Deploy Image Cycle Time Six Sigma Case Study
BMW Account
Project Leader:
Start Date:
Mean 1 min
USL LSL 46.0000 Target Mean Sample N
Process Data
USL
Within Overall
* *
6 Z_ST
0.5804 24
StDev (Within)
0.0069380
Results/Benefits
After the project, the customer saved US$170K, or 30%, as a result of reduced end user downtime.
Cpm Overall Capability Pp PPU PPL Ppk
Observed Performance * PPM < LSL PPM > USL PPM Total * 0.00 0.00
Exp. "Within" Performance PPM < LSL PPM > USL PPM Total * 0.00 0.00
Exp. "Overall" Performance PPM < LSL PPM > USL PPM Total * 0.00 0.00