Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 127

Laboratorium Rekayasa Transportasi

Jurusan Sipil Fakultas Teknik


Universitas Hasanuddin

EDITAN

Analisa Gabungan Agregat


No. Ayakan
Chipping

Pasir

Abu Batu

% Used % Lolos
60%

1/2"

3/8"

no. 4

no. 8

no. 30

no.50

no. 100

no. 200

100.000 100.000

70.427

27.847

5.020

0.000

0.000

0.000

0.000

60.000

42.256

16.708

3.012

0.000

0.000

0.000

0.000

60.000

% Used % Lolos

100.000 100.000 100.000 100.000 100.000

63.940

40.180

20.100

10.740

18.000% % Tertahan

18.000

18.000

18.000

11.509

7.232

3.618

1.933

% Used % Lolos

100.000 100.000 100.000 100.000

64.620

41.030

30.330

26.110

10.890

22.000% % Tertahan

22.000

Agregat Gabungan
Speksifikasi

% Tertahan

3/4"

18.000

18.000

22.000

22.000

22.000

14.216

9.027

6.673

5.744

2.396

100.000 100.000

82.256

56.708

35.228

20.536

13.905

9.362

4.329

80-100

55-75

35-50

18-29

13-23

8-16

4-10

100

100

Makassar, 17 November 2009


Diperiksa oleh :
Asisten Laboratorium

(NURUL TRIZANIWATI)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ORIGINAL

Analisa Gabungan Agregat


No. Ayakan
Chipping

Pasir

Abu Batu

% Used % Lolos
59%

% Used % Lolos
25%

% Tertahan

% Used % Lolos
16%

Agregat Gabungan
Speksifikasi

% Tertahan

% Tertahan

3/4"

1/2"

3/8"

no. 4

no. 8

no. 30

no.50

no. 100

no. 200

100.000 100.000

36.620

4.653

5.020

0.000

0.000

0.000

0.000

59.000

21.606

2.745

2.962

0.000

0.000

0.000

0.000

100.000 100.000 100.000 100.000

100.000

96.770

86.010

37.100

1.540

25.000

25.000

25.000

24.193

21.503

9.275

0.385

100.000 100.000 100.000 100.000

89.900

57.310

40.210

14.390

6.170

16.000

59.000

25.000

25.000

16.000

16.000

16.000

14.384

9.170

6.434

2.302

0.987

100.000 100.000

62.606

43.745

42.346

33.362

27.936

11.577

1.372

80-100

55-75

35-50

18-29

13-23

8-16

4-10

100

100

Makassar, 17 November 2009


Diperiksa oleh :
Asisten Laboratorium

(NURUL TRIZANIWATI)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PENGUJIAN BERAT JENIS DAN PENYERAPAN AGREGAT KASAR


(SPECIFIC GRAVITY AND ABSORPTION OF COARSE AGREGATE)

Tanggal

: 16 Nopember 2009

Fakultas

Kelompok

: XIX

Metode Pengujian : SNI 03-1970-1990

Berat Sampel

: 1000 gram

Asisten

KETERANGAN

: Teknik Sipil

: NURUL TRIZANIWATI

II

Rata-rata

Berat contoh kering oven

(gr)

2468.10

2448.60

2458.35

Berat contoh kering permukaan

(gr)

2539.00

2513.00

2526.00

Berat contoh dalam air

(gr)

1597.60

1579.60

1588.60

2.62

2.62

2.62

2.70

2.69

2.69

2.84

2.82

2.83

2.87

2.63

2.75

Berat jenis kering oven

(bulk specific gravity)

B-C

Berat jenis kering permukaan jenuh

(saturated surface dry)

B -C

Berat jenis semu

(apparent specific gravity)


Penyerapan air
(water absorption)

A-C
B-A
A

100%

Makassar,16 Nopember 2009


Diperiksa oleh :
Asisten Laboratorium

( Sukiman )

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PENGUJIAN BERAT JENIS DAN PENYERAPAN AGREGAT HALUS (PASIR)


(SPECIFIC GRAVITY AND ABSORPTION OF FINE AGREGATE)

Tanggal

: 16 Nopember 2009

Fakultas

Kelompok

: XIX

Metode Pengujian :

SNI 03-1968-1990

Berat Sampel

: 1000 gram

Asisten

NURUL TRIZANIWATI

KETERANGAN

Teknik Sipil

RUMUS

II

Rata-rata

Berat contoh kering oven

(gr)

487.60

488.50

488.05

Berat botol+air sampai batas kalibrasi

(gr)

755.50

756.70

756.10

(gr)
Berat contoh+botol+air sampai batas kalibrasi

1079.10

1086.00

1083

2.76

2.86

2.81

2.83

2.93

2.88

2.97

3.07

3.02

2.54

2.35

2.45

Berat jenis kering oven

(bulk specific gravity)

B+500-C

Berat jenis kering permukaan jenuh

500

(saturated surface dry)

B+500-C

Berat jenis semu

(apparent specific gravity)


