPP-TOTAL
4000.00
800.00
100
(2011-2012)
100
800.00
1000.00
3960.00
800.00
500.00
660.00
4000.00
800.00
63
93
(2011-2012)
(2011-2012)
(2011-2012)
100
(2011-2012)
41.33
297.33
1239.33
32
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
T&D LOSSES %
22222222 25.42
25.42
27.56
26.61
22.82
ENERGY
YEAR
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Requirment
as
per
17th EPS
Actual
Demand
Requirement
as Per 17th EPS
Actual
Requirement
7605
8016
8451
8908
9390
9899
10435
11000
7122
7731
8971
8672
8690
9786
35861
38642
41639
44868
48347
52096
56136
60489
33393
35682
38641
42372
41635
45731
33
34
RAJASTHAN
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
1008.8
0.0
405.8
1414.7
Coal
2545.0
0.0
600.0
3145.0
Thermal
Gas
Diesel
223.8
0.0
0.0
0.0
221.0
0.0
444.8
0.0
Nuclear
Total
2768.8
0.0
821.0
3589.8
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
987.96
0.00
479.84
1467.80
3615.00
270.00
774.48
4659.48
Thermal
Gas
443.80
0.00
221.23
665.03
(FIGURES IN MW)
0.0
0.0
469.0
469.0
R.E.S.
(MNRE)
Total
10.4
457.0
0.0
467.4
3788.1
457.0
1695.8
5940.9
(FIGURES IN MW)
Nuclear
Diesel
Total
0.00
0.00
0.00
0.00
4058.80
270.00
995.71
5324.51
0.00
0.00
573.00
573.00
R.E.S.
(MNRE)
30.25
1132.20
0.00
1162.45
Total
5077.01
1402.20
2048.55
8527.76
Peak
Demand
(MW)
Peak
Met
(MW)
3700
3880
4134
4786
5588
5794
6374
6303
6,859
3657
3820
4134
4414
4850
4946
5564
6101
6,859
Peak
eficit/
Surplus
(MW)
-43
-60
0
-372
-738
-848
-810
-202
0
6,821
6,651
6,651
6,651
-170
0
Peak
Deficit/
Surplus
(%)
-1.2
-1.5
0.0
-7.8
-13.2
-14.6
-12.7
-3.2
0.0
Energy
Requirment
(MU)
24745
25917
26611
29207
32052
33236
36738
37797
44,109
Energy
Availability
(MU)
24495
25382
26486
28974
30879
31715
35597
37388
43,062
Energy
Deficit/
Surplus
(MU)
-250
-535
-125
-233
-1173
-1521
-1141
-409
-1,047
Energy
Deficit/
Surplus
(%)
-1.0
-2.1
-0.5
-0.8
-3.7
-4.6
-3.1
-1.1
-2.4
-2.5
0.0
32,241
4,256
31,920
4,256
-321
0
-1.0
0.0
NOTE :- PEAK DEMAND - 7927 MW , ENERGY REQUIREMENT - 45701 MU FOR THE YEAR 2010-2011 (AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - JANUARY & FEBRUARY.
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
8482
6644
-1839
-21.7
48916
47152
-1764
-3.6
th
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
35
slipped during
2007-2012
(MW)
Status
Status
Addition During
XIth Plan
(MW)
Type
Capacity
(MW)
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
58
26
13
COMM 120.00
*URI -II
BARSINGSAR LIG.
U-1,2
*KOTESHWAR
RAPP U-5&6
H
T
U
U
240.00
500.00
240.00
250.00
27
250
COMM 125.00
H
N
U
C
400.00
440.00
400.00
440.00
34
88
COMM 440.OO
KAHALGAON U-6,7
1000.00
1000.00
49
COMM 1000.00
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2 & 3
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010
23.07.2010
23.07.2010
(2010-2012)
28.06.2010
(2010-2012)
4.02.2010
31.03.2010
16.03.2008
31.7.2009
CENTRAL-SECTOR TOTAL:-545
STATE-SECTOR
SURATGARH U-6
CHABRA I TPS U,1,2
T
T
C
C
250.00
500.00
250.00
500.00
250
500
COMM 250.00
COMM 500.00
GIRAL LIGNITE U- 2
T C
DHOLPUR CCGT
G C
U-2 & ST
KOTA U-7
T C
STATE - SECTOR TOTAL:PRIVATE-SECTOR
JALIPA LIGNITE U-I,2
T U
250.00
220.00
125.00
220.00
125
220
COMM 125.00
COMM 220.00
195.00
195.00
195
1290
COMM 195.0
1080.00
1080.00
1080
COMM 270.00
PRIVATE-SECTOR TOTAL:UMPP
*ULTRA MEGA MUNDRA
T U
U-1
UMPP-TOTAL
WITH BEST EFFORTS
RIHAND-III U-5
T U
*KOLDAM
H U
29.08.2009
30.10.2010
4.05.2010
(2009-2010)
16.06.2007
27.12.2007
30.08.2009
16.10.2009
8.07.2010
1080
4000.00
800.00
80
(2011-2012)
80
1000.00
800.00
500.00
800.00
36
57.61
88
(2011-2012)
(2011-2012)
U
U
3960.00
4000.00
660.00
800.00
66
80
(2011-2012)
(2011-2012)
291.61
3286.61
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
T&D LOSSES %
44444444 43.74
44.68
39.92
35.60
34.71
ENERGY
YEAR
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Requirment
as
per
17th EPS
Actual
Demand
Requirement
as Per 17th
EPS
Actual
Requirement
4967
5650
6046
6469
6923
7408
7927
8482
4786
5588
5794
6374
6303
6859
30392
32530
34819
37268
39890
42697
45701
48916
29207
32052
33236
36738
37797
44109
37
38
UTTAR PRADESH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
541.1
0.0
1073.0
1614.1
Coal
4380.0
0.0
2391.1
6771.1
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
550.0
0.0
550.0
0.0
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
524.10
0.00
1100.32
1624.42
4072.00
600.00
2589.84
7261.84
Nuclear
Total
4380.0
0.0
2941.1
7321.1
R.E.S.
(MNRE)
0.0
0.0
204.0
204.0
Total
11.4
78.5
0.0
89.9
4932.5
78.5
4218.1
9229.0
(FIGURES IN MW)
Thermal
Gas
Coal
(FIGURES IN MW)
0.00
0.00
549.97
549.97
Diesel
Total
0.00
0.00
0.00
0.00
4072.00
600.00
3139.81
7811.81
Nuclear
R.E.S.
(MNRE)
Total
0.00
0.00
335.72
335.72
25.10
587.08
0.00
612.18
4621.20
1187.08
4575.85
10384.13
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
7584
6700
7218
7877
8175
9184
11104
10587
10,856
6887
5750
6029
6268
6588
7531
8568
8248
8,563
-697
-950
-1189
-1609
-1587
-1653
-2536
-2339
-2,293
-9.2
-14.2
-16.5
-20.4
-19.4
-18.0
-22.8
-22.1
-21.1
48332
44777
46552
52017
55682
57441
62628
69207
75,930
43545
36789
40399
41585
44033
48370
51335
54309
59,508
-4787
-7988
-6153
-10432
-11649
-9071
-11293
-14898
-16,422
-9.9
-17.8
-13.2
-20.1
-20.9
-15.8
-18.0
-21.5
-21.6
10,731
10,299
10,672
8,584
-59
-1,715
-0.5
-16.7
57,173
6,468
48,234
5,544
-8,939
-924
-15.6
-14.3
NOTE :- PEAK DEMAND - 12896 MW , ENERGY REQUIREMENT - 74845 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) OCTOBER & MAY.
Peak
Demand
(MW)
2011-12
13947
Peak
Met
(MW)
10630
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
-3317
-23.8
Energy
Requirment
(MU)
79268
th
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
71773
-7495
Energy
Deficit/
Surplus
(%)
-9.5
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
39
slipped during
2007-2012
(MW)
Status
Status
Addition During
XIth Plan
(MW)
Type
Capacity
(MW)
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II, U-1,2 & 3
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
110
49
27
*URI -II
DADRI EXT U-5&6
H
T
U
U
240.00
980.00
240.00
980.00
51
98
COMM 980.00
*KOTESHWAR
RAPP U-5&6
H
N
U
C
400.00
440.00
400.00
440.00
152
86
COMM 440.00
KAHALGAON U-6,7
1000.00
1000.00
100
COMM 1000.00
COMM 120.00
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010
23.07.2010
23.07.2010
(2010-2012)
29.01.2010
30.07.2010
(2010-2012)
4.02.2010
31.03.2010
16.03.2008
31.7.2009
CENTRAL-SECTOR TOTAL:-673
STATE-SECTOR
HARDUAGANJ EXT
U- 8,9
PARICHHA EXTN
U-5,6
500.00
500.00
500
(2010-2011)
500.00
500.00
500
(2010-2011)
600.00
1000
600.00
600
T U
1200.00
1200.00
PRIVATE-SECTOR TOTAL:-
1200
1800.00
3960.00
660.00
T
T
H
U
U
U
600.00
500.00
800.00
600.00
500.00
800.00
40
83
83.0
600
160.06
169
COMM 600.00
10.02.2010,
26.06.2010
(2010-2012)
(2011-2012)
(2011-2012)
(2011-2012)
(2011-2012)
1000.00
500.00
TOTAL
GRAND-TOTAL:-
500
1429.06
4985.06
(2011-2012)
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
33333333
T&D LOSSES %
35.17
34.39
32.63
33.49
28.60
ENERGY
YEAR
Requirement
as
per
17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
8057
8714
9425
10193
11024
11923
12896
13947
Actual
Demand
7877
8175
9184
11104
10587
10856
41
Requirement
as Per 17th EPS
53033
56167
59486
63002
66725
70668
74845
79268
Actual
Requirement
52017
55682
57441
62628
69207
75930
42
UTTARAKHAND
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
986.9
400.0
304.8
1691.7
0.0
0.0
242.9
242.9
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
69.0
0.0
69.0
0.0
(FIGURES IN MW)
Nuclear
R.E.S.
(MNRE)
Total
0.0
0.0
311.9
311.9
0.0
0.0
16.0
16.0
(FIGURES IN MW)
Nuclear
Total
0.00
0.00
0.00
0.00
0.00
0.00
330.61
330.61
Total
43.1
0.0
0.0
43.1
R.E.S.
(MNRE)
0.00
0.00
22.28
22.28
1030.0
400.0
632.7
2062.7
Total
132.92
0.05
0.00
132.97
1385.07
400.05
624.92
2410.04
Period
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
APR-DEC ,2010
DEC ,2010
Peak
Met
(MW)
Peak
deficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
771
777
846
991
1108
1200
1267
1,397
705
737
794
857
991
1150
1267
1,313
-66
-40
-52
-134
-117
-50
0
-84
-8.6
-5.1
-6.1
-13.5
-10.6
-4.2
0.0
-6.0
3774
4197
4628
5155
5957
7047
7841
8,921
3670
4108
4470
5008
5599
6845
7765
8,338
-104
-89
-158
-147
-358
-202
-76
-583
-2.8
-2.1
-3.4
-2.9
-6.0
-2.9
-1.0
-6.5
1,494
1,472
1,420
1,289
-74
-183
-5.0
-12.4
7,296
848
6,818
807
-478
-41
-6.6
-4.8
NOTE :- PEAK DEMAND - 1428 MW , ENERGY REQUIREMENT - 7838 MU FOR THE YEAR 2010-2011 (AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) DECEMBER & JANUARY
* ACTUAL DEMAND HAS ALREADY EXCEEDED THE DEMAND FORCAST OF 17TH EPS FOR THE YEAR 2010-2011 IN THE
MONTH OF MAY,2010.
280 MW (DHAULIGANGA)
400 MW (VISHNUPRAYAG)
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
1533
Peak
Met
(MW)
2305
Peak
deficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
772
50.4
Energy
Requirment
(MU)
8445
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
12789
4344
Energy
Deficit/
Surplus
(%
51.4
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
43
S.NO.
1
PROJECT
KOTESHWAR
CAPACITY
(MW)
AGENCY
STATUS
TYPE
THDC
Under Construction
HYDRO
MANERI BHALI
U-1,2,3 & 4
400
UJVNL
Commissioned
HYDRO
304
21.01.2008,
10.03.2008
25.01.2008
16.01.2008
304
GVK
SRINAGAR
400
LIKELY YEAR /
DATE OF
COMMISSIONING
2010-12
Under Construction
HYDRO
330
330
TOTAL (UTTARAKHAND)
1034
2011-12
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - UTTRAKHAND
Capacity
Addition During
XIth Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
CENTRAL-SECTOR
*PARBATI ST-III
*CHAMERA III
SEWA ST.II,
U-1,2 & 3
H
H
H
U
U
C
520.00
231.00
120.00
520.00
231.00
120.00
20
9
5
COMM 120.00
*URI -II
KAHALGAON II U-6,7
H
T
U
C
240.00
1000.00
240.00
1000.00
9
19
COMM 1000.00
*KOTESHWAR
RAPP U-5&6
H
N
U
C
400.00
440.00
400.00
440.00
64
15
CENTRAL-SECTOR TOTAL:STATE-SECTOR
MANERI BHALI
H C
U-1,2,3 & 4
COMM 440.00
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
(2011-2012)
(2010-2012)
22.06.2010
23.07.2010
23.07.2010
(2010-2012)
16.3.2008
31.7.2009
(2010-2012)
4.02.2010
31.03.2010
141
304.00
304.00
304
COMM 304.00
21.01.2008,
10.03.2008
25.01.2008
16.01.2008
304
3960.00
660.00
TOTAL-UMPP
17
(2011-2012)
17
*KOLDAM
800.00
800.00
30
(2011-2012)
SRINAGAR HEP
330.00
330.00
330
(2011-2012)
RIHAND-III U-5
500.00
500.00
19.62
(2011-2012)
TOTAL-
379.62
841.62
44
C - COMMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED
ARE TENTATIVE
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
T&D LOSSES %
44444444 49.23
39.30
35.96
34.48
23.77
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
914
1000
1074
1153
1238
1330
1428
1533
Actual
Demand
846
991
1108
1200
1267
1397
45
Requirement
as Per 17th EPS
5010
5398
5816
6267
6752
7275
7838
8445
Actual
Requirement
4628
5155
5957
7047
7841
8921
46
WESTERN REGION
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
Coal
14791.5
2290.0
5492.7
22574.2
5474.8
444.0
1000.0
6918.8
Thermal
Gas
Diesel
1390.8
17.3
1658.0
0.2
2772.0
0.0
5820.8
17.5
Nuclear
Total
16199.6
3948.2
8264.7
28412.5
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
5480.50
447.00
1520.00
7447.50
16602.50
7000.00
7478.00
31080.50
1564.72
2805.50
3533.59
7903.81
(FIGURES IN MW)
R.E.S.
(MNRE)
0.0
0.0
1840.0
1840.0
Total
69.6
1805.2
0.0
1874.8
21744.0
6197.4
11104.7
39046.1
(FIGURES IN MW)
Nuclear
Diesel
Total
17.28
0.20
0.00
17.48
18184.50
9805.70
11011.59
39001.79
0.00
0.00
1840.00
1840.00
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
R.E.S.
(MNRE)
Total
318.49
4599.79
0.00
4918.28
23983.49
14852.49
14371.59
53207.57
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
26510
28677
29704
31085
31772
36453
38277
37240
39,609
22024
22853
23657
24128
25257
27463
29385
30153
32,586
-4486
-5824
-6047
-6957
-6515
-8990
-8892
-7087
-7,023
-16.9
-20.3
-20.4
-22.4
-20.5
-24.7
-23.2
-19.0
-17.7
175016
190745
191680
204048
215983
232391
247173
254475
258,528
156793
166687
171236
181010
186904
196117
208228
213715
223,127
-18223
-24058
-20444
-23038
-29079
-36274
-38945
-40760
-35,401
-10.4
-12.6
-10.7
-11.3
-13.5
-15.6
-15.8
-16.0
-13.7
39,621
39,621
32,763
32,711
-6,858
-6,910
-17.3
-17.4
195,361
23,795
169,017
20,391
-26,344
-3,404
-13.5
-14.3
NOTE :- PEAK DEMAND - 44427 MW ,ENERGY REQUIREMENT - 281220 MU FOR THE YEAR 2010-2011 (AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
DECEMBER,NOVEMBER & MARCH.
4. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
250.0
400.0
520.0
1170.0
Coal
7525.0
4370.0
4980.0
16875.0
Thermal
Gas
Diesel
1467.0
0.0
1128.0
0.0
740.0
0.0
3335.0
0.0
Nuclear
Total
8992.0
5498.0
5720.0
20210.0
Wind
0.0
0.0
0.0
0.0
Total
0.0
0.0
0.0
0.0
TH
2011-12
Peak
Demand
(MW)
47108
Peak
Met
(MW)
43475
Peak
Deficit/
Surplus
(MW)
-3633
Peak
Deficit/
Surplus
(%)
-7.7
Energy
Requirment
(MU)
294860
Energy
Availability
(MU)
294456
th
Energy
Deficit/
Surplus
(MU)
-404
9242.0
5898.0
6240.0
21380.0
EPS)
Energy
Deficit/
Surplus
(%)
-0.1
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the
respective state.
47
48
CHHATTISGARH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
125.0
0.0
0.0
125.0
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Coal
1530.0
0.0
325.0
1855.0
Nuclear
Total
1530.0
0.0
325.0
1855.0
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
120.00
0.00
0.00
120.00
2060.00
1600.00
804.00
4464.00
R.E.S.
(MNRE)
0.0
0.0
48.0
48.0
Total
13.1
19.5
0.0
32.5
1668.0
19.5
373.0
2060.6
(FIGURES IN MW)
Thermal
Gas
Coal
(FIGURES IN MW)
0.00
0.00
0.00
0.00
Diesel
Total
0.00
0.00
0.00
0.00
2060.00
1600.00
804.00
4464.00
Nuclear
R.E.S.
(MNRE)
Total
0.00
0.00
47.52
47.52
19.05
199.90
0.00
218.95
2199.05
1799.90
851.52
4850.47
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
APR-DEC ,2010
DEC ,2010
Peak
Demand
(MW)
1548
1730
1893
2133
2631
2421
2887
2,819
2,913
2,521
Peak
Met
(MW)
1492
1566
1749
1857
1907
2188
2830
2,703
2,759
2,499
Peak
eficit/
Surplus
(MW)
-56
-164
-144
-276
-724
-233
-57
-116
-154
-22
Peak
Deficit/
Surplus
(%)
-3.6
-9.5
-7.6
-12.9
-27.5
-9.6
-2.0
-4.1
-5.3
-0.9
Energy
Requirment
(MU)
9868
10147
11747
13012
14063
14079
14866
11,009
Energy
Availability
(MU)
9561
9876
11553
12540
13169
13409
14475
10,739
Energy
Deficit/
Surplus
(MU)
-307
-271
-194
-472
-894
-670
-391
-270
Energy
Deficit/
Surplus
(%)
-3.1
-2.7
-1.7
-3.6
-6.4
-4.8
-2.6
-2.5
7,589
800
7,458
795
-131
-5
-1.7
-0.6
NOTE :- PEAK DEMAND - 3277 MW, ENERGY REQUIREMENT - 20047 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH, APRIL &
FEBRUARY.
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
3565
Peak
Met
(MW)
3501
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
-64
Energy
Requirment
(MU)
-1.8
21785
Energy
Availability
(MU)
27470
Energy
Deficit/
Surplus
(MU)
5685
Energy
Deficit/
Surplus
(%)
26.2
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
49
S.NO.
PROJECT
AGENCY
STATUS
TYPE
CAPACITY
(MW)
NTPC
Commissioned
COAL
500
Commissioned
Under Construction
Commissioned
Commissioned
Commissioned
COAL
COAL
COAL
COAL
COAL
Commissioned
COAL
500
1980
250
250
500
3980
250
250.00
SIPATII, U-4
2
3
4
5
6
SIPATII, U-5
NTPC
SIPAT-I
NTPC
BHILAI JV U-1
NTPC
BHILAI JV U-2
NTPC
KORBA-III, U-7
NTPC
SUB TOTAL-Central sector
KORBA EAST EXT. U-2
CSEB
SUB TOTAL-state sector
1
2
3
4
RAIGARH PH I
U-1,2,&3
JIN. POWER
Commissioned
COAL
750
RAIGARH PH II U-4
JIN. POWER
LANCO(AMARKANTAK) U-1
LANCO-IPP
LANCO(AMARKANTAK) U-2
LANCO-IPP
SUB TOTAL-private sector
TOTAL (CHG)
Commissioned
Commissioned
Commissioned
COAL
COAL
COAL
250
300
300
1600.00
5830.00
LIKELY YEAR /
DATE OF
COMMISSIONING
27.05.2007
13.08.2008
2010-12
24.04.2008
12.07.2009
26.12.2010
11.12.2007
2.09.2007,
10.02.2008,
6.03.2008
17.06.2008
4.6.2009
25.03.2010
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - CHATTISGARH
Capacity
Addition
During
XIth Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning
Date/ (Likely Date of
Commissioning)
27.05.2008
13.08.2008
20.04.2008
12.07.2009
26.12.2010
16.03.2008
31.07.2009
Status
Status
Installed
Capacity
(MW)
Type
Project Name
CENTRAL-SECTOR
SIPAT STPS II U-4,5
1000.00
1000.00
158
COMM 1000.00
BHILAI JV U-1,2
500.00
500.00
50
COMM 500.00
T
T
C
C
500.00
1000.00
500.00
1000.00
81
20
COMM 500.00
COMM 1000.00
CENTRAL-SECTOR TOTAL:STATE-SECTOR
KORBA EAST EXTN U-2
PRIVATE-SECTOR
LANCO (AMARKANTAK)
U-1,2
RAIGARH TPP-(JINDAL)
PH I& II U-1,2,3,4
309
C
250.00
250.00
STATE - SECTOR TOTAL:-
COMM 250.00
11.12.2007
04.06.2009,
25.03.2010
2.09.2007,
10.02.2008,
6.03.2008
17.06.2008
600.00
600.00
600
COMM 600.00
1000.00
1000.00
1000
COMM 1000.00
250
250
1600
T U
1000.00
500.00
T U
1980.00
1980.00
T U
1000.00
500.00
PRIVATE-SECTOR TOTAL:GRAND-TOTAL:-
50
31.27
313
31.27
375.54
2534.54
(2011-12)
(2010-12)
(2011-12)
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
T&D LOSSES %
44444444 42.55
28.06
31.06
31.71
29.79
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
per 17th EPS
1893
2150
2339
2545
2769
3012
3277
3565
ENERGY
Actual
Demand
1893
2133
2631
2421
2887
2819
51
Requirement
as Per 17th EPS
11750
13230
14377
15623
16977
18448
20047
21785
Actual
Requirement
11747
13012
14063
14079
14866
11009
52
GUJARAT
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
777.0
0.0
0.0
777.0
Thermal
Gas
Diesel
478.8
17.3
1430.0
0.2
424.3
0.0
2333.1
17.5
Coal
4429.0
640.0
1142.0
6211.0
Nuclear
Total
4925.1
2070.2
1566.3
8561.6
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
772.00
0.00
0.00
772.00
4440.00
2630.00
1628.89
8698.89
(FIGURES IN MW)
R.E.S.
(MNRE)
0.0
0.0
559.0
559.0
19.3
389.0
0.0
408.3
5721.4
2459.2
2125.3
10305.9
(FIGURES IN MW)
Nuclear
892.72
2577.50
424.27
3894.49
Total
Diesel
Total
17.28
0.20
0.00
17.48
5350.00
5207.70
2053.16
12610.86
0.00
0.00
559.32
559.32
R.E.S.
(MNRE)
Total
29.90
6151.90
7028.84
2612.48
15793.22
1821.14
0.00
1851.04
Peak
Demand
(MW)
8005
8641
9820
10162
9783
11619
12119
11841
10,406
10,786
9,908
Peak
Met
(MW)
6700
7336
7204
7578
7610
8110
8885
8960
9,515
9,947
9,056
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-1305
-1305
-2616
-2584
-2173
-3509
-3234
-2881
-891
-839
-852
-16.3
-15.1
-26.6
-25.4
-22.2
-30.2
-26.7
-24.3
-8.6
-7.8
-8.6
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(% )
53693
60175
57171
59681
57137
62464
68747
67482
70,369
47530
53316
50292
52724
52436
54083
57614
60851
67,220
-6163
-6859
-6879
-6957
-4701
-8381
-11133
-6631
-3,149
-11.5
-11.4
-12.0
-11.7
-8.2
-13.4
-16.2
-9.8
-4.5
53,129
6,387
49,792
5,849
-3,337
-538
-6.3
-8.4
NOTE :- PEAK DEMAND - 13692 MW, ENERGY REQUIREMENT - 81261 MU FOR THE YEAR 2010-2011 (AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) OCTOBER, APRIL & MARCH.
2011-12
Peak
Demand
(MW)
14374
Peak
Met
(MW)
13480
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
-894
Energy
Requirment
(MU)
-6.2
Energy
Availability
(MU)
85445
92575
th
Energy
Deficit/
Surplus
(MU)
7130
Energy
Deficit/
Surplus
(%)
8.3
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
53
UTRAN CCPP
6
7
1
3
4
5
GSECL
8.8.2009
10.10.2009
Commissioned
GAS/LNG
374
Under Construction
Under Construction
GAS/LNG
GAS/LNG
Commissioned
GAS/LNG
351
702
2282
382.5
TORRENT
Commissioned
GAS/LNG
765
ADANI
Commissioned
COAL
1320
ADANI
Commissioned
COAL
660
26.12.2010
ADANI
Under Construction
COAL
660
2011-12
2010-11
2010-12
04.02.2009
7.05.2009,
08.06.2009
4.08.2009,
17.03.2010
02..08.2010,20.12.2010
TATA
Under Construction
COAL
1600
2011-12
POWER
ADANI
7
MUNDRA PH-III U-1,2,3
Under Construction
COAL
1980
2011-12
POWER
SUB TOTAL-private sector
7367.5
TOTAL (GUJARAT)
9649.5
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - GUJARAT
Project Name
Installed
Capacity
Benefits
Commissioned/
Unit wise
6
Shares of
state
(MW)
slipped during
2007-2012
(MW)
Commissioning Date/
(Likely Date of
Commissioning)
27.05.2008 &
13.08.2008
26.12.2010
16.03.2008
31.07.2009
Status
Status
Addition
During XIth
Plan
(MW)
Type
Capacity
(MW)
CENTRAL-SECTOR
SIPAT STPS II U-4,5
1000.00
1000
273
COMM 1000.00
T
T
U
C
500.00
1000.00
500
1000
120
94
COMM 500
COMM 1000.00
T
G
T
C
C
C
75.00
40.00
250.00
75
40
250
75
40
250
COMM 75.00
COMM 40.00
COMM 250.00
UTRAN CCPP
374.00
374
374
COMM 240.00
COMM 134.00
T
G
G
U
U
U
490.00
490.00
351.00
351.00
702.00
702.00
STATE - SECTOR TOTAL:-
490
351
702
2282
PRIVATE-SECTOR
SUGEN TORRENT
BLOCK I, II, III
1147.50
1147.50
1147.50
1320.00
1320
1320
COMM 1320.00
T
T
U
U
1320.00
1980.00
1320
660
1320
660
COMM 660.00
54
COMM 1147.5
1.10.2009
13.08.2007
12.04.2010
12.04.2010
8.8.2009
10.10.2009
(2011-2012)
(2010-2011)
(2010-2012)
4.02.2009,
7.05.2009,
08.06.2009
4.08.2009,
17.03.2010,
2.08.2010 ,20.12.2010
26.12.2010
(2011-12)
Capacity
Addition
During XIth
Plan
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
TOTAL-PRIVATE-SECTOR
UMPP
*MUNDRA UMPP U-1
T
T
T
U
U
U
U
U
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
4447.5
4000.00
800
UMPP- TOTAL:1000.00
1980.00
1000.00
1980.00
4000.00
500.00
1980.00
500.00
1320.00
800.00
TOTAL:-
380
380.00
(2011-12)
119.96
540
119.96
1320
380
(2011-12)
(2010-12)
(2011-12)
(2011-12)
(2011-12)
2479.92
GRAND-TOTAL:10076.42
NOTE :- U - UNDER CONSTRUCTION PROJECTS
C - COMMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED
ARE TENTATIVE
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
2422222
T&D LOSSES %
24.20
30.43
27.91
24.87
26.13
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
10226
10736
11271
11833
12422
13042
13692
14374
Actual
Demand
10162
9783
11619
12119
11841
10406
55
Requirement
as Per 17th EPS
Actual
Requirement
60124
63220
66475
69898
73497
77282
81261
85445
59681
57137
62464
68747
67482
70369
56
MADHYA PRADESH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
1724.6
13.5
1000.0
2738.1
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
257.2
0.0
257.2
0.0
Coal
2157.5
0.0
1282.7
3440.2
Nuclear
Total
2157.5
0.0
1539.9
3697.4
Hydro
1703.66
0.00
1520.00
3223.66
(FIGURES IN MW)
R.E.S.
(MNRE)
0.0
0.0
273.0
273.0
Total
17.3
59.0
0.0
76.3
3899.4
72.5
2812.9
6784.7
(FIGURES IN MW)
Thermal
Nuclear
Coal
Gas
Diesel
Total
2807.50
0.00
1552.60
4360.10
0.00
0.00
257.18
257.18
0.00
0.00
0.00
0.00
2807.50
0.00
1809.78
4617.28
R.E.S.
Total
(MNRE)
0.00
0.00
273.24
273.24
11.76
4522.92
232.60
3603.02
8358.54
232.60
0.00
244.36
Peak
Demand
(MW)
5683
5869
6158
5944
6558
8090
7200
7564
7,490
8,690
8,690
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
4457
4157
4799
4846
5136
6404
6436
6810
6,415
7,650
7,175
Peak
Deficit/
Surplus
(%)
-1226
-1712
-1359
-1098
-1422
-1686
-764
-754
-1,075
-1,040
-1,515
-21.6
-29.2
-22.1
-18.5
-21.7
-20.8
-10.6
-10.0
-14.4
-12.0
-17.4
Energy
Requirment
(MU)
31013
31705
32744
34810
36846
38710
41560
42054
43,179
Energy
Availability
(MU)
26233
26493
28417
30097
31619
32834
35700
34841
34,973
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(% )
-4780
-5212
-4327
-4713
-5227
-5876
-5860
-7213
-8,206
-15.4
-16.4
-13.2
-13.5
-14.2
-15.2
-14.1
-17.2
-19.0
33,773
27,114
-6,659
-19.7
5,090
3,911
-1,179
-23.2
NOTE :- PEAK DEMAND - 8129 MW , ENERGY REQUIREMENT - 47011 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
DECEMBER & FEBRUARY.
