work flow for in-house system development

Team Leader Project Leader (ITM or above) Programmer QA Engineer CC Change Advisory Board Client Office
Provide Requirements

Propose High Level Design and Project Plan with manpower, system resources & Schedule

Review Design & Project Plan Signoff High Level Design & Project Plan

High Level Design QA

Arrange System Resources

Do Detail Design (DD) & Prototype

Review DD and Comment

Review DD & Prototype

DD & Prototype QA

Signoff Prototype

Review System and Comment

Review System & Program Code

System Development & Testing

System QA

*UAT and Signoff acceptance

Prepare document for roll-out approval

Approve system for roll-out and set roll-out date

Note: * UAT (User Acceptance Test) is an important process to verify that the system built has met the requirements specified by the client office. It is recommended that a test plan be developed for the task and the result of testing properly documented.