Penyerapan air

B+A-C
500-A

(water absorption)

100%

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

( Sukiman )

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

BERAT JENIS DAN PENYERAPAN AIR AGREGAT HALUS (DEBU BATU)


(SPECIFIC GRAVITY AND ABSORPTION OF FINE AGREGATE)

Tanggal

: 16 Nopember 2009

Jurusan

: Teknik Sipil

Kelompok

: XIX

Metode Pengujian

: SNI 03-1968-1990

Berat Sampel

: 1000 gram

Asisten

: NURUL TRIZANIWATI

KETERANGAN

RUMUS

II

Rata-rata

Berat contoh kering oven

(gr)

487.20

486.40

486.80

Berat botol+air sampai batas kalibrasi

(gr)

765.60

764.80

765.20

(gr)
Berat contoh+botol+air sampai batas kalibrasi

1079.00

1078.20

1078.60

2.61

2.61

2.61

2.68

2.68

2.68

2.80

2.81

2.81

2.63

2.80

2.71

Berat jenis bulk

B+500-C

(atas dasar kering oven)

500

Berat jenis bulk

B+500-C

(atas dasar kering permukaan)

Berat jenis semu


Penyerapan air

B+A-C
500-A

(water absorption)

100%

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

( Sukiman )

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

BLANDING CHART
No. 200

No. 100

100

No. 50

No. 8

No. 30

3/8"

No. 4

1/2"

3/4"

a'

90

Pasir
80

Debu Batu

70

77%
Chipping

60

50

Chipping

40
30

11%
Pasir

20

10

12%

Debu Batu

10

KETERANGAN : a = a'
b+c=d

20

30

40

50

60

70

80

90

100

Chipping

= 75%

Pasir

= 9%

Debu Batu

= 16%

LaboratoriumRekayasa Tranportasi
Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN INDEKS KEPIPIHAN


(Flakiness Index)

Tanggal

Jurusan

Kelompok

Metode Pengujian :

Berat Sampel : 1000 gr

Nomor

Ukuran
Thickness Gauge
Gradasi
Saringan Lebar Panjang
(mm)
(mm)
I
3/4" 1/2"
6.67
38.2
II
1/2" 3/8"
4.8
25.4
Total
Total Berat A
Indeks
=
x 100 %
Total Berat C
Kepipihan

Asisten

: Teknik Sipil
SNI 03-1968

Berat
Berat
Total
Lolos
Tertahan
Berat
(Gram)
(Gram)
(Gram)
A
B
C
51.1
448.9
500
37.1
462.9
500
88.2
911.8
1000
88.2
x 100% = 8.8%
1000

Nomor

Ukuran
Berat
Berat TerThickness
Gauge
Lolos
Slot
tahan Slot
Gradasi
Saringan Lebar Panjang
(Gram)
(Gram)
A
B
(mm)
(mm)
I
3/4" 1/2"
6.67
38.2
28.5
471.5
II 1/2" 3/8"
4.8
25.4
28
472
Total
56.5
943.5
Total
Berat
A
56.5
Indeks
=
x 100 %
x 100% =
5.7%
Total Berat C
1000
Kepipihan

Total
Berat
(Gram)
C
500
500
1000

Makassar, 27 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Jalan Raya dan Aspal


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN INDEKS KELONJONGAN


(Elongation Index)

Tanggal

Jurusan

Kelompok

Metode Pengujian : SNI 03-6717-2002

Nomor

Berat Contoh :

Gradasi
Saringan

Ukuran alat
Lebar
(mm)
10 - 14
6.3 - 10

3/4" 1/2"
1/2" 3/8"
Total
Total Berat A
Indeks
=
x 100 %
Kepipihan Total Berat C

Nomor

I
II

1000 gr

I
II

Gradasi
Saringan

Ukuran alat
Lebar
(mm)
10 - 14
6.3 - 10

3/4" 1/2"
1/2" 3/8"
Total
Total
Berat A
Indeks
=
x 100 %
Kepipihan Total Berat C

: Teknik Sipil

Asisten

Berat
Berat
Total
Lolos
Tertahan
Berat
(Gram)
(Gram)
(Gram)
A
B
C
65.50
434.50
500
162.50
337.50
500
228.00
772.00
1000
228
x 100% = 22.8%
1000
Berat
Berat
Total
Lolos
Tertahan
Berat
(Gram)
(Gram)
(Gram)
A
B
C
79.10
420.90
500
143.10
356.90
500
222.20
777.80
1000
222
x 100% = 22.22%
1000

Makassar, 27 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN KEAUSAN DENGAN MESIN LOS ANGELES


(Los Angeles Abrassion Test)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian

: SNI 03-2417-1991

Berat Sampel

: 5000 gram

Asisten

Gradasi

No. Sampel

Saringan

I
A

Berat
Sesudah (gr)

Berat
Sebelum (gr)

Berat
Sesudah (gr)

Lolos

Tertahan

Berat
Sebelum (gr)

3/4"

