SUKRUT
Flow Indicators
Series: 4021, 4022 & 4031, 4032
DATA SHEET -F1-cOND.2
For Selecti
: Specifying and Ordering
Flow IndicatorsFunction
Flow incaors ineuded in mis eatlogue ae
‘nahty designed 35a safely dice eokng the
‘ed of an etecticl signal on fate of forced
{tedaion of tq in pipe ine. They peor
Totowa tuncvons
*Incat the rte of Yow in rcpt ection in
spectieg pipe
‘2 operate one cr wo mercury switenes when 318
of fow crops nero 1% of spate alow,
‘hese swrches can be used 10. inate
precautnary sytem or Sooty devices
Application
Conse the cage ol urns tranlorer tie
tne row indsigr can be mound on suitable
‘monber of of efeulsing sige and ore on water
‘treulatng pipe ot heat achander. The ptr of
fespocine ow indicator wil nacaie wether
Gesie ate flow matanedo rl and swe
vel operate Now arepe neato Te 0 mite
Precautionary ystom,Forsimiarpurpone canbe
teed on Hqué ercusting apes in chemical
processes, heavy duty bears. comorescrs cc
Mounting
To rerocuce these Few cats in a pipe ne a
Tedouning ienecseeay intnecatalagoe wohave
‘buintod emarscna of Mounting ft range
‘ce ro 40 ran (1.57) 0250 (10) NB. Phe,
[us customer ean says speci i hi xqarrent
"8 olforon than re abl on p99 8
Construction & working
-Asuspendod vane is wend ae sons. Ms src
kept at rai ange to aroctn of tow. Wer IQUE
ts tong tough pe, he vane pes deleted
Seng vane shat, Ts deletion is used To
inaeste Yow ‘oe the poe and 10 operate
‘mercury ewitchorewtchoe 2 olous
Apair of permanent magnets i uso as urcese
couping, The civing magnet & canrested wh
‘ane, tortor oites wis vane and remain 0
Tqud. The folewer magne, seperate by = non
magnetic wall, is kept tsge in at and aqures
positon corresponding to ating apne. The
fottmer magnet cares a pointer and car. The
panier i et ead te specie rat of fu Now
‘nd The cam is et operate one oF Two mercury
‘Swiches en few drops nea 6 70%.
‘Aretum sping used which acts nthe opposite
Stocien of flow. Hence any steady poslon of
ponies he rau of euloum of force ove fo
Impinging lui on vane, goring tenon & welt of
Wane. the pater dose rat tema S630) for
steagy howe. The se and shape of vane ans
{ension on etum spring esteem specied
{ul ton. The vane occupies very smal area out Of
{ul cass section af pipe at NO-FLOW porton, AL
{ton becomes aot para tow. Hence
there Is praciealy no pesoiest acs Flow
rot
Dial Marking
‘he spread of tow indica partion of dl sont
about 70" Honea It's not gos to pit more
Tarags. Usual PUMP ON PUMP OFF ox FULL
FLOW = NO FLOW type of mit macings a
printed. mtemedate mactings fue a ALARM,
TRIP are aso. prec 1" requled. Bese,
pocteions set as aie ofl ow, bi, 8
Size and dracon of tow are loo pied. The
texground of sal ute. Direction inetng
Brow fen Fea cou and all cer makings
bias cout
Switenes
(One or two mercury swches of SPST ‘pe are
‘proved Tar contact postion can be sata NOor
NC at ul tow que, sulleh can be changed
rom NOWW NCor ve versa at
hr caso of cng swith, tis set 0 operate near
To% wen Maw is fang ln e3g0 of to omens
both ate mounted en came pila. Hence bat
pert at same rato fow-Butin edo to sais
Gesign equemens, one sien cate sel
‘operat near 80% andthe eter noar 70% one
ear TO% and te other tear Os. Hf nok
Possible a swton to para at lower value
fan 60%. Even when toin swichee are ct fo
operat ai same tate of tom, sone swiching
Siferenta ic caved do to use of maroury 25
Swlching element. We-can medi eating Suto
I ewiching requirements are clary speced
Wiring
Loade tom mercury seventies sre oreush!
into'a rma bor postoned st the botlomat
roves Terminals are aeaeeaile for wring ser
Famoung cower A Pole with conduit toa i
Provide Yor eng cate Gand 0 aoe. Terminals
Sle martee. Wing shou be done a. per
Fespectve wing dlagrams
setting
Fall Flow: cach talcator 9 ae 9 vateroweag
conden. pe sue, pe poor. recton a love
fare maintained. By adusing a vale n ge ine
{he acted rai a ul low i estalanedtnen ne
potter elo ac te flow mark, Thermetnes
Graeting gues very accurate reste ass based
‘memulnur of ane aul own ease of ai
Sher than water, sroporons| ao! How of water
\emaintaiet for setng
‘Switch. Aner sping of pointer at full fw.
Siches ate. sal ne smquenceoxdered 2)
customer. Pow is feduced lo heck operation
‘ch & inereaced to check automate resin.
Tho rate of fow at whi sting occur
appronate, Te svn postion sept ajustahe
fosompersstecitanceinpipe grass! = 8t6Testing
Static Pressure: A 7 Ka/Gm2
Flow Ingeator mounted on pipe. Wer a
‘heokedwiben poner read ul flow For lids
‘ter an ater proportional ate ow of water
Switch: Sten cpevaton ie checked by reducing
andineroasin town pe ne
Contact cating: Swicras ate tated in laboratory
arsazdovAc
Dialectic strength: Live trina ar checked ot
2x ith Bods
‘ost Ceiicate ic provided wth each instrument
Fig. 1
p
Horizontal pipe
Bem
tom Description
How to order
In ocdet to be abe to oer sabe Foe neater
-weneed eloning information:
1 Lauin ine
2 Speco ray tx
4 Fase alow in LP at
4 Pe see
5 Pipe poston
1 Brocton of Yow amet only ane een
7 Saieh eating
8 Dal Making
Wer Tamera
10. Weskag Promave
1 Mourn Recitedor Not Rogue
12. Quay agar cach spereaton|
2 Teouting
Design features
1 Swilch contacts are ot afectad by aust,
humiay or conse aiepirs.
2Swtches. can be senices wine need of
‘sono ow
5 Causes neste heactios,
44. Low maintenance cot
5 onust conection & oun tes eeraice
{6-Dons not got damaged duo to excess tow or
Schematic
tem Description
Pinter & dal
Morcury sich
Switch eperating cam
Feturn spr
Vane stat
Main pe
Driving Magnet
Nonmagrote wall
Flower magnet
Working positions.
Connecting tanges
Fiow indeator
Prange tor isto
Vertical pipe
Notes
1. Flow indicators are not interchangeable for
itera iis. pige a, drocton ol Tow erate ot
‘ul iow. Hence they sheutsbe cored caparatey
2, The rate ful twit acute
3. Te switch operation pons no aistable
4. We comnuousty review epecitestions. and
snore appropiate, ioduce maaiicalons. We,
therefor eave the. ght fo. change
peerications inthis eataleque without prior nies
a