Peak
Demand
(MW)
2011-12
8462
Peak
Met
(MW)
7555
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
-907
-10.7
Energy
Requirment
(MU)
49338
Energy
Availability
(MU)
44085
Energy
Deficit/
Surplus
(MU)
-5253
Energy
Deficit/
Surplus
(%)
-10.6
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
57
Benefits/
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
OMKARESHWAR U-1
U-2
U-3
U-4
U-5
U-6
U-7
U-8
SIPAT STPS II U-4,5
520.00
520.00
520
COMM 520.00
1000.00
1000.00
143
COMM 1000.00
T
T
U
C
500.00
1000.00
500.00
1000.00
78
49
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
CENTRAL-SECTOR TOTAL:STATE-SECTOR
BIRSINGPUR EXT. U-5
AMARKANTAK U-5
PRIVATE-SECTOR
MAHESHWAR
PVT.SEC-TOTAL
WITH BEST EFFORTS
VINDHYACHAL IV U-2
SIPAT I
SATPURA EXT U-I
SASAN U-1
MAUDA TPP U-I
COMM 500
21.07.2007,
9.08.2007,
29.8.2007,
13.09.2007,
27.09.2007,
18.10.2007,
27.10.2007
04.11.2007
27.05.2007
13.08.2008
26.12.2010
COMM 1000.00
16.03.2008
31.07.2009
COMM 500.00
COMM 210.00
18.06.2007
15.06.2008
790
T C
500.00
T C
210.00
STATE - SECTOR TOTAL:-
500.00
210.00
500
210
710
400.00
400
400
(2011-12)
T
T
T
T
T
U
U
U
U
U
500.00
1980.00
250.00
660.00
500.00
128.20
283
250
250
78.21
989.41
2889.41
(2011-12)
(2010-12)
(2011-12)
(2011-12)
(2011-12)
400.00
500.00
1980.00
250.00
3960.00
1000.00
TOTAL:GRAND-TOTAL:-
58
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
33333333 41.44
41.30
40.07
39.24
35.64
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
5944
6650
6923
7206
7501
7809
8129
8462
Actual
Demand
5944
6558
8090
7200
7564
7490
59
Requirement
as Per 17th EPS
Actual
Requirement
34114
36920
38748
40666
42680
44793
47011
49338
34810
36846
38710
41560
42054
43179
60
MAHARASHTRA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Coal
6675.0
1650.0
1646.3
9971.3
2831.7
447.0
0.0
3278.7
Thermal
Gas
Diesel
912.0
0.0
180.0
0.0
1871.9
0.0
2963.9
0.0
(FIGURES IN MW)
Nuclear
Total
7587.0
1830.0
3518.2
12935.2
R.E.S.
(MNRE)
0.0
0.0
690.0
690.0
(FIGURES IN MW)
Nuclear
Total
Diesel
0.00
0.00
0.00
0.00
7967.00
2950.00
4761.98
15678.98
0.00
0.00
690.14
690.14
Total
19.9
1337.7
0.0
1357.6
R.E.S.
(MNRE)
10438.6
3614.7
4208.2
18261.5
Total
257.73
11109.57
5713.15
5452.12
22274.84
2316.15
0.00
2573.88
Peak
Demand
(MW)
12265
13697
14503
14986
16069
17455
18441
18049
19,388
19,766
18,861
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
10726
10984
11868
12464
12360
12679
13575
13766
14,664
15,402
15,125
Peak
Deficit/
Surplus
(% )
-1539
-2713
-2635
-2522
-3709
-4776
-4866
-4283
-4,724
-4,364
-3,736
-12.5
-19.8
-18.2
-16.8
-23.1
-27.4
-26.4
-23.7
-24.4
-22.1
-19.8
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
80489
87152
87933
92715
102765
110005
114885
121901
124,936
73438
75472
78966
81541
84117
89138
93846
95761
101,512
-7051
-11680
-8967
-11174
-18648
-20867
-21039
-26140
-23,424
-8.8
-13.4
-10.2
-12.1
-18.1
-19.0
-18.3
-21.4
-18.7
93,608
10,721
77,568
9,060
-16,040
-1,661
-17.1
-15.5
NOTE :- PEAK DEMAND - 20870 MW , ENERGY REQUIREMENT - 121604 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - MARCH & NOVEMBER.
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
21954
Peak
Met
(MW)
18322
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
-3632
-16.5
Energy
Requirment
(MU)
Energy
Availability
(MU)
125661
125486
th
Energy
Deficit/
Surplus
(%)
Energy
Deficit/
Surplus
(MU)
-175
-0.1
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
61
PROJECT
AGENCY
STATUS
TYPE
NTPC
Commissioned
Gas/LNG
NTPC
Under Construction
COAL
RATNAGIRI
(DHABOL)CCGT
MAUDA TPS
CAPACITY
(MW)
LIKELY YEAR /
DATE OF
COMMISSIONING
740
28.10.2007
500
2011-12
1240
MAHA GEN
Commissioned
COAL
250
13.05.2008
01.07.2008
10.02.2010
MAHA GEN
Commissioned
COAL
250
31.05.2007
MAHA GEN
Commissioned
COAL
250
27.03.2010
MAHA GEN
Under Construction
COAL
500
2010-11
BHUSAWAL TPP
MAHA GEN
Under Construction
COAL
1000
2010-12
GHATGHAR PSS
GOMID
Commissioned
HYDRO
250
2
3
4
TROMBAY EXTN.
2500
TATA
POWER
Commissioned
COAL
250
26.03.2009
JSW
Commissioned
COAL
300
24.08.2010
JSW
Commissioned
COAL
300
09.12..2010
Under Construction
COAL
600
2010-11
Under Construction
COAL
1320
2011-12
Under Construction
COAL
660
2011-12
JSW
ADANI
TIRODA TPP PH-I,U1,2
POWER
ADANI
TIRODA TPP PH-II ,U1,
POWER
SUB TOTAL private sector
3430
TOTAL (MAHARASHTRA)
7170
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - MAHARASTRA
Project Name
Installed
Capacity
Benefits
Commissioned/
Unit wise
Shares of
state
(MW)
slipped during
2007-2012
(MW)
Status
Status
Addition
During XIth
Plan
(MW)
Type
Capacity
(MW)
1000.00
1000.00
258
COMM 1000.00
DABHOL RATNAGIRI
*KORBA ST.-III U-7
KAHALGAON U-6,7
G
T
T
C
U
C
740.00
500.00
1000.00
740.00
500.00
1000.00
740
135
99
COMM 500
CENTRAL-SECTOR TOTAL:-
COMM 740.00
13.08.2008
27.05.2008
28.10.2007
26.12.2010
COMM 1000.00
16.03.2008
31.7.2009
13.05.2008
01.07.2008
(2010-11)
(2010-12)
10.02.2010
31.05.2007
27.03.2010
1232
STATE-SECTOR
GHATGHAR PSS U-1,2
250.00
250.00
250
COMM 250.00
KHAPERKHEDA EXT
BHUSAWAL
NEW PARLI EXT U-2
PARAS EXT U-1& 2
T
T
T
T
U
U
C
C
500.00
1000.00
250.00
500.00
500.00
1000.00
250.00
500.00
500
1000
250
500
COMM 250.00
COMM 500.00
Commissioning Date/
(Likely Date of
Commissioning)
2500.00
PRIVATE-SECTOR
TROMBAY EXTN.
JSW ENERGY
RATNAGIRI
T
T
C
U
250.00
1200.00
250.00
1200.00
250
1200
660.00
660.00
660
62
COMM 250.00
COMM 600.00
26.03.2009
24.08.2010
,09.12.2010
(2011-12)
Installed
Capacity
(MW)
Type
Capacity
Addition
During XIth
Plan
(MW)
Status
Status
Project Name
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
2110.00
*UMPP-MUNDRA U-2
MAUDA TPP U-I
4000.00
800.00
UMPP TOTAL
160
160.00
(2011-12)
T
T
T
T
T
T
U
U
U
U
U
U
1000.00
500.00
1980.00
1980.00
660.00
660.00
660.00
660.00
4000.00
800.00
1000.00
500.00
TOTAL:GRAND-TOTAL:-
135.24
510
660
660
160
185.24
2310.48
8312.48
(2011-12)
(2010-12)
(2011-12)
(2011-12)
(2011-12)
(2011-12)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Last Unit
Commissioning Date/
(Likely Date of
Commissioning)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
135.00
135.00
135
COMM 135.00
05.06.2010
135.00
135.00
TOTAL
135
135.OO
COMM 135.00
10.10.2010
PRIVATE SECTOR
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
33333333 34.12
32.40
31.60
31.64
29.79
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
14986
16200
17042
17927
18859
19839
20870
21954
Actual
Demand
14986
16069
17455
18441
18049
19388
63
Requirement
as Per 17th EPS
93217
103200
106643
110201
113878
117678
121604
125661
Actual
Requirement
92715
102765
110005
114885
121901
124936
64
GOA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
367.0
367.0
Thermal
Gas
Diesel
0.0
0.0
48.0
0.0
34.6
0.0
82.6
0.0
Nuclear
Hydro
0.0
48.0
401.6
449.6
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
283.03
283.03
0.0
0.0
26.0
26.0
Total
0.1
0.0
0.0
0.1
0.1
48.0
427.6
475.7
(FIGURES IN MW)
Thermal
Gas
Coal
R.E.S.
(MNRE)
Total
(FIGURES IN MW)
Nuclear
0.00
48.00
0.00
48.00
Diesel
Total
0.00
0.00
0.00
0.00
0.00
48.00
283.03
331.03
R.E.S.
(MNRE)
0.00
0.00
25.80
25.80
Total
0.05
78.00
308.83
386.88
0.05
30.00
0.00
30.05
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
316
296
337
356
368
459
457
466
485
316
296
337
356
368
419
408
413
453
0
0
0
0
0
-40
-49
-53
-32
0.0
0.0
0.0
0.0
0.0
-8.7
-10.7
-11.4
-6.6
1767
1845
1979
2146
2338
2624
2740
2801
3,092
1767
1845
1979
2146
2338
2606
2707
2754
3,026
0
0
0
0
0
-18
-33
-47
-66
0.0
0.0
0.0
0.0
0.0
-0.7
-1.2
-1.7
-2.1
544
481
453
445
-91
-36
-16.7
-7.5
2,352
254
2,306
251
-46
-3
-2.0
-1.2
NOTE :- PEAK DEMAND - 660 MW , ENERGY REQUIREMENT - 4159 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH .
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
Peak
Met
(MW)
721
Peak
eficit/
Surplus
(MW)
405
Peak
Deficit/
Surplus
(%)
-316
-43.8
Energy
Requirment
(MU)
Energy
Availability
(MU)
4583
3127
th
Energy
Deficit/
Surplus
(MU)
-1457
Energy
Deficit/
Surplus
(%)
-31.8
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
65
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
1000.00
1000.00
10
COMM 1000.00
500.00
500.00
6
16
COMM 500
1980.00
1000.00
1000.00
1980.00
500.00
500.00
20
5.60
5.60
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
CENTRAL-SECTOR TOTAL:-
27.05.2007
13.08.2008
26.12.2010
SIPAT I
MAUDA TPP U-1
T
T
U
U
VINDHYACHAL IV U- 2
TOTAL:-
(2011-12)
(2011-12)
(2011-12)
31.20
47.00
GRAND-TOTAL:-
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
44444444
T&D LOSSES %
45.05
35.97
19.68
20.90
21.18
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Actual
Demand
385
422
461
504
551
603
660
721
356
368
459
457
466
485
66
Requirement t
as Per 17th EPS
Actual
Requirement
2323
2560
2821
3108
3425
3774
4159
4583
2146
2338
2624
2740
2801
3092
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
13.7
13.7
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
4.2
0.0
4.2
0.0
Nuclear
Hydro
0.0
0.0
17.9
17.9
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
21.04
21.04
Total
0.0
0.0
7.0
7.0
0.0
0.0
0.0
0.0
0.0
0.0
24.9
24.9
(FIGURES IN MW)
Thermal
Gas
Coal
R.E.S.
(MNRE)
Total
(FIGURES IN MW)
Nuclear
0.00
0.00
4.20
4.20
Diesel
Total
0.00
0.00
0.00
0.00
0.00
0.00
25.24
25.24
R.E.S.
(MNRE)
Total
0.00
0.00
7.38
7.38
0.00
0.00
0.00
0.00
0.00
0.00
32.62
32.62
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
Peak
Demand
(MW)
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
APR-DEC ,2010
DEC ,2010
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
190
200
223
210
240
240
280
190
200
223
189
215
215
255
0
0
0
-21
-25
-25
-25
0.0
0.0
0.0
-10.0
-10.4
-10.4
-8.9
633
1119
1346
1602
1774
1797
1,934
633
1119
1323
1408
1580
1576
1,802
0
0
-23
-194
-194
-221
-132
0.0
0.0
-1.7
-12.1
-10.9
-12.3
-6.8
353
274
328
249
-25
-25
-7.1
-9.1
1,616
182
1,488
164
-128
-18
-7.9
-9.9
NOTE :- PEAK DEMAND - 485 MW , ENERGY REQUIREMENT - 2640 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) OCTOBER , MARCH & APRIL.
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
Peak
Met
(MW)
552
Peak
eficit/
Surplus
(MW)
116
Peak
Deficit/
Surplus
(%)
-436
-79.0
Energy
Requirment
(MU)
Energy
Availability
(MU)
3005
Energy
Deficit/
Surplus
(MU)
933
th
-2072
Energy
Deficit/
Surplus
(%)
-69.0
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
67
NIL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - DAMAN & DIU
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
1000.00
1000.00
COMM 1000.00
*BHILAI JV U-1& 2
500.00
500.00
100
COMM 500.00
T
T
U
C
500.00
1000.00
500.00
1000.00
2
1
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
CENTRAL-SECTOR TOTAL:-
27.05.2007
13.08.2008
20.04.2008
12.07.2009
COMM 500
26.12.2010
COMM 1000.00
16.03.2008
31.07.2009
107
SIPAT I
1980.00
1980.00
(2011-12)
VINDHYACHAL IV U-2
MAUDA TPP U-I
T
T
U
U
1000.00
1000.00
500.00
500.00
1.94
1.94
( 2011-12 )
( 2011-12)
11.88
119.88
(2011-12)
TOTAL :
GRAND TOTAL:-
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
16.88111
T&D LOSSES %
16.88
15.56
21.58
22.09
23.29
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
223
254
289
329
374
426
485
552
Actual
Demand
200
223
210
240
240
280
68
Requirement
as Per 17th EPS
1186
1382
1573
1790
2038
2319
2640
3005
Actual
Requirement
1119
1346
1602
1774
1797
1934
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
16.0
16.0
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
4.5
0.0
4.5
0.0
Nuclear
Hydro
0.0
0.0
20.5
20.5
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
25.04
25.04
0.0
0.0
9.0
9.0
Total
0.0
0.0
0.0
0.0
0.0
0.0
29.5
29.5
(FIGURES IN MW)
Thermal
Gas
Coal
R.E.S.
(MNRE)
Total
(FIGURES IN MW)
Nuclear
0.00
0.00
27.10
27.10
Diesel
Total
0.00
0.00
0.00
0.00
0.00
0.00
52.14
52.14
R.E.S.
(MNRE)
Total
0.00
0.00
8.46
8.46
0.00
0.00
0.00
0.00
0.00
0.00
60.60
60.60
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(% )
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
APR-DEC ,2010
DEC ,2010
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
315
391
387
415
460
504
529
315
391
387
388
424
443
494
0
0
0
-27
-36
-61
-35
0.0
0.0
0.0
-6.5
-7.8
-12.1
-6.6
1073
1830
2539
2923
3388
3574
4,007
1073
1830
2531
2879
3372
3457
3,853
0
0
-8
-44
-16
-117
-154
0.0
0.0
-0.3
-1.5
-0.5
-3.3
-3.8
594
515
594
515
0
0
0.0
0.0
3,294
361
3,291
361
-3
0
-0.1
0.0
NOTE :- PEAK DEMAND - 705 MW , ENERGY REQUIREMENT - 4498 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) SEPTEMBER , MARCH & FEBRUARY.
NIL
PRIVATE SECTOR:
NIL
TH
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
778
Peak
eficit/
Surplus
(MW)
98
Peak
Deficit/
Surplus
(%)
-681
-87.5
69
Energy
Requirment
(MU)
5042
Energy
Availability
(MU)
EPS)
Energy
Deficit/
Surplus
(MU)
783
-4259
Energy
Deficit/
Surplus
(%)
-84.5
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
6. PROJECTS PLANNED FOR XITH PLAN (STATE SECTOR/PRIVATE SECTOR/CENTRAL SECTOR)
INCLUDING BEST EFFORT PROJECTS
NIL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - DADRA & NAGAR HAVELI
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
1000.00
1000.00
COMM 1000.00
*BHILAI JV
500.00
500.00
70
COMM 500.00
KAHALGAON U-6,7
1000.00
1000.00
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
CENTRAL-SECTOR TOTAL:-
27.05.2007
13.08.2008
20.04.2008
12.7.2009
16.03.2008
31.07.2009
COMM 1000.00
76
SIPAT I
VINDHYACHAL IV U-2
MAUDA TPP U-1
T
T
U
U
1980.00
1000.00
1000.00
1980.00
500.00
500.00
9
2.77
2.77
14.54
90.54
TOTAL :
GRAND-TOTAL:-
(2011-12)
(2011-12)
(2011-12)
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
11111111
T&D LOSSES %
15.10
16.00
19.94
11.22
18.10
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Actual
Demand
Requirement as Per
17th EPS
391
431
476
525
579
639
705
778
391
387
415
460
504
529
70
2105
2542
2849
3194
3580
4013
4498
5042
Actual
Requiremen
1830
2539
2923
3388
3574
4007
71
SOUTHERN REGION
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
735.8
2500.5
350.0
3586.3
Coal
7572.5
510.0
7890.0
15972.5
11011.8
0.0
0.0
11011.8
Nuclear
Diesel
362.5
576.8
0.0
939.3
Total
8670.8
3587.3
8240.0
20498.1
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
11299.03
0.00
0.00
11299.03
9782.50
1710.00
7890.00
19382.50
R.E.S.