1/2"

2500

1/2"

3/8"

2500

Jumlah Berat (gram)

II

2500
4183.5

2500

5000

4223.7

5000

Berat Tertahan
4183.5

4223.7

Saringan No. 12 (gram)


Keausan
A-B

5000 - 4184
x 100%

5000 - 4224
100% = 16.33%

x100% = 15.53%

5000
Rata - rata

5000
15.93%

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

443.60

443.60

29.57

70.43

638.70

1082.30

72.15

27.85

342.40

1424.70

94.98

5.02

30

75.30

1500.00

100.00

0.00

50

0.00

1500.00

100.00

0.00

100

0.00

1500.00

100.00

0.00

200

0.00

1500.00

100.00

0.00

PAN

0.00

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100
100.0000

PASIR
100
90
65
42.5
23.5
18
12
7

100.0000
36.6200
4.8867
0.5867
0.2333
0.2133
0.1400
0.0133

90
36.6200

65
4.8867

42.5
0.5867

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00000
100.00000
100.00000
100.00000
63.94000
40.18000
20.10000
10.74000

23.5
0.2333

18
0.2133

12
0.1400

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

30

360.60

360.60

36.06

63.94

50

237.60

598.20

59.82

40.18

100

200.80

799.00

79.90

20.10

200

93.60

892.60

89.26

10.74

PAN

107.40

1000.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium
110.0000
100.0000

90.0000
80.0000

NO. 200
NO. 50
NO. 100
NO. 30

NO. 8

NO. 4

(Sul Munawir)

DEBU BATU
100
90
65
42.5
23.5
18
12
7

Persen Lolos

80.0000
KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)
70.0000
60.0000
50.0000

100.0000
40.0000
100.0000
30.0000
100.0000
64.6200
20.0000
41.0300
30.3300
10.0000
26.1100
10.8900
0.0000
0

12
0.1400

7
0.0133

10

20

30

40

50

60

No Saringan

70

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

353.80

353.80

35.38

64.62

30.00

235.90

589.70

58.97

41.03

50.00

107.00

696.70

69.67

30.33

100.00

42.20

738.90

73.89

26.11

200.00

152.20

891.10

89.11

10.89

PAN

108.90

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium
3/8"

1/2"

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Series1

80

90

100

110

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

443.60

443.60

29.57

70.43

638.70

1082.30

72.15

27.85

342.40

1424.70

94.98

5.02

30

75.30

1500.00

100.00

0.00

50

0.00

1500.00

100.00

0.00

100

0.00

1500.00

100.00

0.00

200

0.00

1500.00

100.00

0.00

PAN

0.00

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100
100.0000

PASIR
100
90
65
42.5
23.5
18
12
7

100.0000
70.4267
27.8467
5.0200
0.0000
0.0000
0.0000
0.0000

90
100.0000

65
100.0000

42.5
98.4500

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00000
100.00000
100.00000
98.45000
95.22000
86.01000
38.60000
3.04000

23.5
95.2200

18
86.0100

12
38.6000

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

30

360.60

360.60

36.06

63.94

50

237.60

598.20

59.82

40.18

100

200.80

799.00

79.90

20.10

200

93.60

892.60

89.26

10.74

PAN

107.40

1000.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium
110.0000
100.0000

90.0000
80.0000

NO. 200
NO. 50
NO. 100
NO. 30

NO. 8

NO. 4

(Sul Munawir)

DEBU BATU
100
90
65
42.5
23.5
18
12
7

Persen Lolos

80.0000
KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)
70.0000
60.0000
50.0000

100.0000
40.0000
100.0000
30.0000
100.0000
64.6200
20.0000
41.0300
30.3300
10.0000
26.1100
10.8900
0.0000
0

12
38.6000

7
3.0400

10

20

30

40

50

60

No Saringan

70

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

353.80

353.80

35.38

64.62

30.00

235.90

589.70

58.97

41.03

50.00

107.00

696.70

69.67

30.33

100.00

42.20

738.90

73.89

26.11

200.00

152.20

891.10

89.11

10.89

PAN

108.90

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium
3/8"

1/2"

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Series1

80

90

100

110

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

443.60

443.60

29.57

70.43

638.70

1082.30

72.15

27.85

342.40

1424.70

94.98

5.02

30

75.30

1500.00

100.00

0.00

50

0.00

1500.00

100.00

0.00

100

0.00

1500.00

100.00

0.00

200

0.00

1500.00

100.00

0.00

PAN

0.00

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100
100.0000

PASIR
100
90
65
42.5
23.5
18
12
7

100.0000
70.4267
27.8467
5.0200
0.0000
0.0000
0.0000
0.0000

90
100.0000

65
100.0000

42.5
89.9000

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00000
100.00000
100.00000
100.00000
63.94000
40.18000
20.10000
10.74000

