Professional Documents
Culture Documents
CVGBlore Schedule
CVGBlore Schedule
Sl.No A1
1 2 2A 2B 2C 2D 2E 3 3A 3B 3C 4 4A 4B 4C 5 6 6A 6B 6C 6D 6E 7 7A 7B 8 9 10 11
PHASE # 02
No Of Days Start Date Completion Date Sl.No A2
1
Description
L3-GENTS TOILET
Description
L3-LADIES TOILET
No Of Days
Start Date
Completion Date
Protection of Flooring using POP REMOVING False ceiling Mirror Sanitory fixture Cubicle doors. Wash basin counter DEMOLITION + CLERAING OF DEBRIS Inside cubicle Outside cubicle Masonary work for WC(Ledge wall) DADOING +FLOORING Inside Cubicle Outside Cubicle Flooring ACID WASH FIXING Wash Basin Counter & Urinal partion Water Closet Wash Basin with accessories DOOR for Cubicle(scraping+Painting) Toilet Fixture FALSE CEILING Grid Fixing Tile Fixing Mirror Fixing Water Test on fixed fixture Deep Cleaning Walk Through
3
1 1 3 2 1
Days 17-Mar-12
17-Mar-12 17-Mar-12 17-Mar-12 19-Mar-12
2 17-Mar-12 17-Mar-12 19-Mar-12 18-Mar-12 19-Mar-12 3 25-Mar-12 30-Mar-12 1-Apr-12 4 10-Apr-12 6-Apr-12 14-Apr-12 13-Apr-12 18-Apr-12 20-Apr-12 22-Apr-12 22-Apr-12 23-Apr-12 7 25-Apr-12 26-Apr-12 27-Apr-12 27-Apr-12 28-Apr-12 29-Apr-12 8 9 10 11 5 6 6A 6B 6C 6D 6E 7A 7B 4A 4B 4C 3A 3B 3C 2A 2B 2C 2D 2E
13
6 6 3
Days 20-Mar-12
25-Mar-12 30-Mar-12
9
5 4 4 2
Days
6-Apr-12 3-Apr-12 11-Apr-12 12-Apr-12
8
3 3 3 5 4 3 2 2 1 2 1
Days
16-Apr-12 18-Apr-12 20-Apr-12 18-Apr-12 20-Apr-12 23-Apr-12 25-Apr-12 26-Apr-12 27-Apr-12 27-Apr-12 29-Apr-12
Protection of Flooring using POP REMOVING False ceiling Mirror Sanitory fixture Cubicle doors. Wash basin counter DEMOLITION + CLERAING OF DEBRIS Inside cubicle Outside cubicle Masonary work for WC(Ledge wall) DADOING +FLOORING Inside Cubicle Outside Cubicle Flooring ACID WASH FIXING Wash Basin Counter Water Closet Wash Basin with accessories DOOR for Cubicle(scraping+Painting) Toilet Fixture FALSE CEILING Grid Fixing Tile Fixing Mirror Fixing Water Test on fixed fixture Deep Cleaning Walk Through
3
1 1 3 2 1
Days 17-Mar-12
17-Mar-12 17-Mar-12 17-Mar-12 19-Mar-12
17-Mar-12 17-Mar-12 19-Mar-12 18-Mar-12 19-Mar-12 28-Mar-12 2-Apr-12 4-Apr-12 11-Apr-12 7-Apr-12 15-Apr-12 14-Apr-12 19-Apr-12 21-Apr-12 23-Apr-12 23-Apr-12 24-Apr-12 26-Apr-12 27-Apr-12 28-Apr-12 28-Apr-12 29-Apr-12 30-Apr-12
13
6 6 3
Days 23-Mar-12
28-Mar-12 2-Apr-12
9
5 4 4 2
Days
7-Apr-12 4-Apr-12 12-Apr-12 13-Apr-12
8
3 3 3 5 4 3 2 2 1 2 1
Days
