Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

JOB SAFETY ANALYSIS JSA No.

: WI/JSA001
PPE / SAFETY EQUIPMENT : Basic PPE/LEL Meter/Probing Rod/ Fire Extinguisher

JOB DESCRIPTION / PROJECT :

Equipment No : Location : MTR STN Company/Department : Page : 01 of 01

Date : 26 SEPT 07

Analyzed By : YED

Reviewed By : MND

Approved By :

ID

BASIC WORK SEQUENCE

HAZARDOUS

POTENTIAL ACCIDENT OR HAZARDS

PRE-CAUTIONARY MEASURE

ACTION BY

SOIL PROBING

1. Personnel 2. PGB Facilities

1. Damage to underground facilities

1. PTW must be valid. 2. Refer to existing drawings or guided by PGB Personnel. 3. Use pipe or cable locator to identify underground facilities. 4. Perform probing prior to start digging. 1. Use proper hand gloves. 2. Do not probe by bare hand. Use recommended tools.

1. Supervisor 2. Workers 3. PGB

2. Hand injuries

1. Supervisor 2. Workers 3. PGB 1. Supervisor 2. Workers 3. PGB

3. Eye injuries

1. Beware of wind direction. 2. Don's trash access soil direct wind direction as it cause soil debris get into eye. 3. Have eye wash kit (mineral water) if necessary.

Rev : 0

You might also like