23.5
57.3100

18
40.2100

12
14.3900

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

30

360.60

360.60

36.06

63.94

50

237.60

598.20

59.82

40.18

100

200.80

799.00

79.90

20.10

200

93.60

892.60

89.26

10.74

PAN

107.40

1000.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium
110.0000

NO. 200
NO. 50
NO. 100
NO. 30

100.0000
90.0000

80.0000

(Sul Munawir)

NO. 8

80.0000
Persen Lolos

70.0000
KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)
60.0000

DEBU BATU
100
90
65
42.5
23.5
18
12
7

50.0000
40.0000

100.0000
100.0000
100.0000
89.9000
57.3100
40.2100
14.3900
6.1700

30.0000

20.0000
10.0000
0.0000

10

20

30

40

50
No Saringan

12
14.3900

7
6.1700

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

353.80

353.80

35.38

64.62

30.00

235.90

589.70

58.97

41.03

50.00

107.00

696.70

69.67

30.33

100.00

42.20

738.90

73.89

26.11

200.00

152.20

891.10

89.11

10.89

PAN

108.90

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium
NO. 4

3/8"

1/2"

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Series1

50

60

No Saringan

70

80

90

100

110

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

443.60

443.60

29.57

70.43

638.70

1082.30

72.15

27.85

342.40

1424.70

94.98

5.02

30

75.30

1500.00

100.00

0.00

50

0.00

1500.00

100.00

0.00

100

0.00

1500.00

100.00

0.00

200

0.00

1500.00

100.00

0.00

PAN

0.00

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100
100.0000

PASIR
100
90
65
42.5
23.5
18
12
7

100.0000
70.4267
27.8467
5.0200
0.0000
0.0000
0.0000
0.0000

90
70.4267

65
27.8467

42.5
5.0200

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00000
100.00000
100.00000
100.00000
63.94000
40.18000
20.10000
10.74000

23.5
0.0000

18
0.0000

12
0.0000

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

30

360.60

360.60

36.06

63.94

50

237.60

598.20

59.82

40.18

100

200.80

799.00

79.90

20.10

200

93.60

892.60

89.26

10.74

PAN

107.40

1000.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

110.0000
100.0000
90.0000

NO. 200
NO. 50
NO. 100
NO. 30

NO. 8

NO. 4

(Sul Munawir)

90.0000

DEBU BATU
100
90
65
42.5
23.5
18
12
7

Persen Lolos

80.0000
KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)
70.0000
60.0000
50.0000

100.0000
40.0000
100.0000
100.0000
30.0000
64.6200
41.0300
20.0000
30.3300
10.0000
26.1100
10.8900
0.0000
0

12
0.0000

7
0.0000

10

20

30

40

50

60

No Saringan

70

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

353.80

353.80

35.38

64.62

30.00

235.90

589.70

58.97

41.03

50.00

107.00

696.70

69.67

30.33

100.00

42.20

738.90

73.89

26.11

200.00

152.20

891.10

89.11

10.89

PAN

108.90

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium
3/8"

1/2"

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Series1

80

90

100

110

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

443.60

443.60

29.57

70.43

638.70

1082.30

72.15

27.85

342.40

1424.70

94.98

5.02

30

75.30

1500.00

100.00

0.00

50

0.00

1500.00

100.00

0.00

100

0.00

1500.00

100.00

0.00

200

0.00

1500.00

100.00

0.00

PAN

0.00

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100
100.0000

PASIR
100
90
65
42.5
23.5
18
12
7

100.0000
70.4267
27.8467
5.0200
0.0000
0.0000
0.0000
0.0000

90
100.0000

65
100.0000

42.5
100.0000

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00000
100.00000
100.00000
100.00000
63.94000
40.18000
20.10000
10.74000

23.5
63.9400

18
40.1800

12
20.1000

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

30

360.60

360.60

36.06

63.94

50

237.60

598.20

59.82

40.18

100

200.80

799.00

79.90

20.10

200

93.60

892.60

89.26

10.74

PAN

107.40

1000.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium
110.0000
100.0000

90.0000
80.0000

NO. 200
NO. 50
NO. 100
NO. 30

NO. 8

NO. 4

(Sul Munawir)

DEBU BATU
100
90
65
42.5
23.5
18
12
7

Persen Lolos

80.0000
KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)
70.0000
60.0000
50.0000

100.0000
40.0000
100.0000
30.0000
100.0000
64.6200
20.0000
41.0300
30.3300
10.0000
26.1100
10.8900
0.0000
0

12
20.1000

7
10.7400

10

20

30

40

50

60

No Saringan

70

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

353.80

353.80

35.38

64.62

30.00

235.90

589.70

58.97

41.03

50.00

107.00

696.70

69.67

30.33

100.00

42.20

738.90

73.89

26.11

200.00

152.20

891.10

89.11

10.89

PAN

108.90

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium
3/8"

1/2"