17-Apr-12 19-Apr-12 21-Apr-12 19-Apr-12 21-Apr-12 24-Apr-12 26-Apr-12 27-Apr-12 28-Apr-12 28-Apr-12 30-Apr-12
43 Days
44 Days
B1
1 2 2A 2B 2C 2D 2E 3 3A 3B 3C 4 4A 4B 4C 5 6 6A 6B 6C 6D 6E 7 7A 7B 8 9 10 11
L2-GENTS TOILET
B2
1
L2-LADIES TOILET
Protection of Flooring using POP REMOVING False ceiling Mirror Sanitory fixture Cubicle doors. Wash basin counter DEMOLITION + CLERAING OF DEBRIS Inside cubicle Outside cubicle Masonary work for WC(Ledge wall) DADOING +FLOORING Inside Cubicle Outside Cubicle Flooring ACID WASH FIXING Wash Basin Counter & Urinal partion Water Closet Wash Basin with accessories DOOR for Cubicle(scraping+Painting) Toilet Fixture FALSE CEILING Grid Fixing Tile Fixing Mirror Fixing Water Test on fixed fixture Deep Cleaning Walk Through
4
1 1 3 2 1
Days 19-Mar-12
19-Mar-12 19-Mar-12 21-Mar-12 22-Mar-12
2 19-Mar-12 19-Mar-12 21-Mar-12 22-Mar-12 22-Mar-12 3 28-Mar-12 2-Apr-12 4-Apr-12 4 9-Apr-12 5-Apr-12 13-Apr-12 15-Apr-12 18-Apr-12 21-Apr-12 23-Apr-12 27-Apr-12 30-Apr-12 7 2-May-12 4-May-12 3-May-12 3-May-12 5-May-12 6-May-12 8 9 10 11 5 6 6A 6B 6C 6D 6E 7A 7B 4A 4B 4C 3A 3B 3C 2A 2B 2C 2D 2E
13
6 6 3
Days 23-Mar-12
28-Mar-12 2-Apr-12
9
5 4 4 2
Days
5-Apr-12 2-Apr-12 10-Apr-12 14-Apr-12
15
3 3 3 5 4 3 2 2 1 2 1
Days
16-Apr-12 19-Apr-12 21-Apr-12 23-Apr-12 27-Apr-12 30-Apr-12 3-May-12 2-May-12 3-May-12 4-May-12 6-May-12
Protection of Flooring using POP REMOVING False ceiling Mirror Sanitory fixture Cubicle doors. Wash basin counter DEMOLITION + CLERAING OF DEBRIS Inside cubicle Outside cubicle Masonary work for WC(Ledge wall) DADOING +FLOORING Inside Cubicle Outside Cubicle Flooring ACID WASH FIXING Wash Basin Counter Water Closet Wash Basin with accessories DOOR for Cubicle(scraping+Painting) Toilet Fixture FALSE CEILING Grid Fixing Tile Fixing Mirror Fixing Water Test on fixed fixture Deep Cleaning Walk Through
4
1 1 3 2 1
Days 19-Mar-12
19-Mar-12 19-Mar-12 21-Mar-12 22-Mar-12
19-Mar-12 19-Mar-12 21-Mar-12 22-Mar-12 22-Mar-12 30-Mar-12 4-Apr-12 6-Apr-12 11-Apr-12 7-Apr-12 15-Apr-12 17-Apr-12 20-Apr-12 23-Apr-12 25-Apr-12 29-Apr-12 2-May-12 4-May-12 6-May-12 5-May-12 5-May-12 7-May-12 8-May-12
13
6 6 3
Days 25-Mar-12
30-Mar-12 4-Apr-12
9
5 4 4 2
Days
7-Apr-12 4-Apr-12 12-Apr-12 16-Apr-12
15
3 3 3 5 4 3 2 2 1 2 1
Days
18-Apr-12 21-Apr-12 23-Apr-12 25-Apr-12 29-Apr-12 2-May-12 5-May-12 4-May-12 5-May-12 6-May-12 8-May-12
48 Days
50 Days
Sl.No A1 C1