(MNRE)
557.5
4414.0
0.0
4971.5
0.0
0.0
880.0
880.0
Total
20240.1
8001.3
9120.0
37361.4
(FIGURES IN MW)
Thermal
Gas
Coal
(FIGURES IN MW)
Nuclear
555.70
3775.50
359.58
4690.78
Diesel
Total
362.52
576.80
0.00
939.32
10700.72
6062.30
8249.58
25012.60
0.00
0.00
1100.00
1100.00
Energy
Requirment
(MU)
Energy
Availability
(MU)
R.E.S.
(MNRE)
Total
1013.76
7503.79
0.00
8517.55
23013.51
13566.09
9349.58
45929.18
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
Peak
Demand
(MW)
Peak
Met
(MW)
22757
22419
23183
23075
24889
26176
26777
28958
32,178
Peak
eficit/
Surplus
(MW)
19201
20428
21928
22364
23372
24350
24368
26245
29,049
Peak
Deficit/
urplus
(% )
-3556
-1991
-1255
-711
-1517
-1826
-2409
-2713
-3,129
-15.6
-8.9
-5.4
-3.1
-6.1
-7.0
-9.0
-9.4
-9.7
140516
140625
144372
147672
157179
180091
187743
204012
220,576
128095
130530
136844
145395
155790
175197
181820
188794
206,544
-12421
-10095
-7528
-2277
-1389
-4894
-5923
-15218
-14,032
-8.8
-7.2
-5.2
-1.5
-0.9
-2.7
-3.2
-7.5
-6.4
32,214
29,054
-3,160
167,097
157,921
-9,176
-9.8
-5.5
17,831
17,394
-437
29,022
28,057
-965
-3.3
-2.5
NOTE :- PEAK DEMAND - 37434 MW , ENERGY REQUIREMENT - 235582 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH .
4. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
1094.0
0.0
0.0
1094.0
Coal
4770.0
1615.0
3500.0
9885.0
Thermal
Gas
Diesel
92.2
0.0
909.0
0.0
0.0
0.0
1001.2
0.0
Nuclear
Total
4862.2
2524.0
3500.0
10886.2
Wind
0.0
0.0
2940.0
2940.0
Total
0.0
0.0
0.0
0.0
5956.2
2524.0
6440.0
14920.2
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
40367
Peak
Met
(MW)
34033
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-6334
-15.7
Energy
Requirment
(MU)
Energy
Availability
(MU)
253443
222558
th
Energy
Deficit/
Surplus
(MU)
-30885
Energy
Deficit/
Surplus
(%)
-12.2
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
72
73
ANDHRA PRADESH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
3582.6
3.8
0.0
3586.3
Thermal
Gas
Diesel
272.3
0.0
1603.4
36.8
0.0
0.0
1875.7
36.8
Coal
3132.5
0.0
2378.0
5510.5
Nuclear
Total
3404.8
1640.2
2378.0
7423.0
Hydro
Thermal
Gas
0.00
2878.40
0.00
2878.40
Coal
4592.50
0.00
2377.38
6969.88
3695.53
0.00
0.00
3695.53
(FIGURES IN MW)
0.0
0.0
152.5
152.5
R.E.S.
(MNRE)
103.0
283.4
0.0
386.4
Total
7090.3
1927.4
2530.5
11548.2
(FIGURES IN MW)
Nuclear
Diesel
0.00
36.80
0.00
36.80
Total
4592.50
2915.20
2377.38
9885.08
0.00
0.00
214.28
214.28
R.E.S.
(MNRE)
190.83
530.76
0.00
721.59
Total
8478.86
3445.96
2591.66
14516.48
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
8585
8491
8679
8093
8999
10208
10048
11083
12,168
6873
6858
7769
7903
8542
8641
9162
9997
10,880
-1712
-1633
-910
-190
-457
-1567
-886
-1086
-1,288
-19.9
-19.2
-10.5
-2.3
-5.1
-15.4
-8.8
-9.8
-10.6
48394
47258
48080
50416
53030
60964
64139
71511
78,996
44302
44049
46680
50061
52332
58280
61511
66673
73,765
-4092
-3209
-1400
-355
-698
-2684
-2628
-4838
-5,231
-8.5
-6.8
-2.9
-0.7
-1.3
-4.4
-4.1
-6.8
-6.6
12,018
10,428
-1,590
-13.2
57,375
55,212
-2,163
-3.8
9,943
9,683
-260
-2.6
5,949
5,922
-27
-0.5
NOTE :- PEAK DEMAND - 13514 MW , ENERGY REQUIREMENT - 82085 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH .
2011-12
Peak
Demand
(MW)
14721
Peak
Met
(MW)
12357
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-2364
-16.1
Energy
Requirment
(MU)
89032
Energy
Availability
(MU)
80338
EPS)
Energy
Deficit/
Surplus
(MU)
-8694
Energy
Deficit/
Surplus
(%)
-9.8
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
74
Status
Status
Installed
Capacity
(MW)
Type
Project Name
CENTRAL-SECTOR
*SIMHADRI EXT U-3,4
*VALLUR (ENNORE) JV
KAIGA U-3 & 4
*KALPAKKAM (PFBR)
T
T
N
N
U
U
U
U
STATE-SECTOR
NAGARJUNA SAGAR TR
VIJAYWADA ST IV U-1
KOTHAGUDEM ST-VI
JURALA PRIYA U-1 TO 6
H
T
T
H
U
C
U
U
T
T
C
C
PRIVATE-SECTOR
KONASEEMA CCGT
GAUTAMI CCGT
KONDAPALLI ST. II
KONDAPALLI ST. II
G
G
T
C
U
U
BEST EFFORTS
PULICHINTALA U-4,5
LOWER JURALA
H
H
U
U
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
1000.00
1000.00
1000.00
1000.00
440.00
440.00
500.00
500.00
CENTRAL-SECTOR TOTAL:50.00
500.00
500.00
234.00
384.40
129
123
142
778.40
Commissioned/
slipped during
2007-2012
(MW)
COMM 220.00
50.00
500.00
500.00
234.00
50.00
500.00
500.00
234.00
210.00
210.00
500.00
500.00
STATE - SECTOR TOTAL:-
210
500
1994
COMM 210.00
COMM 500.00
445.00
445
COMM 445.00
464.00
464.00
233.00
233..00
133.00
133.00
PRIVATE-SECTOR TOTAL:-
464
233
133
1275
COMM 464.00
COMM 233.00
COMM 133.00
445.00
120.00
240.00
TOTAL
GRAND TOTAL
120
120
240
4287.40
75
COMM 500.00
COMM 195.00
Unit wise
Commissioning
Date/ (Likely Date of
Commissioning)
(2010-12)
(2011-12)
11.04.2007
(2011-12)
(2010-12)
8.10.2009
(2011-12)
28.03.2008,
31.08.2008,
27.06.2009
28.08.2010
09.11.2010
20.11.2007
27.05.2010
3.05.2009,
30 .06.2010
3.5.2009
5.12.2009)
19.07.2010
(2010-12)
(2011-12)
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
22222222
T&D LOSSES %
27.73
23.96
20.06
18.65
22.41
PEAK
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
8168
8810
9597
10454
11388
12406
13514
14721
ENERGY
Actual
Demand
8093
8999
10208
10048
11083
12168
Requirement
as Per 17th EPS
48928
54683
59311
64331
69775
75680
82085
89032
76
Actual
Requirement
50416
53030
60964
64139
71511
78996
77
KARNATAKA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
Diesel
0.0
127.9
220.0
106.5
0.0
0.0
220.0
234.4
Coal
1470.0
260.0
1073.4
2803.4
3376.3
51.7
0.0
3428.0
Nuclear
Total
1597.9
586.5
1073.4
3257.8
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
3599.80
0.00
0.00
3599.80
2220.00
1460.00
1072.67
4752.67
0.00
220.00
0.00
220.00
(FIGURES IN MW)
0.0
0.0
136.5
136.5
R.E.S.
(MNRE)
365.0
807.1
0.0
1172.0
Total
5339.2
1445.2
1209.9
7994.3
(FIGURES IN MW)
Nuclear
Diesel
Total
127.92
106.50
0.00
234.42
2347.92
1786.50
1072.67
5207.09
0.00
0.00
195.36
195.36
R.E.S.
(MNRE)
Total
594.55
1842.94
6542.27
3629.44
1268.03
11439.74
0.00
2437.49
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
5338
6198
6213
5927
5949
6253
6583
6892
7,942
4428
4805
5445
5612
5558
5811
5567
6548
6,897
-910
-1393
-768
-315
-391
-442
-1016
-344
-1,045
-17.0
-22.5
-12.4
-5.3
-6.6
-7.1
-15.4
-5.0
-13.2
19716
32249
36153
35156
34601
40797
40320
43168
45,550
16684
29084
31145
33687
34349
39948
39230
40578
42,041
-3032
-3165
-5008
-1469
-252
-849
-1090
-2590
-3,509
-15.4
-9.8
-13.9
-4.2
-0.7
-2.1
-2.7
-6.0
-7.7
7,798
7,798
7,634
7,634
-164
-164
-2.1
-2.1
35,370
4,307
32,336
4,245
-3,034
-62
-8.6
-1.4
NOTE :- PEAK DEMAND - 8338 MW, ENERGY REQUIREMENT - 50417 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH & APRIL
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
8826
8631
-195
-2.2
53540
57466
3926
7.3
th
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
78
STATUS
TYPE
NPC
Commissioned
NUCLEAR
220
LIKELY YEAR /
DATE OF
COMMISSIONING
11.04.2007
NPC
Under Construction
NUCLEAR
220
2010-11
KPCL
Commissioned
HYDRO
115
11.01.2009
KPCL
Commissioned
HYDRO
115
09.02.2009
BELLARY U-1
KPCL
Commissioned
COAL
500
03.12.2007
BELLARY U-2
KPCL
Under Construction
COAL
500
2011-12
RAICHUR U-8
KPCL
Commissioned
COAL
250
26.06.2010
TORANGALLU U-1
JINDAL
Commissioned
COAL
300
23.4.2009
JINDAL
NPCUDUPI TPP U-1
LANCO
NPC
UDUPI TPP
LANCO
SUB TOTAL -private sector
Commissioned
COAL
300
24.8.2009
Commissioned
COAL
600
23.07.2010
Under Construction
COAL
415
2010-11
S.NO.
PROJECT
AGENCY
KAIGA U-3
KAIGA U-4
CAPACITY
(MW)
440
2
3
1480
1615
TOTAL (KARNATAKA)
3535
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - KARNATAKA
Status
Status
Installed
Capacity
(MW)
Type
Project Name
T
T
U
U
T
N
N
N
U
U
U
U
STATE-SECTOR
BELLARY U-1 & 2
VARAHI EXT.
T
H
U
C
RAICHUR U-8
PRIVATE-SECTOR
UDUPI (LANCO) U-1,2
TORANGALLU U-1, 2
T
T
U
C
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
NEYVELI II LIG.
*SIMHADRI ST EXT.
U-3-4
*VALLUR(ENNORE) JV
KAIGA U-3 & 4
KUDANKULAM U- 1& 2
*KALPAKKAM PFBR
500.00
1000.00
500.00
1000.00
110
176.40
1000.00
1000.00
440.00
440.00
2000.00
2000.00
500.00
500.00
CENTRAL-SECTOR TOTAL:-
80
119
442
88
1015.40
1000.00
230.00
(2010-2012)
(2010-2012)
COMM 220.00
1000.00
230.00
1000
230
COMM 500.00
COMM 230.00
250.00
250.00
STATE - SECTOR TOTAL:-
250
1480
COMM 250.00
1200.00
600.00
1200
600
COMM 600.00
COMM 600.00
PRIVATE-SECTOR TOTAL:GRAND-TOTAL:-
1800
4295.40
1200.00
600.00
79
(2010-2012)
11.04.2007
(2010-2012)
(2011-2012)
03.12.2007
11.01.2009
09.02.2009
26.06.2010
23.07.2010
23.04.2009
24.08.2009
C - COMMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS
ARE YET TO BE ISSUED ARE TENTATIVE
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
9.
22222222
T&D LOSSES %
23.29
26.08
29.77
25.91
18.87
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Actual
Demand
5928
6275
6642
7031
7442
7877
8338
8826
Requirement as Per
17th EPS
5927
5949
6253
6583
6892
7942
80
35157
37334
39646
42101
44709
47477
50417
53540
Actual
Requirement
35156
34601
40797
40320
43168
45550
81
KERALA
Hydro
Thermal
Gas
Diesel
0.0
234.6
174.0
21.8
175.0
0.0
349.0
256.4
Coal
STATE
PRIVATE
CENTRAL
TOTAL
1821.6
0.0
0.0
1821.6
0.0
0.0
764.8
764.8
Nuclear
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
0.00
174.00
359.58
533.58
Coal
0.00
0.00
765.38
765.38
1881.50
0.00
0.00
1881.50
R.E.S.
(MNRE)
Total
234.6
195.8
939.8
1370.2
(FIGURES IN MW)
0.0
0.0
61.3
61.3
Total
61.6
0.0
0.0
61.6
2117.8
195.8
1001.1
3314.8
R.E.S.
(MNRE)
142.83
0.03
0.00
142.86
Total
(FIGURES IN MW)
Nuclear
Diesel
234.60
21.84
0.00
256.44
Total
234.60
195.84
1124.96
1555.40
0.00
0.00
78.10
78.10
2258.93
195.87
1203.06
3657.86
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2633
2803
2689
2451
2623
2787
2918
3188
3,109
2189
2347
2426
2420
2578
2728
2730
2751
2,982
-444
-456
-263
-31
-45
-59
-188
-437
-127
-16.9
-16.3
-9.8
-1.3
-1.7
-2.1
-6.4
-13.7
-4.1
13334
13628
12995
12691
13674
15023
15663
17645
17,619
12349
12693
12498
12540
13578
14716
15284
15562
17,196
-985
-935
-497
-151
-96
-307
-379
-2083
-423
-7.4
-6.9
-3.8
-1.2
-0.7
-2.0
-2.4
-11.8
-2.4
3,052
3,042
2,916
2,914
-136
-128
-4.5
-4.2
13,237
1,493
13,067
1,483
-170
-10
-1.3
-0.7
NOTE :- PEAK DEMAND - 3364 MW , ENERGY REQUIREMENT - 18186 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - MARCH & DECEMBER
2011-12
Peak
Demand
(MW)
3528
Peak
Met
(MW)
3199
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-329
Energy
Requirment
(MU)
-9.3
19230
Energy
Availability
(MU)
17845
Energy
Deficit/
Surplus
(MU)
-1385
Energy
Deficit/
Surplus
(%)
-7.2
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
82
PROJECT
AGENCY
KUTIYADI EXT.U-1
KUTIYADI EXT.U-2
KSEB
KSEB
STATUS
TYPE
Commissioned HYDRO
Commissioned HYDRO
SUB TOTAL -state sector
TOTAL (KERALA)
CAPACITY
(MW)
50
50
100
100
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - KERALA
Status
Status
Installed
Capacity
(MW)
Type
Project Name
NEYVELI II LIG.