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Series1

80

90

100

110

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

443.60

443.60

29.57

70.43

638.70

1082.30

72.15

27.85

342.40

1424.70

94.98

5.02

30

75.30

1500.00

100.00

0.00

50

0.00

1500.00

100.00

0.00

100

0.00

1500.00

100.00

0.00

200

0.00

1500.00

100.00

0.00

PAN

0.00

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100
100.0000

PASIR
100
90
65
42.5
23.5
18
12
7

100.0000
70.4267
27.8467
5.0200
0.0000
0.0000
0.0000
0.0000

90
100.0000

65
100.0000

42.5
64.6200

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00000
100.00000
100.00000
100.00000
63.94000
40.18000
20.10000
10.74000

23.5
41.0300

18
30.3300

12
26.1100

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

30

360.60

360.60

36.06

63.94

50

237.60

598.20

59.82

40.18

100

200.80

799.00

79.90

20.10

200

93.60

892.60

89.26

10.74

PAN

107.40

1000.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium
110.0000

NO. 200
NO. 50
NO. 100
NO. 30

100.0000
90.0000

80.0000

(Sul Munawir)

NO. 8

80.0000
Persen Lolos

70.0000
KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)
60.0000

DEBU BATU
100
90
65
42.5
23.5
18
12
7

50.0000
40.0000

100.0000
100.0000
100.0000
64.6200
41.0300
30.3300
26.1100
10.8900

30.0000

20.0000
10.0000
0.0000

10

20

30

40

50
No Saringan

12
26.1100

7
10.8900

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

353.80

353.80

35.38

64.62

30.00

235.90

589.70

58.97

41.03

50.00

107.00

696.70

69.67

30.33

100.00

42.20

738.90

73.89

26.11

200.00

152.20

891.10

89.11

10.89

PAN

108.90

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium
NO. 4

3/8"

1/2"

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Series1

50

60

No Saringan

70

80

90

100

110

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT KASAR

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,500 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

950.70

950.70

63.38

36.62

476.00

1426.70

95.11

4.89

64.50

1491.20

99.41

0.59

30

5.30

1496.50

99.77

0.23

50

0.30

1496.80

99.79

0.21

100

1.10

1497.90

99.86

0.14

200

1.90

1499.80

99.99

0.01

PAN

0.20

1500.00

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

KERIKIL
100
90
65
42.5
23.5
18
12
7

100.00
36.62
4.89
0.59
0.23
0.21
0.14
0.01

PASIR
100
90
65
42.5
23.5
18
12
7

100.00
100.00
100.00
98.45
95.22
86.01
38.60
3.04

DEBU BATU
100
90
65
42.5
23.5
18
12
7

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS ( PASIR)

Tanggal

: 29 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

: Sul Munawir

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

0.00

0.00

0.00

100.00

15.50

15.50

1.53

98.45

30

32.30

47.80

4.71

95.22

50

107.60

155.40

15.30

86.01

100

489.10

644.50

63.47

38.60

200

355.60

1000.10

98.48

3.04

PAN

15.40

1015.50

100.00

0.00

Makassar, 29 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

DEBU BATU
100
90
65
42.5
23.5
18
12
7

100.00
100.00
100.00
89.90
57.31
40.21
14.39
6.17

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA SARINGAN AGREGAT HALUS (DEBU BATU)

Tanggal

Jurusan

: Teknik Sipil

Kelompok

Metode Pengujian: SNI 03-1970-1990

Berat Sampel

: 1,000 gram

Asisten

No.
Saringan

Berat
Tertahan
(gram)

Kumulatif
Tertahan
(gram)

Persen
Total Tertahan
(%)

Persen
Lolos
(%)

3/4"

0.00

0.00

0.00

100.00

1/2"

0.00

0.00

0.00

100.00

3/8"

0.00

0.00

0.00

100.00

4.00

0.00

0.00

0.00

100.00

8.00

101.00

101.00

10.10

89.90

30.00

325.90

426.90

42.69

57.31

50.00

171.00

597.90

59.79

40.21

100.00

258.20

856.10

85.61

14.39

200.00

82.20

938.30

93.83

6.17

PAN

61.70

1000.00

100.00

0.00

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

ANALISA DATA MIX DESIGN


Pembagian berat dari fraksi butir agregat berdasarkan presentasi dari gradasi agregat.
Kadar aspal

4.5%

b Material Chipping
3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100.00%
no. 4
= (
73.09%
no. 8
= (
35.13%
no. 30 = (
19.35%
no. 50 = (
11.01%
no. 100 = (
8.99%
no. 200 = (
4.30%
PAN
= (
0.84%
b Material Pasir
3/4"
= (
1/2"
= (
3/8"
= (
no. 4
= (
no. 8
= (
no. 30 = (
no. 50 = (
no. 100 = (
no. 200 = (
PAN
= (

100%
100%
100%
100%
100%
77.97%
46.81%
30.45%
10.00%
8.90%

b Material Debu Batu


3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100%
no. 4
= ( 100%
no. 8
= ( 100%
no. 30 = (
88.43%
no. 50 = (
53.87%
no. 100 = (
40.94%

- 4.5%
745.855
745.855
745.855
745.855
745.855
745.855
745.855
745.855
745.855
745.855