1 2 2A 2B 2C 2D 2E 3 3A 3B 3C 4 4A 4B 5 6 6A 6B 6C 6D 6E 7 7A 7B 8 9 10 11
Description
L3-GENTS TOILET L1-GENTS TOILET
No Of Days
Start Date
Completion Date
Sl.No A2 C2
1
Description
L3-LADIES TOILET L1-LADIES TOILET
No Of Days
Start Date
Completion Date
Protection of Flooring using POP REMOVING False ceiling Mirror Sanitory fixture Cubicle doors. Wash basin counter DEMOLITION + CLERAING OF DEBRIS Inside cubicle Outside cubicle Masonary work for WC(Ledge wall) DADOING +FLOORING Inside Cubicle Outside Cubicle Flooring ACID WASH FIXING Wash Basin Counter & Urinal partion Water Closet Wash Basin with accessories DOOR for Cubicle(scraping+Painting) Toilet Fixture FALSE CEILING Grid Fixing Tile Fixing Mirror Fixing Water Test on fixed fixture Deep Cleaning Walk Through
4
1 1 3 2 1
Days 22-Mar-12
22-Mar-12 22-Mar-12 24-Mar-12 25-Mar-12
2 22-Mar-12 22-Mar-12 24-Mar-12 25-Mar-12 25-Mar-12 3 31-Mar-12 5-Apr-12 7-Apr-12 4 12-Apr-12 8-Apr-12 16-Apr-12 18-Apr-12 21-Apr-12 24-Apr-12 26-Apr-12 30-Apr-12 3-May-12 7 5-May-12 7-May-12 6-May-12 6-May-12 8-May-12 9-May-12 8 9 10 11 5 6 6A 6B 6C 6D 6E 7A 7B 4A 4B 3A 3B 3C 2A 2B 2C 2D 2E
13
6 6 3
Days 26-Mar-12
31-Mar-12 5-Apr-12
9
5 4 4 2
Days
8-Apr-12 5-Apr-12 13-Apr-12 17-Apr-12
15
3 3 3 5 4 3 2 2 1 2 1
Days
19-Apr-12 22-Apr-12 24-Apr-12 26-Apr-12 30-Apr-12 3-May-12 6-May-12 5-May-12 6-May-12 7-May-12 9-May-12
Protection of Flooring using POP REMOVING False ceiling Mirror Sanitory fixture Cubicle doors. Wash basin counter DEMOLITION + CLERAING OF DEBRIS Inside cubicle Outside cubicle Masonary work for WC(Ledge wall) DADOING +FLOORING Inside Cubicle Outside Cubicle Flooring ACID WASH FIXING Wash Basin Counter Water Closet Wash Basin with accessories DOOR for Cubicle(scraping+Painting) Toilet Fixture FALSE CEILING Grid Fixing Tile Fixing Mirror Fixing Water Test on fixed fixture Deep Cleaning Walk Through
4
1 1 3 2 1
Days 22-Mar-12
22-Mar-12 22-Mar-12 24-Mar-12 25-Mar-12
22-Mar-12 22-Mar-12 24-Mar-12 25-Mar-12 25-Mar-12 2-Apr-12 7-Apr-12 9-Apr-12 14-Apr-12 10-Apr-12 18-Apr-12 20-Apr-12 23-Apr-12 26-Apr-12 28-Apr-12 2-May-12 5-May-12 7-May-12 9-May-12 8-May-12 8-May-12 10-May-12 11-May-12
13
6 6 3
Days 28-Mar-12
2-Apr-12 7-Apr-12
9
5 4 4 2
Days
10-Apr-12 7-Apr-12 15-Apr-12 19-Apr-12
15
3 3 3 5 4 3 2 2 1 2 1
Days
21-Apr-12 24-Apr-12 26-Apr-12 28-Apr-12 2-May-12 5-May-12 8-May-12 7-May-12 8-May-12 9-May-12 11-May-12
48 Days
50 Days