*SIMHADRI EXT U-3,4
*VALLUR(ENNORE) JV
KAIGA, U-3 & 4
KUDANKULAM U- 1&2
*KALPAKKAM PFBR
T
T
T
N
N
N
U
U
U
U
U
U
STATE-SECTOR
KUTIYADI ADDITIONAL
EXTN.H.E.-U-1 & 2
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
500.00
500.00
1000.00
1000.00
1000.00
1000.00
440.00
440.00
2000.00
2000.00
500.00
500.00
CENTRAL-SECTOR TOTAL:-
70
80
37
35
266
40
528.90
COMM 220.00
100.00
100
COMM 100.00
100
628.90
100.00
(2010-2012)
(2010-2012)
(2011-2012)
11.04.2007
(2010-2012)
(2011-2012)
25.05.2010
23.09.2010
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
22222222 21.63
22.48
23.50
19.11
17.81
ENERGY
PEAK
Actual
Demand
Requirment
as
per
17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2452
2650
2779
2915
3058
3207
3364
3528
2451
2623
2787
2918
3188
3109
83
Requirement
as Per 17th EPS
Actua
Requirement
12698
13760
14549
15384
16266
17200
18186
19230
12691
13674
15023
15663
17645
17619
TAMIL NADU
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
Diesel
431.0
0.0
503.1
411.7
175.0
0.0
1109.1
411.7
Coal
2970.0
250.0
2384.2
5604.2
2175.8
0.0
0.0
2175.8
(FIGURES IN MW)
Nuclear
Total
3401.0
1164.8
2559.2
7125.0
R.E.S.
(MNRE)
0.0
0.0
432.4
432.4
(FIGURES IN MW)
Nuclear
Total
3493.20
0.00
1164.76
0.00
2299.81
478.50
6957.77
478.50
Diesel
0.00
411.66
0.00
411.66
Total
27.9
3323.5
0.0
3351.4
R.E.S.
(MNRE)
85.55
5130.04
0.00
5215.59
5604.8
4488.3
2991.6
13084.6
Total
5700.95
6294.80
2778.31
14774.06
Peak
Demand
(MW)
7158
7364
7455
7647
9375
8860
10334
9799
11,125
Peak
Met
(MW)
6218
7123
7228
7555
8297
8624
8690
9211
9,813
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
-940
-241
-227
-92
-1078
-236
-1644
-588
-1,312
-13.1
-3.3
-3.0
-1.2
-11.5
-2.7
-15.9
-6.0
-11.8
Energy
Requirment
(MU)
46232
46262
45665
47872
54194
61499
65780
69668
76,293
Energy
Availability
(MU)
42951
43476
45042
47570
53853
60445
63954
64208
71,568
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
-3281
-2786
-623
-302
-341
-1054
-1826
-5460
-4,725
-7.1
-6.0
-1.4
-0.6
-0.6
-1.7
-2.8
-7.8
-6.2
11,728
10,048
-1,680
59,508
55,778
-3,730
-14.3
-6.3
10,301
9,640
-661
5,919
5,582
-337
-6.4
-5.7
NOTE :- PEAK DEMAND - 13280 MW , ENERGY REQUIREMENT - 80886 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
14224
Peak
Met
(MW)
9575
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-4649
-32.7
84
Energy
Requirment
(MU)
87222
Energy
Availability
(MU)
64748
Energy
Deficit/
Surplus
(MU)
-22474
Energy
Deficit/
Surplus
(%)
-25.8
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
6. PROJECTS PLANNED FOR XITH PLAN (STATE SECTOR/PRIVATE SECTOR/CENTRAL SECTOR)
INCLUDING BEST EFFORT PROJECTS
S.NO.
PROJECT
AGENCY
1
2
3
4
VALLUR (ENNORE)-JV
NTPC
NEYVELI - II LIG
NLC
KUDANKULAM U 1,2
NPC
PFBR (Kalapakkam)
NPC
SUB TOTAL Central sector
2
3
4
TNEB
STATUS
TYPE
Under Construction
Under Construction
Under Construction
Under Construction
COAL
LIGNITE
NUCLEAR
NUCLEAR
Commissioned
GAS/LNG
Under Construction
Under Construction
Under Construction
HYDRO
COAL
COAL
CAPACITY
(MW)
1000
500
2000
500
4000
92.2
60
1200
600
1952.2
5952.2
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
T
T
T
N
N
N
U
U
U
U
U
U
60.00
60.00
60
T
T
U
C
600.00
92.20
600.00
92.20
600
92.20
1200.00
1200.00
1200
1952.20
4294.9
Unit wise
Commissioning
Date/ (Likely Date
of Commissioning)
CENTRAL-SECTOR
NEYVELI II LIG
*SIMHADRI EXT U-3,4
*VALLUR (ENNORE) JV
KAIGA U-3 & 4
KUDANKULAM U-1& 2
*KALPAKKAM (PFBR)
STATE-SECTOR
BHAWANI BARRAGE
II & III
METTUR EXT. U-1
VALUTHUR PH-II GT,ST
NORTH CHENNAI EXT
U-1,2
500.00
500.00
1000.00
1000.00
1000.00
1000.00
440.00
440.00
2000.00
2000.00
500.00
500.00
CENTRAL-SECTOR TOTAL:-
230
197.70
750
91
925
149
2342.70
COMM 220.00
(2011-2011)
COMM 59.8
COMM 32.4
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
11111111
T&D LOSSES %
17.16
19.28
18.66
19.54
18.71
85
(2010-2012)
(2010-2012)
(2011-2012)
11.04.2007
(2010-2012)
(2011-2012)
(2011-2012)
6.02.2009
17.02.2009
(2011-2012)
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
8215
9420
10090
10807
11575
12398
13280
14224
Actual
Demand
7647
9375
8860
10334
9799
11125
86
Requirement
as Per 17th EPS
51449
55479
59824
64510
69563
75011
80886
87222
Actual
Requirement
47872
54194
61499
65780
69668
76293
87
PUDUCHERRY
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
206.6
206.6
Thermal
Gas
Diesel
32.5
0.0
0.0
0.0
0.0
0.0
32.5
0.0
Nuclear
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
0.00
0.00
0.00
0.00
Coal
0.00
0.00
207.01
207.01
R.E.S.
(MNRE)
Total
32.5
0.0
206.6
239.1
(FIGURES IN MW)
0.0
0.0
13.2
13.2
Total
0.0
0.0
0.0
0.0
32.5
0.0
219.8
252.3
R.E.S.
(MNRE)
0.00
0.03
0.00
0.03
Total
(FIGURES IN MW)
Thermal
Gas
32.50
0.00
0.00
32.50
Nuclear
Diesel
0.00
0.00
0.00
0.00
Total
32.50
0.00
207.01
239.51
0.00
0.00
16.28
16.28
32.50
0.03
223.29
255.82
Peak
Demand
(MW)
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
APR-DEC ,2010
DEC ,2010
Peak
Met
(MW)
187
235
240
251
265
276
304
327
Peak
eficit/
Surplus
(MW)
187
235
240
251
265
276
275
294
Peak
Deficit/
Surplus
(% )
0
0
0
0
0
0
-29
-33
0.0
0.0
0.0
0.0
0.0
0.0
-9.5
-10.1
Energy
Requirment
(MU)
1228
1479
1537
1678
1808
1841
2020
2,119
Energy
Availability
(MU)
1228
1479
1537
1678
1808
1841
1773
1,975
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
0
0
0
0
0
0
-247
-144
0.0
0.0
0.0
0.0
0.0
0.0
-12.2
-6.8
319
300
-19
1,607
1,528
-79
-6.0
-4.9
284
277
-7
163
162
-1
-2.5
-0.6
NOTE :- PEAK DEMAND - 620 MW , ENERGY REQUIREMENT - 4007 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH & SEPTEMBER
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
683
Peak
eficit/
Surplus
(MW)
271
Peak
Deficit/
Surplus
(% )
-412
-60.3
Energy
Requirment
(MU)
4419
Energy
Availability
(MU)
2160
Energy
Deficit/
Surplus
(MU)
-2259
Energy
Deficit/
Surplus
(%)
-51.1
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
88
Status
Status
Installed
Capacity
(MW)
Type
Project Name
T
T
T
N
N
N
U
U
U
U
U
U
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
NEYVELI II LIG
*SIMHADRI EXT U-3,4
*VALLUR(ENNORE) JV
KAIGA U-3 & 4
KUDANKULAM U- 1,2
*KALPAKKAM PFBR
500.00
500.00
1000.00
1000.00
1000.00
1000.00
440.00
440.00
2000.00
2000.00
500.00
500.00
CENTRAL-SECTOR TOTAL:GRAND-TOTAL:-
15
10.60
5
6
67
5
108.60
108.60
(2010-2012)
(2010-2012)
(2011-2012)
11.04.2007
(2010-2012)
(2011-2012)
COMM 220.00
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
1111111 11.60
18.15
18.48
18.76
5.89
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
347
383
421
464
511
563
620
683
Actual
Demand
Requirement as
Per 17th EPS
240
251
265
276
304
327
89
2225
2454
2707
2986
3293
3633
4007
4419
Actual
Requiremen
1537
1678
1808
1841
2020
2119
EASTERN REGION
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
Diesel
100.0
17.1
0.0
0.1
90.0
0.0
190.0
17.2
Coal
8090.1
1441.4
4464.6
13996.2
2436.5
0.0
60.0
2496.5
(FIGURES IN MW)
Nuclear
Total
8297.2
1441.5
4464.4
14203.4
R.E.S.
(MNRE)
0.0
0.0
0.0
0.0
Diesel
(FIGURES IN MW)
Nuclear
Total
17.06
0.14
0.00
17.20
7037.06
2901.52
8504.00
18442.58
Total
46.7
0.1
0.0
46.8
10780.4
1441.6
4524.6
16746.6
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
Total
313.46
30.95
0.00
344.41
10519.44
2932.47
9217.20
22669.11
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
7940
8076
8594
8816
10161
10491
12031
12901
13,220
7648
7676
7710
8533
9677
10058
10699
11789
12,384
-292
-400
-884
-283
-484
-433
-1332
-1112
-836
-3.7
-5.0
-10.3
-3.2
-4.8
-4.1
-11.1
-8.6
-6.3
50687
51653
54977
57036
62347
68198
75831
82041
87,927
50197
50260
52287
55678
60706
66183
72099
78444
84,017
-490
-1393
-2690
-1358
-1641
-2015
-3732
-3597
-3,910
-1.0
-2.7
-4.9
-2.4
-2.6
-3.0
-4.9
-4.4
-4.4
13,767
12,520
13,085
11,882
-682
-638
-5.0
-5.1
71,770
7,433
68,574
7,091
-3,196
-342
-4.5
-4.6
NOTE :- PEAK DEMAND - 17230 MW , ENERGY REQUIREMENT - 101805 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH
4. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Sector
Hydro
Thermal
Nuclear
Wind
Total
Coal
Gas
Diesel
Total
STATE
1050.0
1820.0
0.0
0.0
1820.0
0.0
0.0
2870.0
PRIVATE
CENTRAL
TOTAL
1299.0
802.0
3151.0
850.0
11390.0
14060.0
0.0
0.0
0.0
0.0
0.0
0.0
850.0
11390.0
14060.0
0.0
0.0
0.0
0.0
0.0
0.0
2149.0
12192.0
17211.0
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
19088
Peak
Met
(MW)
19015
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-73
Energy
Requirment
(MU)
-0.4
111802
Energy
Availability
(MU)
126510
Energy
Deficit/
Surplus
(MU)
14708
Energy
Deficit/
Surplus
(%)
13.2
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
90
91
BIHAR
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Coal
STATE
PRIVATE
CENTRAL
TOTAL
44.9
0.0
8.0
52.9
553.5
0.0
1126.0
1679.5
Nuclear
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
129.43
129.43
530.00
0.00
1131.70
1661.70
R.E.S.
(MNRE)
Total
553.5
0.0
1126.0
1679.5
(FIGURES IN MW)
0.0
0.0
0.0
0.0
5.5
0.0
0.0
5.5
603.9
0.0
1134.0
1737.9
(FIGURES IN MW)
Nuclear
0.00
0.00
0.00
0.00
Total
Diesel
Total
0.00
0.00
0.00
0.00
530.00
0.00
1131.70
1661.70
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
Total
54.60
9.50
0.00
64.10
584.60
9.50
1261.13
1855.23
Peak
Demand
(MW)
Peak
Met
(MW)
1409
1389
973
980
1314
1399
1882
1842
2,249
Peak
eficit/
Surplus
(MW)
1288
1325
788
980
1116
1162
1243
1333
1,509
Peak
Deficit/
Surplus
(%)
-121
-64
-185
0
-198
-237
-639
-509
-740
-8.6
-4.6
-19.0
0.0
-15.1
-16.9
-34.0
-27.6
-32.9
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
9370
8096
7588
7201
7955
8425
9155
10527
11,587
8992
7422
5878
6476
7218
7741
7933
8801
9,914
-378
-674
-1710
-725
-737
-684
-1222
-1726
-1,673
Energy
Deficit/
Surplus
(%)
-4.0
-8.3
-22.5
-10.1
-9.3
-8.1
-13.3
-16.4
-14.4
2,073
1,659
-414
-20.0
9,792
8,422
-1,370
-14.0
2,023
1,373
-650
-32.1
1,232
947
-285
-23.1
NOTE :- PEAK DEMAND - 3046 MW , ENERGY REQUIREMENT - 17213 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MAR. , SEPTEMBER & MAY.
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
3607
Peak
Met
(MW)
1225
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-2382
-66.0
Energy
Requirment
(MU)
Energy
Availability
(MU)
19905
9927
th
Energy
Deficit/
Surplus
(MU)
-9978
Energy
Deficit/
Surplus
(%)
-50.1
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
92
S.NO.
1
PROJECT
AGENCY
KAHALGAON II U-6
NTPC
KAHALGAON II U-7
NTPC
SUB TOTAL -Central sector
SUB TOTAL (BIHAR)
STATUS
TYPE
COMMISSIONED
COMMISSIONED
COAL
COAL
CAPACITY
(MW)
500
500
1000
1000
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - BIHAR
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
510.00
510.00
55
COMM 510.00
KAHALGAON U-6,7
1000.00
1000.00
126
COMM 1000.00
500.00
500.00
CENTRAL-SECTOR TOTAL:-
63
244
GRAND-TOTAL:-
244
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
STATE-SECTOR
NOTE :- U - UNDER CONSTRUCTION PROJECTS
C COMMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS
ARE YET TO BE ISSUED ARE TENTATIVE
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
33333333 36.66
38.88
43.96
50.67
48.79
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
Actual
per 17th EPS
Demand
1154
980
1339
1314
1570
1399
1842
1882
2177
1842
2575
2249
3046
3607
93
ENERGY
Requirement
Actual
as Per 17th EPS Requirement
7201
7201
8327
7955
9629
8425
11134
9155
12874
10527
14886
11587
17213
19905
28.03.2008,
06.02.2008,
20.03.2008
16.03.2008
31.07.2009
(2010-2011)
D.V.C.
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Thermal
Coal
Gas
Diesel
STATE
144.0
2641.5
90.0
0.0
PRIVATE
0.0
0.0
0.0
0.0
CENTRAL
6.0
572.0
0.0
0.0
TOTAL
150.0
3213.5
90.0
0.0
2. INSTALLED CAPACITY AS ON 31.12.2010
Sector
Hydro
Thermal
Gas
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Diesel
Total
0.00
0.00
0.00
0.00
0.00
0.00
3793.10
3793.10
Peak
Deficit/
Surplus
(%)
Nuclear
R.E.S.
(MNRE)
Total
2731.5
0.0
0.0
0.0
572.0
0.0
3303.5
0.0
(FIGURES IN MW)
Nuclear
Coal
STATE
0.00
0.00
0.00
PRIVATE
0.00
0.00
0.00
CENTRAL
193.26
3703.10
90.00
TOTAL
193.26
3703.10
90.00
3. ACTUAL POWER SUPPLY POSITION
Period
(FIGURES IN MW)
Energy
Requirment
(MU)
Total
0.0
0.0
0.0
0.0
2875.5
0.0
578.0
3453.5
R.E.S.