) x 71% x 1100
=
0.00 gram
=
0.00 gram
= 200.71 gram
= 283.13 gram
= 117.70 gram
=
62.20 gram
=
15.07 gram
=
34.98 gram
=
25.81 gram
=
6.27 gram

= 745.855 gram

= ( 100%
100% ) x
100.00% ) x
73.09% ) x
35.13% ) x
19.35% ) x
11.01% ) x
8.99% ) x
4.30% ) x
0.84% ) x
0% ) x

- 4.5%
157.575
157.575
157.575
157.575
157.575
157.575
157.575
157.575
157.575
157.575

) x 15% x 1100
=
0.00 gram
=
0.00 gram
=
0.00 gram
=
0.00 gram
=
34.71 gram
=
49.10 gram
=
25.78 gram
=
32.22 gram
=
1.73 gram
=
14.02 gram

= 157.575 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
77.97% ) x
46.81% ) x
30.45% ) x
10.00% ) x
8.90% ) x
0.00% ) x

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
88.43% ) x
53.87% ) x
40.94% ) x
22.40% ) x

- 4.5% ) x 14% x 1100


147.07 =
0.00 gram
147.07 =
0.00 gram
147.07 =
0.00 gram
147.07 =
0.00 gram
147.07 =
17.02 gram
147.07 =
50.83 gram
147.07 =
19.02 gram
147.07 =
27.27 gram

147.07 gram

no. 200 = (
PAN
= (

22.40% 19.96% -

19.96% ) x 147.07
0.00% ) x 147.07

=
=

3.59 gram
29.36 gram

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

Kadar aspal

5.0%

b Material Chipping
3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100.00%
no. 4
= (
73.09%
no. 8
= (
35.13%
no. 30 = (
19.35%
no. 50 = (
11.01%
no. 100 = (
8.99%
no. 200 = (
4.30%
PAN
= (
0.84%
b Material Pasir
3/4"
= (
1/2"
= (
3/8"
= (
no. 4
= (
no. 8
= (
no. 30 = (
no. 50 = (
no. 100 = (
no. 200 = (
PAN
= (

100%
100%
100%
100%
100%
77.97%
46.81%
30.45%
10.00%
8.90%

b Material Debu Batu


3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100%
no. 4
= ( 100%
no. 8
= ( 100%
no. 30 = (
88.43%
no. 50 = (
53.87%
no. 100 = (
40.94%

= ( 100% - 5.0% ) x 71% x 1100


0.00 gram
- 100% ) x 741.95 =
0.00 gram
- 100.00% ) x 741.95 =
- 73.09% ) x 741.95 = 199.66 gram
- 35.13% ) x 741.95 = 281.64 gram
- 19.35% ) x 741.95 = 117.08 gram
61.88 gram
- 11.01% ) x 741.95 =
8.99% ) x 741.95 =
14.99 gram
4.30%
741.95
=
34.80 gram
) x
0.84% ) x 741.95 =
25.67 gram
0.00% ) x 741.95 =
6.23 gram
-

741.95 gram

- 5.0% ) x 15% x 1100


156.75 =
0.00 gram
156.75 =
0.00 gram
156.75 =
0.00 gram
156.75 =
0.00 gram
156.75 =
34.53 gram
156.75 =
48.84 gram
156.75 =
25.64 gram
156.75 =
32.06 gram
156.75 =
1.72 gram
156.75 =
13.95 gram

156.75 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
77.97% ) x
46.81% ) x
30.45% ) x
10.00% ) x
8.90% ) x
0.00% ) x

- 5.0% ) x 14% x 1100


146.3 =
0.00 gram
146.3 =
0.00 gram
146.3 =
0.00 gram
146.3 =
0.00 gram
146.3 =
16.93 gram
146.3 =
50.56 gram
146.3 =
18.92 gram
146.3 =
27.12 gram

146.3 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
88.43% ) x
53.87% ) x
40.94% ) x
22.40% ) x

no. 200 = (
PAN
= (

22.40% 19.96% -

19.96% ) x 146.3
0.00% ) x 146.3

=
=

3.57 gram
29.20 gram

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

Kadar aspal

5.5%

b Material Chipping
3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100.00%
no. 4
= (
73.09%
no. 8
= (
35.13%
no. 30 = (
19.35%
no. 50 = (
11.01%
no. 100 = (
8.99%
no. 200 = (
4.30%
PAN
= (
0.84%
b Material Pasir
3/4"
= (
1/2"
= (
3/8"
= (
no. 4
= (
no. 8
= (
no. 30 = (
no. 50 = (
no. 100 = (
no. 200 = (
PAN
= (

100%
100%
100%
100%
100%
77.97%
46.81%
30.45%
10.00%
8.90%

b Material Debu Batu


3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100%
no. 4
= ( 100%
no. 8
= ( 100%
no. 30 = (
88.43%

- 5.5%
738.045
738.045
738.045
738.045
738.045
738.045
738.045
738.045
738.045
738.045

