Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Page 1 of 2

Radiogram No. 5793u Form 24 for 07/24/07


BACKUP SINGLE BURN ISS REBOOST USING PROGRESS 360
GMT CREW ACTIVITY

07:00-07:10 CDR, FE-1 Morning Inspection


07:00-07:05 SLEEP - data logging
FE-2
07:05-07:20 Biochemical Urine Test
07:10-07:20 CDR
07:10-07:40 FE-1 Post-sleep
07:20-07:55 FE-2
07:20-07:35 Biochemical Urine Test
CDR
07:35-07:45 Stowing Urolux hardware
07:40-08:30 FE-1 BREAKFAST
07:45-07:55 Post-sleep
CDR
07:55-08:45
BREAKFAST
07:55-08:50 FE-2
08:40-09:10 FE-1
Prep for Work
08:45-09:15 CDR
08:50-10:20 FE-2 Physical Exercise (TVIS)
09:10-09:30 ИК0501Gas Analyzer O2 Readings Adjustment. Tagup with specialists (S-band)
09:30-09:45 FE-1 Post-EVA Pille dosimeter reading
09:45-10:05 PLANTS-1. Data collection and downlink
10:20-10:30 FE-2 Prep for Work
CDR,
10:20-10:30
FE-1 пом
Post-EVA Crew Health Status
FE-2,
10:30-10:40
FE-1 пом
ACH-M НВМ-2 [Satellite Navigation System-M Navigation Computer Module-2]:
10:30-11:30 CDR
test software upload from Laptop. Tagup with specialists (S-band)
10:50-11:00 EMU PWR Prep
FE-2
11:00-11:35 EMU. Degas
11:10-12:10 FE-1 Physical Exercise (VELO + RED) day 1
11:35-11:55 CDR, FE-2 EVA water refill
11:55-12:15 FE-2 Start BSA battery charge
11:55-12:55 CDR Physical Exercise (VELO+RED) day 1
12:10-12:30 FE-1 Post-EVA Crew Health Status – data transfer
12:15-12:25 Start EMU METOX Regeneration
FE-2
12:25-12:30 Disconnect RWS cable
12:55-13:40 EVA tagup with MCC (Ku + S-band)
13:40-13:45 CDR On MCC GO ISS O2 repress from Progress 359 СрПК (start)
13:45-14:45 LUNCH
14:45-14:50 CDR ISS O2 repress from Progress 359 СрПК (terminate)
14:50-15:20 CDR, FE-2 Post-EVA Airlock reconfig
15:00-15:40 FE-1 СОЖ Maintenance
Page 2 of 2

16:05-16:20 US Ground Site VHF Test


FE-2
16:20-17:20 Physical Exercise (RED)
16:20-17:50 CDR Physical Exercise (TVIS), Day 1
16:25-16:40 FE-1
Private Medical Conference (Ku + S-band)
17:20-17:35 FE-2
17:30-19:00 FE-1 Physical Exercise (TVIS), Day 1
17:50-18:05 CDR Private Medical Conference (Ku + S-band)
17:55-18:10 Questionnaire - journal entry
FE-2
18:10-18:55
Evening work prep
18:15-19:00 CDR
18:55-19:00 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
19:00-19:15 Daily Planning Conference (S-band)
19:15-19:30 Evening work prep
19:30-20:00 DINNER
20:00-20:30 Daily food prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
RS ISS Audit
Task List CDR,FE-1
RS ISS Module Photo/Video
Note: See OSTP for references to US activities.
End of Radiogram

You might also like