(MNRE)
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3986.36
3986.36
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
-6.7
-4.9
-11.1
0.0
0.0
-2.9
-2.6
-1.8
-1.4
8319
8284
8390
9070
10003
11542
13387
14002
15,199
8312
8184
8265
8988
9891
11308
13039
13699
14,577
-7
-100
-125
-82
-112
-234
-348
-303
-622
-0.1
-1.2
-1.5
-0.9
-1.1
-2.0
-2.6
-2.2
-4.1
-0.6
-0.3
12,326
1,261
11,288
1,258
-1,038
-3
-8.4
-0.2
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
2011-12
2900
Peak
Met
(MW)
4545
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
1646
56.8
Energy
Requirment
(MU)
Energy
Availability
(MU)
16510
Energy
Deficit/
Surplus
(MU)
32120
Energy
Deficit/
Surplus
(%)
15610
th
94.5
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
6. PROJECTS PLANNED FOR XITH PLAN (CENTRAL SECTOR) INCLUDING BEST EFFORT
PROJECTS
Sl.No.
PLANT NAME
MEJIA U-6
CHANDRAPURA U-7,8
Commissioned
FUEL
TYPE
Coal
CAPACITY
(MW)
250
Commissioned
Coal
500
STATE
CATEGORY
West Bengal
Jharkhand
94
LIKELY YEAR
OF BENEFIT
01.10.2007
4.11.2009,
31.03.2010
Commissioned
Under Construction
Under Construction
Under Construction
Under Construction
Under Construction
FUEL
TYPE
Coal
Coal
Coal
Coal
Coal
Coal
CAPACITY
(MW)
500
500
1000
1000
1200
500
Sikkim
Commissioned
Hydro
510
Jharkhand
Under Construction
Coal
1050
7010
Sl.No.
PLANT NAME
STATE
CATEGORY
3
4
5
6
7
MEJIA PH II U-1
MEJIA PH II U-2
KODERMA U-1&2
DURGAPUR STEEL
RAGHUNATHPUR PH -I
FARAKKA ST II
West Bengal
West Bengal
Jharkhand
West Bengal
West Bengal
West Bengal
TEESTA ST. V
PRIVATE SECTOR
1
MAITHAN RBC JV
TOTAL (DVC)
LIKELY YEAR
OF BENEFIT
30.09.2010
2010-11
2010-12
2010-11
2011-12
2010-11
28.03.2008,
6.02.2008,
20.03.2008
2010-12
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - D.V.C.
Project Name
Installed
Capacity
Benefits
Commissioned/
Unit wise
Shares of
state
(MW)
Status
Status
Addition
During XIth
Plan
(MW)
Type
Capacity
(MW)
MEJIA U-6
CHANDRAPURA U-7,8
T
T
C
C
250.00
500.00
250.00
500.00
250
500
DURGAPUR STEEL
TEESTA ST.V U-1 TO 3
T
H
U
C
500.00
510.00
500.00
510.00
500
44
T
T
T
U
U
U
500.00
1200.00
1000.00
500.00
1200.00
1000.00
40
1200
25
1050.00
1050.00
CENTRAL-SECTOR TOTAL:GRAND-TOTAL:-
1050
3609
3609
slipped during
2007-2012
(MW)
Commissioning Date/
(Likely Date of
Commissioning)
COMM 250.00
COMM 500.00
01.10.2007
4.11.2009
31.03.2010
(2010-2011)
28.03.2008,
06.02.2008
20.03.2008
(2010-2011)
(2011-2012)
30.09.2010
CENTRAL-SECTOR
COMM 510.00
COMM 500.00
(2010-12)
th
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2259
2420
2581
2744
2900
ENERGY
Actual
Demand
Requirement as
Per 17th EPS
1400
1531
1650
1852
2217
1938
95
12865
13779
14695
15622
16510
Actual
Requirement
9070
10003
11542
13387
14002
15199
JHARKHAND
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
0.0
0.0
0.0
0.0
Coal
1260.0
360.0
239.3
1859.3
130.0
0.0
5.0
135.0
Nuclear
Diesel
0.0
0.0
0.0
0.0
Total
1260.0
360.0
239.3
1859.3
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
130.00
0.00
70.93
200.93
1190.00
360.00
187.88
1737.88
(FIGURES IN MW)
0.00
0.00
0.00
0.00
R.E.S.
(MNRE)
0.0
0.0
0.0
0.0
Total
4.0
0.0
0.0
4.0
1394.0
360.0
244.3
1998.4
(FIGURES IN MW)
Diesel
Total
0.00
0.00
0.00
0.00
1190.00
360.00
187.88
1737.88
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Nuclear
R.E.S.
(MNRE)
Total
0.00
0.00
0.00
0.00
4.05
0.00
0.00
4.05
1324.05
360.00
258.81
1942.86
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-2010
APR-DEC ,2010
DEC ,2010
Peak
Demand
(MW)
Peak
Met
(MW)
488
544
600
669
687
865
889
1,088
Peak
eficit/
Surplus
(MW)
474
475
590
623
671
787
887
947
-14
-69
-10
-46
-16
-78
-2
-141
-2.9
-12.7
-1.7
-6.9
-2.3
-9.0
-0.2
-13.0
1329
3298
3630
4033
4369
5139
5361
5,867
1318
3161
3550
3868
4154
4458
5110
5,407
-11
-137
-80
-165
-215
-681
-251
-460
-0.8
-4.2
-2.2
-4.1
-4.9
-13.3
-4.7
-7.8
1,012
1,012
0
4,602
4,469
-133
0.0
-2.9
860
860
0
552
526
-26
0.0
-4.7
NOTE :- PEAK DEMAND - 1993 MW , ENERGY REQUIREMENT - 10471 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) JANUARY & APRIL.
2011-12
Peak
Demand
(MW)
2332
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
987
Peak
Deficit/
Surplus
(% )
-1345
-57.7
Energy
Requirment
(MU)
Energy
Availability
(MU)
12224
6997
th
Energy
Deficit/
Surplus
(MU)
-5227
Energy
Deficit/
Surplus
(%)
-42.8
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
96
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
510.00
510.00
40
COMM 510.00
KAHALGAON U-6,7
1000.00
1000.00
19
COMM 1000.00
500.00
500.00
TOTAL
GRAND-TOTAL:-
41
100
100
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
22222222
T&D LOSSES %
25.35
19.62
26.82
26.21
23.16
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
1240
1453
1704
1993
2332
Actual
Achieved
600
669
687
865
889
1088
97
Requirement
as Per 17th EPS
6546
7660
8963
10471
12224
Actual
Achieved
3630
4033
4369
5139
5361
5867
28.03.2008,
06.02.2008,
20.03.2008
16.03.2008
31.7.2009
(2010-2011)
ORISSA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Thermal
Gas
Diesel
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Coal
Nuclear
Hydro
2061.92
0.00
105.01
2166.93
420.00
1200.00
1408.10
3028.10
420.0
0.0
888.7
1308.7
0.0
0.0
0.0
0.0
Total
1.3
0.0
0.0
1.3
2345.2
0.0
898.7
3243.9
(FIGURES IN MW)
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
R.E.S.
(MNRE)
Total
STATE
1923.9
420.0
PRIVATE
0.0
0.0
CENTRAL
10.0
888.7
TOTAL
1933.9
1308.7
2. INSTALLED CAPACITY AS ON 31.12.2010
Sector
(FIGURES IN MW)
0.00
0.00
0.00
0.00
Diesel
Total
0.00
0.00
0.00
0.00
420.00
1200.00
1408.10
3028.10
Nuclear
R.E.S.
(MNRE)
Total
0.00
0.00
0.00
0.00
64.30
4.30
0.00
68.60
2546.22
1204.30
1513.11
5263.63
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2132
2125
2125
2220
2437
2695
3142
3062
3,188
1977
1988
1987
2220
2396
2608
2905
2987
3,120
-155
-137
-138
0
-41
-87
-237
-75
-68
-7.3
-6.4
-6.5
0.0
-1.7
-3.2
-7.5
-2.4
-2.1
12328
13393
13610
13980
15208
17101
18846
20519
21,136
12318
13087
13375
13875
15010
16796
18500
20214
20,955
-10
-306
-235
-105
-198
-305
-346
-305
-181
-0.1
-2.3
-1.7
-0.8
-1.3
-1.8
-1.8
-1.5
-0.9
3,505
3,157
3,468
3,157
-37
0
-1.1
0.0
16,747
1,742
16,690
1,738
-57
-4
-0.3
-0.2
NOTE :- PEAK DEMAND - 4051 MW , ENERGY REQUIREMENT - 24699 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH & JULY.
2011-12
Peak
Demand
(MW)
4459
Peak
Met
(MW)
4380
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-79
Energy
Requirment
(MU)
-1.8
Energy
Availability
(MU)
27149
26928
th
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
-221
-0.8
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
98
S.NO.
1
1
PROJECT
BALIMELA ST-II U-7,8
AGENCY
STATUS
TYPE
OHPC
Commissioned
HYDRO
Commissioned
Commissioned
Under Construction
COAL
COAL
COAL
CAPACITY
(MW)
150
150
600
600
1200
2400
2550
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN IN-CLUDING BEST EFFORT PROJECTS
FOR THE STATE : - ORISSA
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
510.00
510.00
105
COMM 510.00
KAHALGAON U-6,7
1000.00
1000.00
49
COMM 1000.00
500.00
500.00
CENTRAL-SECTOR TOTAL:-
104
258
STATE-SECTOR
BALIMELA ST-2 U-7,8
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
PRIVATE-SECTOR
STERLITE ENERGY
U-1,2
150.00
150.00
150
150
2400.00
1200.00
1200
PRIVATE-SECTOR TOTAL:-
1200
1200.00
1200.00
1200
TOTAL:GRAND-TOTAL:-
1200
2808
COMM 150.00
05.01.2008
27.03.2008
COMM 1200
29.12.2010,
14.10.2010
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
55555555
T&D LOSSES %
57.09
44.02
45.56
40.86
39.44
99
06.02.2008
20.03.2008
28.03.2008
16.03.2008
31.7.2009
(2010-2011)
(2010-2011)
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
Actual
Demand
per 17th EPS
2237
2220
2454
2437
2717
2695
3009
3142
3327
3062
3674
3188
4051
4459
100
ENERGY
Requirement
Actual
as Per 17th EPS Requirement
13980
13980
15371
15208
16900
17101
18582
18846
20431
20519
22464
21136
24699
27149
101
SIKKIM
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Thermal
Gas
Diesel
0.00
5.00
0.00
0.00
0.00
0.00
0.00
5.00
Coal
STATE
PRIVATE
CENTRAL
TOTAL
32.00
0.00
8.00
40.00
0.00
0.00
64.70
64.70
Nuclear
Hydro
5.0
0.0
64.7
69.7
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
75.27
75.27
0.00
0.00
68.10
68.10
Total
0.0
0.0
0.0
0.0
7.1
0.0
0.0
7.1
44.1
0.0
72.7
116.8
(FIGURES IN MW)
Thermal
Gas
Coal
R.E.S.
(MNRE)
Total
(FIGURES IN MW)
Nuclear
0.00
0.00
0.00
0.00
Diesel
Total
5.00
0.00
0.00
5.00
5.00
0.00
68.10
73.10
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
Total
47.11
0.00
0.00
47.11
52.11
0.00
143.37
195.48
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
3614
3752
3836
4117
3414
3418
3652
3965
-200
-334
-184
-152
-5.5
-8.9
-4.8
-3.7
20670
20551
22091
23155
20575
20249
21608
22789
-95
-302
-483
-366
-0.5
-1.5
-2.2
-1.6
47
45
69
97
96
45
45
66
95
94
-2
0
-3
-2
-2
-4.3
0.0
-4.3
-2.1
-2.1
212
223
284
343
388
210
218
267
330
345
-2.0
-5.0
-17.0
-13.0
-43
-0.9
-2.2
-6.0
-3.8
-11.1
91
91
90
90
-1
-1
-1.1
-1.1
259
34
259
34
0
0
0.0
0.0
NOTE :- PEAK DEMAND - 80 MW , ENERGY REQUIREMENT - 305 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) JANUARY & FEBRUARY.
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
83
1297
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
1214
1462.3
Energy
Requirment
(MU)
Energy
Availability
(MU)
320
3457
Energy
Deficit/
Surplus
(MU)
3137
Energy
Deficit/
Surplus
(%)
980.4
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
102
S.NO.
1
1
2
PROJECT
TEESTA V U-1,2,3
CAPACITY
(MW)
AGENCY
STATUS
TYPE
NHPC
commissioned
HYDRO
Under Construction
Under Construction
HYDRO
HYDRO
510
510
99
1200
1299
1809
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - SIKKIM
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
510.00
510.00
67
COMM 510.00
KAHALGAON U-6,7
1000.00
1000.00
COMM 1000.00
500.00
6
76
99.00
600.00
99
600
699
(2010-2011)
(2011-2012)
600.00
600
600
1375
(2011-2012)
CENTRAL-SECTOR
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
55555555
T&D LOSSES %
54.99
50.49
10.73
23.10
36.80
103
06.02.2008
20.03.2008
28.03.2008
16.03.2008
31.7.2009
(2010-2011)
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
Actual
per 17th EPS
Demand
58
61
64
67
71
76
80
83
47
45
69
97
96
104
ENERGY
Requirement
Actual
as Per 17th EPS Requirement
204
218
234
247
264
285
305
320
212
223
284
343
388
105
WEST BENGAL
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
161.7
0.0
14.0
175.7
Thermal
Gas
Diesel
100.0
12.1
0.0
0.1
0.0
0.0
100.0
12.2
Coal
3215.1
1081.4
924.7
5221.1
Nuclear
Total
3327.1
1081.5
924.7
5333.3
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
977.00
0.00
139.30
1116.30
4780.00
1341.38
634.96
6756.34
R.E.S.
(MNRE)
Total
0.0
0.0
0.0
0.0
28.8
0.1
0.0
28.8
3517.6
1081.6
938.7
5537.8
(FIGURES IN MW)
Thermal
Gas
Coal
(FIGURES IN MW)
Nuclear
100.00
0.00
0.00
100.00
Diesel
Total
12.06
0.14
0.00
12.20
4892.06
1341.52
634.96
6868.54
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
Total
143.40
17.15
0.00
160.55
6012.46
1358.67
774.26
8145.39
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
3614
3752
3836
4117
4743
4784
5283
5387
6,094
3414
3418
3652
3965
4599
4669
4987
5379
5,963
-200
-334
-184
-152
-144
-115
-296
-8
-131
-5.5
-8.9
-4.8
-3.7
-3.0
-2.4
-5.6
-0.1
-2.1
20670
20551
22091
23155
24936
26538
29020
31289
33,750
20575
20249
21608
22789
24509
25966
27902
30290
32,819
-95
-302
-483
-366
-427
-572
-1118
-999
-931
-0.5
-1.5
-2.2
-1.6
-1.7
-2.2
-3.9
-3.2
-2.8
6,162
4,832
6,112
4,832
-50
0
-0.8
0.0
28,044
2,612
27,446
2,588
-598
-24
-2.1
-0.9
NOTE :- PEAK DEMAND - 6042 MW , ENERGY REQUIREMENT - 33496 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
MARCH.
2011-12
Peak
Demand
(MW)
6472
Peak
Met
(MW)
6581
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
109
Energy
Requirment
(MU)
1.7
Energy
Availability
(MU)
35694
47080
th
Energy
Deficit/
Surplus
(MU)
11387
Energy
Deficit/
Surplus
(%)
31.9
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
106
S.NO.