) x 71% x 1100
=
0.00 gram
=
0.00 gram
= 198.61 gram
= 280.16 gram
= 116.46 gram
=
61.55 gram
=
14.91 gram
=
34.61 gram
=
25.54 gram
=
6.20 gram

= 738.045 gram

= ( 100%
100% ) x
100.00% ) x
73.09% ) x
35.13% ) x
19.35% ) x
11.01% ) x
8.99% ) x
4.30% ) x
0.84% ) x
0.00% ) x

- 5.5%
155.925
155.925
155.925
155.925
155.925
155.925
155.925
155.925
155.925
155.925

) x 15% x 1100
=
0.00 gram
=
0.00 gram
=
0.00 gram
=
0.00 gram
=
34.35 gram
=
48.59 gram
=
25.51 gram
=
31.89 gram
=
1.72 gram
=
13.88 gram

= 155.925 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
77.97% ) x
46.81% ) x
30.45% ) x
10.00% ) x
8.90% ) x
0.00% ) x

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
88.43% ) x
53.87% ) x

- 5.5% ) x 14% x 1100


145.53 =
0.00 gram
145.53 =
0.00 gram
145.53 =
0.00 gram
145.53 =
0.00 gram
145.53 =
16.84 gram
145.53 =
50.30 gram

145.53 gram

no. 50
no. 100
no. 200
PAN

=
=
=
=

(
(
(
(

53.87%
40.94%
22.40%
19.96%

40.94%
22.40%
19.96%
0.00%

)
)
)
)

145.53
145.53
145.53
145.53

x
x
x
x

=
=
=
=

18.82
26.98
3.55
29.05

gram
gram
gram
gram

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

Kadar aspal

6.0%

b Material Chipping
3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100.00%
no. 4
= (
73.09%
no. 8
= (
35.13%
no. 30 = (
19.35%
no. 50 = (
11.01%
no. 100 = (
8.99%
no. 200 = (
4.30%
PAN
= (
0.84%
b Material Pasir
3/4"
= (
1/2"
= (
3/8"
= (
no. 4
= (
no. 8
= (
no. 30 = (
no. 50 = (
no. 100 = (
no. 200 = (
PAN
= (

100%
100%
100%
100%
100%
77.97%
46.81%
30.45%
10.00%
8.90%

b Material Debu Batu


3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100%
no. 4
= ( 100%

= ( 100% - 6.0% ) x 71% x 1100


0.00 gram
- 100% ) x 734.14 =
0.00 gram
- 100.00% ) x 734.14 =
- 73.09% ) x 734.14 = 197.56 gram
- 35.13% ) x 734.14 = 278.68 gram
- 19.35% ) x 734.14 = 115.85 gram
61.23 gram
- 11.01% ) x 734.14 =
8.99% ) x 734.14 =
14.83 gram
4.30% ) x 734.14 =
34.43 gram
0.84% ) x 734.14 =
25.40 gram
0.00% ) x 734.14 =
6.17 gram
-

734.14 gram

- 6.0% ) x 15% x 1100


155.1 =
0.00 gram
155.1 =
0.00 gram
155.1 =
0.00 gram
155.1 =
0.00 gram
155.1 =
34.17 gram
155.1 =
48.33 gram
155.1 =
25.37 gram
155.1 =
31.72 gram
155.1 =
1.71 gram
155.1 =
13.80 gram

155.1 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
77.97% ) x
46.81% ) x
30.45% ) x
10.00% ) x
8.90% ) x
0.00% ) x

- 6.0% ) x 14% x 1100


144.76 =
0.00 gram
144.76 =
0.00 gram
144.76 =
0.00 gram
144.76 =
0.00 gram

144.76 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x

no. 8
no. 30
no. 50
no. 100
no. 200
PAN

=
=
=
=
=
=

(
(
(
(
(
(

100%
88.43%
53.87%
40.94%
22.40%
19.96%

88.43%
53.87%
40.94%
22.40%
19.96%
0.00%

)
)
)
)
)
)

144.76
144.76
144.76
144.76
144.76
144.76

x
x
x
x
x
x

=
=
=
=
=
=

16.75
50.03
18.72
26.84
3.53
28.89

gram
gram
gram
gram
gram
gram

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

Kadar aspal

6.5%

b Material Chipping
3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100.00%
no. 4
= (
73.09%
no. 8
= (
35.13%
no. 30 = (
19.35%
no. 50 = (
11.01%
no. 100 = (
8.99%
no. 200 = (
4.30%
PAN
= (
0.84%
b Material Pasir
3/4"
= (
1/2"
= (
3/8"
= (
no. 4
= (
no. 8
= (
no. 30 = (
no. 50 = (
no. 100 = (
no. 200 = (
PAN
= (

100%
100%
100%
100%
100%
77.97%
46.81%
30.45%
10.00%
8.90%

b Material Debu Batu


3/4"
= ( 100%
1/2"
= ( 100%

- 6.5%
730.235
730.235
730.235
730.235
730.235
730.235
730.235
730.235
730.235
730.235

