CWC Pre-Monsoon Check Up List 1) All the cable from Antenna,GPS, Solar Panel & lightning arrestor should

be tied with Cable tie and routed properly and sealed. 2) Earthing Cable should also rout under the ground from the earth pit to DCP Mount and then should be properly routed to the lightning arrestor. 3) TBRG Cable should also tied (conduit should be used) with GI pipe and then routed underground to the DCP mount. 4) Functional checking & Cleaning TBRG. 5) Functional checking of bubbler sensor and orifice path up to the bubbler chamber. 6) Functional checking of INSAT Transmitter with count parameters in the Data Logger in co-ordination with Delhi ERS. 7) CCR report should be signed stating , Testing of TBRG Rain Fall & Bubbler Sensor-Water level is done and found to be working O.K.