1
2
3
PROJECT
AGENCY
2
3
4
5
6
1
WBSEB
STATUS
TYPE
Under Construction
Under Construction
Under Construction
HYDRO
HYDRO
COAL
CAPACITY
(MW)
132
160
500
792
Commissioned
HYDRO
900
Commissioned
Commissioned
Commissioned
Commissioned
Commissioned
Commissioned
Under Construction
COAL
COAL
COAL
COAL
COAL
COAL
COAL
Commissioned
COAL
300
300
300
250
210
210
250
2720
250
250
3762
4. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - WEST BENGAL
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
Status
Status
Installed
Capacity
(MW)
Type
Project Name
510.00
510.00
122
COMM 510.00
H
T
T
U
U
C
132.00
160.00
1000.00
132.00
160.00
1000.00
132
160
55
COMM 1000.00
500.00
500.0 0
171
640
210.00
210.00
900.00
210.00
210.00
900.00
210
210
900
COMM 210.00
COMM 210.00
COMM 900.00
600.00
600.00
600
COMM 600.00
500.00
300.00
500.00
300.00
500
300
2720
COMM 250.00
COMM 300.00
24.12.2007
07.06.2009
18.07.2007
27.08.2007
23.11.2007
20.01.2008
21.12.2007
20.07.2008
07.11.2007
24.11.2007
250.00
250.00
250.00
250.00
3610.00
COMM 250.00
29.09.2009
CENTRAL-SECTOR
107
06.02.2008
20.03.2008
28.03.2008
(2010-2011)
(2011-2012)
16.03.2008
31.7.2009
(2010-2011)
C COMMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS
ARE YET TO BE ISSUED ARE TENTATIVE
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
33333333
T&D LOSSES %
31.01
28.54
24.84
23.64
21.29
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
4990
5315
5665
6042
6472
Actual
Demand
Requirement
as Per 17th EPS
4117
4743
4784
5283
5387
6094
108
27847
29593
31474
33496
35694
Actual
Requirement
23155
24936
26538
29020
31289
33750
109
NORTH-EASTERN REGION
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Thermal
Gas
Diesel
402.0
142.7
24.5
0.0
375.0
0.0
801.5
142.7
Coal
STATE
PRIVATE
CENTRAL
TOTAL
361.0
0.0
860.0
1221.0
300.0
0.0
55.0
355.0
Nuclear
Hydro
Thermal
Gas
Coal
STATE
PRIVATE
CENTRAL
TOTAL
256.00
0.00
860.00
1116.00
60.00
0.00
0.00
60.00
R.E.S.
(MNRE)
Total
844.7
24.5
430.0
1299.2
(FIGURES IN MW)
0.0
0.0
0.0
0.0
48.9
0.0
0.0
48.9
1254.6
24.5
1290.0
2569.1
(FIGURES IN MW)
Nuclear
387.50
24.50
375.00
787.00
Total
Diesel
Total
142.74
0.00
0.00
142.74
590.24
24.50
375.00
989.74
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
Total
223.29
0.03
0.00
223.32
1069.53
24.53
1235.00
2329.06
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
1148
1209
1259
1272
1385
1477
1742
1820
1,760
1043
1135
1071
1128
1192
1166
1347
1358
1,445
-105
-74
-188
-144
-193
-311
-395
-462
-315
-9.1
-6.1
-14.9
-11.3
-13.9
-21.1
-22.7
-25.4
-17.9
5935
6350
6640
7119
7534
7782
8799
9407
9,332
5855
6195
6288
6674
6888
7012
7713
8134
8,296
-80
-155
-352
-445
-646
-770
-1086
-1273
-1,036
-1.3
-2.4
-5.3
-6.3
-8.6
-9.9
-12.3
-13.5
-11.1
1,913
1,676
1,560
1,529
-353
-147
-18.5
-8.8
7,514
814
6,786
768
-728
-46
-9.7
-5.7
NOTE :- PEAK DEMAND - 2299 MW , ENERGY REQUIREMENT - 12184 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S)
MARCH, AUGUST & OCTOBER.
4. CAPACITY ADDITION DURING 11TH PLAN (AS PER PLANNING COMMISSION TARGET)
Sector
Hydro
Thermal
Gas
Diesel
37.2
0.0
0.0
0.0
750.0
0.0
787.2
0.0
Coal
STATE
PRIVATE
CENTRAL
TOTAL
124.0
0.0
2600.0
2724.0
0.0
0.0
750.0
750.0
Nuclear
R.E.S.
(MNRE)
Total
37.2
0.0
1500.0
1537.2
0.0
0.0
0.0
0.0
Total
0.0
0.0
0.0
0.0
161.2
0.0
4100.0
4261.2
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
2537
Peak
Met
(MW)
2395
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
-142
Energy
Requirment
(MU)
-5.6
13329
Energy
Availability
(MU)
11598
Energy
Deficit/
Surplus
(MU)
-1731
Energy
Deficit/
Surplus
(%)
-13.0
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
110
111
ARUNACHAL PRADESH
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
26.5
0.0
97.5
124.0
0.0
0.0
0.0
0.0
Thermal
Gas
Diesel
0.0
15.9
0.0
0.0
21.0
0.0
21.0
15.9
(FIGURES IN MW)
Nuclear
R.E.S.
(MNRE)
Total
15.9
0.0
21.0
36.9
0.0
0.0
0.0
0.0
26.7
0.0
0.0
26.7
(FIGURES IN MW)
Nuclear
Total
Diesel
15.88
0.00
0.00
15.88
15.88
0.00
21.05
36.93
Total
69.1
0.0
118.5
187.6
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
Total
78.55
0.03
0.00
78.58
94.43
0.03
118.62
213.08
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
50
45
50
63
75
87
101
130
95
50
45
50
62
73
76
75
79
78
0
0
0
-1
-2
-11
-26
-51
-17
0.0
0.0
0.0
-1.6
-2.7
-12.6
-25.7
-39.2
-17.9
136
162
177
158
208
286
391
426
399
135
161
175
158
206
259
302
271
325
-2
-1
-2
0
-2
-27
-89
-155
-74
-1.2
-0.6
-1.1
0.0
-1.0
-9.4
-22.8
-36.4
-18.5
101
100
85
85
-16
-15
-15.8
-15.0
380
46
318
39
-62
-7
-16.3
-15.2
NOTE :- PEAK DEMAND - 109 MW , ENERGY REQUIREMENT - 348 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - MARCH & SEPTEMBER.
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
116
Peak
eficit/
Surplus
(MW)
161
Peak
Deficit/
Surplus
(% )
45
38.7
Energy
Requirment
(MU)
Energy
Availability
(MU)
386
Energy
Deficit/
Surplus
(MU)
925
Energy
Deficit/
Surplus
(%)
539
139.6
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
112
NILL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - ARUNACHAL PRADESH
Status
Status
Installed
Capacity
(MW)
Type
Project Name
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
BONGAIGAON U-1,2
500.00
500.00
CENTRAL-SECTOR
TOTAL:-
25
25
(2011-2012)
12
12
37
(2011-2012)
BONGAIGAON U-3
250.00
250.00
TOTAL
GRAND-TOTAL:-
$-The entitled home state share would be allowed as soon as the state Regulatory Commission is set up
in the state.
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
44444444
T&D LOSSES %
47.54
42.96
49.72
57.79
67.20
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
Actual
per 17th EPS
Demand
63
63
75
75
81
87
87
101
94
130
101
95
109
116
113
ENERGY
Requirement
Actual
as Per 17th EPS Requirement
158
210
232
257
284
314
348
386
158
208
286
391
426
399
ASSAM
Hydro
Thermal
Gas
Diesel
274.5
20.7
24.5
0.0
178.0
0.0
477.0
20.7
Coal
STATE
PRIVATE
CENTRAL
TOTAL
102.0
0.0
329.7
431.7
300.0
0.0
41.7
341.7
Nuclear
Hydro
595.2
24.5
219.7
839.4
STATE
PRIVATE
CENTRAL
TOTAL
100.00
0.00
329.72
429.72
60.00
0.00
0.00
60.00
0.0
0.0
0.0
0.0
Total
0.1
0.0
0.0
0.1
697.3
24.5
549.4
1271.2
(FIGURES IN MW)
Thermal
Gas
Coal
R.E.S.
(MNRE)
Total
(FIGURES IN MW)
Nuclear
239.00
24.50
177.82
441.32
Diesel
Total
20.69
0.00
0.00
20.69
319.69
24.50
177.82
522.01
R.E.S.
(MNRE)
0.00
0.00
0.00
0.00
27.11
0.00
0.00
27.11
Total
446.80
24.50
507.54
978.84
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
688
668
738
659
733
771
848
958
920
618
589
635
621
679
688
766
797
874
-70
-79
-103
-38
-54
-83
-82
-161
-46
-10.2
-11.8
-14.0
-5.8
-7.4
-10.8
-9.7
-16.8
-5.0
3450
3458
3527
3787
4051
4297
4816
5107
5,122
3425
3349
3321
3582
3778
3984
4412
4567
4,688
-25
-109
-206
-205
-273
-313
-404
-540
-434
-0.7
-3.2
-5.8
-5.4
-6.7
-7.3
-8.4
-10.6
-8.5
971
848
937
829
-34
-19
-3.5
-2.2
4,172
418
3,881
404
-291
-14
-7.0
-3.3
NOTE :- PEAK DEMAND - 1291 MW , ENERGY REQUIREMENT - 6868 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - OCTOBER & JULY.
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(%)
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
1443
1142
-301
-20.9
7585
5931
-1654
-21.82
th
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
114
PROJECT
AGENCY
BONGAIGAON
NTPC
SUB TOTAL -Central sector
LAKWA WH
ASGENCO
NAMRUP CCGT
APGCL
SUB TOTAL -State sector
TOTAL (ASSAM)
STATUS
TYPE
Under Construction
COAL
Under Construction
Under Construction
GAS/LNG
GAS/LNG
CAPACITY
(MW)
750
750
37.2
100.0
137.2
887.2
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - ASSAM
Status
Status
Installed
Capacity
(MW)
Type
Project Name
STATE-SECTOR
LAKWA W.H.
KAHALGAON U 6,7
G
T
U
C
CENTRAL SECTOR
BONGAIGAON U-1,2
T
G
U
U
Capacity
Addition
During XIth
Plan
(MW)
37.20
1000.00
Benefits
Shares of
state
(MW)
37.20
1000
37.20
83
500.00
500.00
STATE - SECTOR TOTAL:-
121
254
254.00
250.00
100.00
250.00
100.00
127
100
227
GRAND-TOTAL:-
602
Commissioned/
slipped during
2007-2012
(MW)
COMM 1000
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
33333333
T&D LOSSES %
39.31
51.76
40.34
33.69
38.60
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
Actual
per 17th EPS
Demand
663
741
828
925
1034
1155
1291
1443
659
733
771
848
958
920
115
ENERGY
Requirement Actual
as Per 17th
Requirement
EPS
3810
3787
4182
4051
4618
4297
5100
4816
5632
5107
6219
5122
6868
7585
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
(2010-2011)
16.03.2008
31.7.2009
(2011-2012)
(2011-2012)
(2011-2012)
MANIPUR
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Coal
STATE
PRIVATE
CENTRAL
TOTAL
1.5
0.0
80.8
82.3
0.0
0.0
0.0
0.0
Thermal
Gas
Diesel
0.0
45.4
0.0
0.0
26.0
0.0
26.0
45.4
Nuclear
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Coal
0.00
0.00
0.00
0.00
0.00
0.00
80.98
80.98
R.E.S.
(MNRE)
Total
45.4
0.0
26.0
71.4
(FIGURES IN MW)
0.0
0.0
0.0
0.0
Total
4.0
0.0
0.0
4.0
50.9
0.0
106.8
157.7
R.E.S.
(MNRE)
5.45
0.00
0.00
5.45
Total
(FIGURES IN MW)
Thermal
Gas
0.00
0.00
25.96
25.96
Nuclear
Diesel
45.41
0.00
0.00
45.41
Total
45.41
0.00
25.96
71.37
0.00
0.00
0.00
0.00
50.86
0.00
106.94
157.80
Peak
Demand
(MW)
Peak
Met
(MW)
98
101
115
103
113
106
119
128
111
Peak
eficit/
Surplus
(MW)
94
101
111
103
109
101
97
95
99
Peak
Deficit/
Surplus
(% )
-4
0
-4
0
-4
-5
-22
-33
-12
Energy
Requirment
(MU)
-4.1
0.0
-3.5
0.0
-3.5
-4.7
-18.5
-25.8
-10.8
Energy
Availability
(MU)
456
487
480
537
510
451
530
556
524
Energy
Deficit/
Surplus
(MU)
441
483
469
523
489
429
501
477
430
-16
-4
-11
-14
-21
-22
-29
-79
-94
Energy
Deficit/
Surplus
(%)
-3.5
-0.8
-2.3
-2.6
-4.1
-4.9
-5.5
-14.2
-17.9
118
105
-13
425
378
-47
-11.0
-11.1
109
104
-5
49
45
-4
-4.6
-8.2
NOTE :- PEAK DEMAND - 189 MW , ENERGY REQUIREMENT - 862 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - &
OCTOBER & AUGUST.
NIL
18 MW (LIKAKHONG DG)
PRIVATE SECTOR:
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
203
170
-33
-16.3
932
952
20
2.2
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
116
NIL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - MANIPUR
Status
Status
Installed
Capacity
(MW)
Type
Project Name
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
BONGAIGAON U-1, 2
500.00
500.00
CENTRAL-SECTOR
TOTAL:-
31
31
(2011-2012)
16
16
47
(2011-2012)
BONGAIGAON U-3
250.00
250.00
TOTAL
GRAND-TOTAL:-
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
66666666
T&D LOSSES %
65.18
70.61
63.12
53.47
63.56
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
103
125
144
154
165
177
189
203
Actual
Demand
103
113
106
119
128
111
117
Requirement as
Per 17th EPS
537
581
629
681
737
797
862
932
Actual
Requirement
537
510
451
530
556
524
MEGHALAYA
Hydro
Thermal
Gas
0.0
0.0
26.0
26.0
Coal
0.0
0.0
13.3
13.3
185.5
0.0
74.8
260.3
Nuclear
Diesel
2.0
0.0
0.0
2.0
Total
2.0
0.0
39.3
41.4
Hydro
Coal
0.00
0.00
0.00
0.00
156.00
0.00
74.58
230.58
(FIGURES IN MW)
R.E.S.
(MNRE)
1.5
0.0
0.0
1.5
0.0
0.0
0.0
0.0
Total
189.1
0.0
114.1
303.2
(FIGURES IN MW)
Thermal
Gas
0.00
0.00
25.96
25.96
Nuclear
Diesel
2.05
0.00
0.00
2.05
Total
2.05
0.00
25.96
28.01
0.00
0.00
0.00
0.00
R.E.S.
(MNRE)
31.03
0.00
0.00
31.03
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Total
189.08
0.00
100.54
289.62
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Deficit/
Surplus
(%)
165
189
246
264
280
402
455
457
280
160
189
195
207
205
269
279
293
250
-5
0
-51
-57
-75
-133
-176
-164
-30
-3.0
0.0
-20.7
-21.6
-26.8
-33.1
-38.7
-35.9
-10.7
700
949
1151
1374
1382
1368
1620
1713
1,550
705
947
1076
1228
1144
1063
1232
1386
1,327
5
-2
-75
-146
-238
-305
-388
-327
-223
0.7
-0.2
-6.5
-10.6
-17.2
-22.3
-24.0
-19.1
-14.4
281
253
225
225
-56
-28
-19.9
-11.1
1,152
144
989
132
-163
-12
-14.1
-8.3
NOTE :- PEAK DEMAND - 400 MW , ENERGY REQUIREMENT - 1976 MU FOR THE YEAR 2010-2011(AS PER 17TH EPS
REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - JANUARY & JUNE.
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
428
Peak
eficit/
Surplus
(MW)
436
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
1.9
2101
Energy
Availability
(MU)
1418
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
-683
-32.5
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
118
S.NO.
