Boiler Plant Room Boiler 1 3" pipe 4kW

9th Floor at Block A


Calorifier 1,005 Gallon

Feed tank

Feed Tank 4kW Treatment Water Inlet 4kW 3" pipe

Boiler 2

Calorifier 1,005 Gallon

Autoclave Boiler 3 Calorifier

Calorifier 150 Gallon

Ground Floor at Block C

Ground Floor at Block D Condensate Tank 580C 1.5kW x 2


Calorifier 407 Gallon Calorifier 150 Gallon

Ground Floor at Block E


Calorifier 407 Gallon Calorifier 1000 Gallon

Services Tunnel at Boiler plant room

Service Tunnel Block A

Note: Treatment Water average temp around 330 C Hot Water Supply at around 830C to Boiler Steam supply at around 2000 C Hot Water Supply at 400C to user Condensate Water

System Description: - Boiler generate steam and supply to various calorifier. Boiler only run one at a time from about 0600 to 2200. - Condensate water from calorifier is return back to condensate tank. - Treatment water less used as it recycle the condensate water to feed tank. - Steam used for autoclave and no return steam back to the system. - Steam consumption 60% and hot water 40%

You might also like