1
2
3
PROJECT
AGENCY
MYNTDU St-I
MeSEB
MYNTDU ST-1 ADD MeSEB
NEW UMTRU
MeSEB
TOTAL (MEGHALYA)
STATUS
TYPE
Under Construction
Under Construction
Under Construction
HYDRO
HYDRO
HYDRO
CAPACITY
(MW)
84
42
40
166
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - MEGHALAYA
CENTRAL SECTOR
BONGAIGAON U-1,2
KAHALGAON U-6,7
Status
Status
Installed
Capacity
(MW)
Type
Project Name
T
T
U
C
STATE-SECTOR
MYNTDU ST-1
MYNTDU ST-1 add
H
H
U
U
H
T
U
U
Capacity
Addition
During XIth
Plan
(MW)
500.00
1000.00
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
500.00
1000
35
83
118
84.00
84.00
42.00
42.00
STATE - SECTOR TOTAL:-
84
42
126
(2010-2011)
(2011-2012)
40
18
58
302
(2011-2012)
(2011-2012)
40.00
250.00
40.00
250.00
TOTAL
GRAND-TOTAL:-
COMM 1000
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
11111111
T&D LOSSES %
16.73
28.35
40.15
35.34
37.62
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
PEAK
Requirment
Actual
Achieved
as
per
17th EPS
264
264
283
280
303
402
325
455
348
457
373
280
400
428
119
ENERGY
Requirement Actual
as Per 17th
Achieved
EPS
1374
1374
1460
1382
1551
1368
1648
1620
1751
1713
1860
1550
1976
2101
(2011-2012)
16.03.2008
31.7.2009
MIZORAM
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
0.0
0.0
16.0
16.0
Coal
0.0
0.0
0.0
0.0
4.0
0.0
34.2
38.2
(FIGURES IN MW)
Nuclear
0.0
0.0
0.0
0.0
R.E.S.
(MNRE)
13.4
0.0
0.0
13.4
(FIGURES IN MW)
Nuclear
Total
51.86
0.00
0.00
0.00
16.28
0.00
68.14
0.00
R.E.S.
(MNRE)
36.47
0.00
0.00
36.47
Diesel
51.9
0.0
0.0
51.9
Total
51.9
0.0
16.0
67.9
Diesel
51.86
0.00
0.00
51.86
Total
69.3
0.0
50.2
119.5
Total
88.33
0.00
50.59
138.92
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
75
74
71
69
76
83
97
100
70
73
74
71
67
72
80
58
64
64
-2
0
0
-2
-4
-3
-39
-36
-6
-2.7
0.0
0.0
-2.9
-5.3
-3.6
-40.2
-36.0
-8.6
284
295
283
236
230
235
288
330
352
278
293
276
222
216
221
246
269
288
-6
-2
-7
-14
-14
-14
-42
-61
-64
-2.1
-0.7
-2.5
-5.9
-6.1
-6.0
-14.6
-18.5
-18.2
76
76
70
70
-6
-6
-7.9
-7.9
264
34
222
30
-42
-4
-15.9
-11.8
NOTE :- PEAK DEMAND - 107 MW , ENERGY REQUIREMENT - 370 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) MARCH & JANUARY.
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
115
Peak
eficit/
Surplus
(MW)
121
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
5.2
Energy
Availability
(MU)
398
Energy
Deficit/
Surplus
(MU)
632
th
Energy
Deficit/
Surplus
(%)
234
58.7
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
120
NIL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - MIZORAM
Status
Status
Installed
Capacity
(MW)
Type
Project Name
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Last Unit
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
BONGAIGAON U-1,2
500.00
500.00
CENTRAL-SECTOR
TOTAL:-
21
21.00
(2011-2012)
10
10
31
(2011-2012)
BONGAIGAON U-3
250.00
250.00
TOTAL
GRAND-TOTAL:-
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
55555555
T&D LOSSES %
55.54
66.14
39.19
38.18
44.63
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
071
076
081
087
093
100
107
115
Actual
Achieved
Requirement
as Per 17th EPS
69
76
83
97
100
70
121
236
254
274
295
318
343
370
398
Actual Achieved
236
230
235
288
330
352
NAGALAND
Hydro
Thermal
Gas
0.0
0.0
19.19
19.19
Coal
0.0
0.0
0.0
0.0
0.0
0.0
53.32
53.32
Nuclear
Diesel
2.0
0.0
0.0
2.0
Total
2.0
0.0
19.19
21.19
Hydro
0.00
0.00
53.32
53.32
0.0
0.0
0.0
0.0
R.E.S.
(MNRE)
28.67
0.0
0.0
28.67
Total
30.67
0.0
72.51
103.18
(FIGURES IN MW)
Thermal
Gas
0.00
0.00
19.19
19.19
Coal
0.00
0.00
0.00
0.00
(FIGURES IN MW)
Nuclear
Diesel
2.00
0.00
0.00
2.00
Total
2.00
0.00
19.19
21.19
0.00
0.00
0.00
0.00
R.E.S.
(MNRE)
28.67
0.00
0.00
28.67
Total
30.67
0.00
72.51
103.18
Peak
Demand
(MW)
Peak
Met
(MW)
61
78
65
74
90
79
91
95
100
Peak
eficit/
Surplus
(MW)
58
78
65
71
87
79
88
86
96
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
-3
0
0
-3
-3
0
-3
-9
-4
-4.9
0.0
0.0
-4.1
-3.3
0.0
-3.3
-9.5
-4.0
-6.8
10.0
118
110
-8
100
110
10
Energy
Availability
(MU)
260
290
306
330
408
343
377
475
530
445
53
Energy
Deficit/
Surplus
(MU)
258
289
300
324
389
328
334
436
466
396
50
-2
-1
-6
-6
-19
-15
-43
-39
-64
-49
-3
Energy
Deficit/
Surplus
(%)
-0.7
-0.3
-2.0
-1.8
-4.7
-4.4
-11.4
-8.2
-12.1
-11.0
-5.7
NOTE :- PEAK DEMAND - 137 MW , ENERGY REQUIREMENT - 626 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT), OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) SEPTEMBER & DECEMBER
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
152
114
-38
-25.1
698
636
-62.0
-8.8
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
122
NIL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - NAGALAND
Status
Status
Installed
Capacity
(MW)
Type
Project Name
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
BONGAIGAON U-1,2
500.00
500.00
CENTRAL-SECTOR
TOTAL:-
21
21
(2011-2012)
11
11
32
(2011-2012)
BONGAIGAON U-3
250.00
250.00
TOTAL
GRAND-TOTAL:-
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
55555555 55.00
48.26
58.99
54.79
55.61
ENERGY
YEAR
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
Requirment
as
per
17th EPS
74
82
91
101
112
124
137
152
Actual
Demand
74
90
79
91
95
100
123
Requirement
as Per 17th
EPS
330
367
408
454
505
562
626
698
Actual
Requirement
330
408
343
377
475
530
TRIPURA
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
Thermal
Gas
Diesel
127.5
4.8
0.0
0.0
33.0
0.0
160.5
4.8
Coal
STATE
PRIVATE
CENTRAL
TOTAL
16.0
0.0
62.4
78.4
0.0
0.0
0.0
0.0
Nuclear
STATE
PRIVATE
CENTRAL
TOTAL
Hydro
Thermal
Gas
148.50
0.00
33.34
181.84
Coal
0.00
0.00
0.00
0.00
0.00
0.00
62.37
62.37
R.E.S.
(MNRE)
Total
(FIGURES IN MW)
132.3
0.0
33.0
165.3
0.0
0.0
0.0
0.0
Total
0.0
0.0
0.0
0.0
148.4
0.0
95.4
243.8
R.E.S.
(MNRE)
16.01
0.00
0.00
16.01
Total
(FIGURES IN MW)
Nuclear
Diesel
4.85
0.00
0.00
4.85
Total
153.35
0.00
33.34
186.69
0.00
0.00
0.00
0.00
169.36
0.00
95.71
265.07
Peak
Demand
Peak
Met
156
182
190
188
171
169
171
167
176
(MW)
140
156
165
159
155
142
141
156
173
Peak
Deficit/
Surplus
(MW)
-16
-26
-25
-29
-16
-27
-30
-11
-3
Peak
Deficit/
Surplus
(%)
-10.3
-14.3
-13.2
-15.4
-9.4
-16
-17.5
-6.6
-1.7
Energy
Requirment
(MU)
647
708
716
700
745
802
777
800
855
Energy
Availabili
(MU)
613
672
671
641
666
728
686
728
771
Energy
Deficit/
Surplus
(MU)
-34
-36
-45
-59
-79
-74
-91
-72
-84
Energy
Deficit/
Surplus
( %)
-5.3
-5.1
-6.3
-8.4
-10.6
-9.2
-11.7
-9.0
-9.8
(MW)
220
180
197
178
-23
-2
-10.5
-1.1
676
70
602
68
-74
-2
-10.9
-2.9
NOTE :- PEAK DEMAND - 271 MW , ENERGY REQUIREMENT - 1134 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) JUNE & SEPTEMBER
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
Energy
Deficit/
Surplus
(%)
2011-12
288
252
-37
-12.7
1229
1104
-125
-10.2
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
124
Capacity
Addition
During XIth
Plan
(MW)
Type
Status
Status
Project Name
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
CENTRAL-SECTOR
BONGAIGAON U-1,2
500.00
500.00
CENTRAL-SECTOR TOTAL:-
37
37
STATE SECTOR
BARAMURA GT EXTN
21.00
21..00
STATE SECTOR TOTAL
21
21
(2011-2012)
COMM 21.00
03.08.2010
BONGAIGAON U-3
250.00
250.00
TOTAL
GRAND-TOTAL:-
19
19
77
(2011-2012)
TRIPURA
Status
Status
Installed
Capacity
(MW)
Type
Project Name
Capacity
Addition
During XIth
Plan
(MW)
Benefits
Shares of
state
(MW)
Commissioned/
slipped during
2007-2012
(MW)
Unit wise
Commissioning Date/
(Likely Date of
Commissioning)
STATE- SECTOR
BARAMURA GT
21.00
21..00
TOTAL
21
21
COMM 21.00
(2010-2011)
9. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
44444444
T&D LOSSES %
46.44
59.54
41.11
34.75
42.81
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
PEAK
Requirment as
per 17th EPS
188
200
213
226
240
255
271
282
Actual
Demand
188
171
169
171
167
176
125
ENERGY
Requirement as Per
17th EPS
700
759
822
891
966
1046
1134
1229
Actual
700
745
802
777
800
855
A&N ISLANDS
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
Thermal
Gas
0.0
0.0
0.0
0.0
Coal
0.0
0.0
0.0
0.0
5.2
0.0
0.0
5.2
Nuclear
Diesel
40.0
20.0
0.0
60.0
Total
40.0
20.0
0.0
60.0
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
0.00
0.00
R.E.S.
(MNRE)
5.2
0.0
0.0
5.2
Total
Total
0.00
0.00
0.00
0.00
R.E.S.
(MNRE)
5.25
0.10
0.00
5.35
Energy
Availability
(MU)
Energy
Deficit/
Surplus
(MU)
0.0
0.0
0.0
0.0
50.5
20.0
0.0
70.5
(FIGURES IN MW)
Thermal
Gas
0.00
0.00
0.00
0.00
Coal
0.00
0.00
0.00
0.00
(FIGURES IN MW)
Nuclear
Diesel
40.05
20.00
0.00
60.05
Total
40.05
20.00
0.00
60.05
45.30
20.10
0.00
65.40
Peak
Demand
(MW)
Peak
Met
(MW)
Peak
eficit/
Surplus
(MW)
Peak
Deficit/
Surplus
(% )
Energy
Requirment
(MU)
Energy
Deficit/
Surplus
(%)
31
33
37
40
40
40
40
40
40
27
30
36
37
32
32
32
38
32
-4
-3
-1
-3
-8
-8
-8
-2
-8
-12.9
-9.1
-2.7
-7.5
-20.0
-20.0
-20.0
-5.0
-20.0
148
161
176
194
240
240
240
236
240
132
136
158
160
168
190
180
184
180
-16
-25
-18
-34
-72
-50
-60
-52
-60
-10.8
-15.5
-10.2
-17.5
-30.0
-20.8
-25.0
-22.0
-25.0
40
40
32
32
-8
-8
-20.0
-20.0
180
20
135
15
-45
-5
-25.0
-25.0
NOTE :- PEAK DEMAND - 71 MW , ENERGY REQUIREMENT - 316 MU FOR THE YEAR 2010-2011(AS PER
17TH EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) APRIL
6 MW (RANGAT BAY)
20 MW (BAMBOO FLAT DG)
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
77
Peak
eficit/
Surplus
(MW)
49
Peak
Deficit/
Surplus
(% )
-28
-36.1
Energy
Requirment
(MU)
Energy
Availability
(MU)
344
Energy
Deficit/
Surplus
(MU)
185
-158.9
Energy
Deficit/
Surplus
(%)
-46.2
* Peak and Energy availability from all IPPs to be commissioned during 11th Plan are taken in the respective
state.
126
NIL
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
T&D LOSSES %
22222222 25.95
12.63
24.32
23.10
26.86
ENERGY
YEAR
Requirment as
per 17th EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
28
33
43
49
56
63
71
77
Actual
Demand
Requirement
as Per 17th EPS
40
40
40
40
40
40
127
126
146
193
219
248
281
316
344
Actual
Requirement
194
240
240
240
236
240
LAKSHDWEEP
1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN)
Sector
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
Thermal
Gas
0.0
0.0
0.0
0.0
Coal
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Nuclear
Diesel
10.0
0.0
0.0
10.0
Total
10.0
0.0
0.0
10.0
Hydro
STATE
PRIVATE
CENTRAL
TOTAL
0.00
0.00
0.00
0.00
0.0
0.0
0.0
0.0
R.E.S.
(MNRE)
0.0
0.0
0.0
0.0
Total
R.E.S.
(MNRE)
0.00
0.75
0.00
0.75
Total
10.0
0.0
0.0
10.0
(FIGURES IN MW)
Thermal
Gas
0.00
0.00
0.00
0.00
Coal
0.00
0.00
0.00
0.00
(FIGURES IN MW)
Nuclear
Diesel
9.97
0.00
0.00
9.97
Total
9.97
0.00
0.00
9.97
0.00
0.00
0.00
0.00
9.97
0.75
0.00
10.72
Peak
Demand
Peak
Met
(MW)
(MW)
2005-06
2006-07
2007-08
2008-09
2009-2010
APR-DEC ,2010
DEC,2010
6
6
6
6
6
6
6
Peak
Deficit/
Surplus
(MW)
6
6
6
6
6
6
6
0
0
0
0
0
0
0
Peak
Deficit/
Surplus
(%)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Energy
Requirment
(MU)
Energy
Availability
(MU)
24
25
24
24
24
18
2
24
25
24
24
24
18
2
Energy
Deficit
Surplus
(MU)
0
0
0
0
0
0
0
Energy
/Deficit/
Surplus
(%)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
NOTE :- PEAK DEMAND - 11 MW , ENERGY REQUIREMENT - 37 MU FOR THE YEAR 2010-2011(AS PER 17TH
EPS REPORT),OCCURENCE OF PEAK AS PER ACTUAL POWER SUPPLY POSITION IN THE MONTH(S) - APRIL
STATE SECTOR:
PRIVATE SECTOR:
NIL
NIL
5. LIKELY POWER SUPPLY POSITION AT THE END OF 2011-12* (DEMAND AS PER 17TH EPS)
Period
2011-12
Peak
Demand
(MW)
Peak
Met
(MW)
11
Peak
eficit/
Surplus
(MW)
7.0
Peak
Deficit/
Surplus
(% )
-4.0
-32.7
Energy
Requirment
(MU)
Energy
Availability
(MU)
40
Energy
Deficit/
Surplus
(MU)
28
th
Energy
Deficit/
Surplus
(%)
-12
-29.3
* Peak and Energy availability from all IPPs to be commissioned during 11 Plan are taken in the respective
state.
128
NIL
7. LIKELY CAPACITY ADDITION DURING 11TH PLAN INCLUDING BEST EFFORT PROJECTS
FOR THE STATE : - LAKSHADWEEP
NIL
NOTE :- U - UNDER CONSTRUCTION PROJECTS
C COMMISSIONED
* SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS
ARE YET TO BE ISSUED ARE TENTATIVE
8. T&D LOSSES
YEAR
2003- 04
2004-05
2005-06
2006-07
2007-08
11111111
T&D LOSSES %
11.85
10.20
11.19
12.87
18.05
ENERGY
YEAR
Requirment
as per 17th
EPS
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
7
7
8
8
9
10
11
11
Actual
Demand
Requirement
as Per 17th EPS
6
6
6
6
6
129
22
24
26
28
31
34
37
40
Actual
Requirement
24
25
24
24
24