) x 71% x 1100
=
0.00 gram
=
0.00 gram
= 196.51 gram
= 277.20 gram
= 115.23 gram
=
60.90 gram
=
14.75 gram
=
34.25 gram
=
25.27 gram
=
6.13 gram

= 730.235 gram

= ( 100%
100% ) x
100.00% ) x
73.09% ) x
35.13% ) x
19.35% ) x
11.01% ) x
8.99% ) x
4.30% ) x
0.84% ) x
0.00% ) x
= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
77.97% ) x
46.81% ) x
30.45% ) x
10.00% ) x
8.90% ) x
0.00% ) x

- 6.5%
154.275
154.275
154.275
154.275
154.275
154.275
154.275
154.275
154.275
154.275

) x 15% x 1100
=
0.00 gram
=
0.00 gram
=
0.00 gram
=
0.00 gram
=
33.99 gram
=
48.07 gram
=
25.24 gram
=
31.55 gram
=
1.70 gram
=
13.73 gram

= 154.275 gram

= ( 100% - 6.5% ) x 14% x 1100


0.00 gram
- 100% ) x 143.99 =
0.00 gram
- 100% ) x 143.99 =

143.99 gram

3/8"
no. 4
no. 8
no. 30
no. 50
no. 100
no. 200
PAN

=
=
=
=
=
=
=
=

(
(
(
(
(
(
(
(

100%
100%
100%
88.43%
53.87%
40.94%
22.40%
19.96%

100%
100%
88.43%
53.87%
40.94%
22.40%
19.96%
0.00%

)
)
)
)
)
)
)
)

143.99
143.99
143.99
143.99
143.99
143.99
143.99
143.99

x
x
x
x
x
x
x
x

=
=
=
=
=
=
=
=

0.00
0.00
16.66
49.76
18.62
26.70
3.51
28.74

gram
gram
gram
gram
gram
gram
gram
gram

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

Kadar aspal

7.0%

b Material Chipping
3/4"
= ( 100%
1/2"
= ( 100%
3/8"
= ( 100.00%
no. 4
= (
73.09%
no. 8
= (
35.13%
no. 30 = (
19.35%
no. 50 = (
11.01%
no. 100 = (
8.99%
no. 200 = (
4.30%
PAN
= (
0.84%
b Material Pasir
3/4"
= (
1/2"
= (
3/8"
= (
no. 4
= (
no. 8
= (
no. 30 = (
no. 50 = (
no. 100 = (
no. 200 = (
PAN
= (

100%
100%
100%
100%
100%
77.97%
46.81%
30.45%
10.00%
8.90%

b Material Debu Batu

- 7.0% ) x 71% x 1100


726.33 =
0.00 gram
726.33 =
0.00 gram
726.33 = 195.46 gram
726.33 = 275.71 gram
726.33 = 114.61 gram
726.33 =
60.58 gram
726.33 =
14.67 gram
726.33 =
34.06 gram
726.33 =
25.13 gram
726.33 =
6.10 gram

726.33 gram

= ( 100%
100% ) x
100.00% ) x
73.09% ) x
35.13% ) x
19.35% ) x
11.01% ) x
8.99% ) x
4.30% ) x
0.84% ) x
0.00% ) x

- 7.0% ) x 15% x 1100


153.45 =
0.00 gram
153.45 =
0.00 gram
153.45 =
0.00 gram
153.45 =
0.00 gram
153.45 =
33.81 gram
153.45 =
47.82 gram
153.45 =
25.10 gram
153.45 =
31.38 gram
153.45 =
1.69 gram
153.45 =
13.66 gram

153.45 gram

= ( 100%
100% ) x
100% ) x
100% ) x
100% ) x
77.97% ) x
46.81% ) x
30.45% ) x
10.00% ) x
8.90% ) x
0.00% ) x

= ( 100% - 7.0% ) x 14% x 1100

143.22 gram

3/4"
1/2"
3/8"
no. 4
no. 8
no. 30
no. 50
no. 100
no. 200
PAN

=
=
=
=
=
=
=
=
=
=

(
(
(
(
(
(
(
(
(
(

100%
100%
100%
100%
100%
88.43%
53.87%
40.94%
22.40%
19.96%

100%
100%
100%
100%
88.43%
53.87%
40.94%
22.40%
19.96%
0.00%

)
)
)
)
)
)
)
)
)
)

x
x
x
x
x
x
x
x
x
x

143.22
143.22
143.22
143.22
143.22
143.22
143.22
143.22
143.22
143.22

=
=
=
=
=
=
=
=
=
=

0.00
0.00
0.00
0.00
16.57
49.50
18.52
26.55
3.49
28.59

gram
gram
gram
gram
gram
gram
gram
gram
gram
gram

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

KEKUATAN AGREGAT TERHADAP TUMBUKAN


(Agregate Impact Value)

Tanggal

Jurusan

Kelompok

Metode Pengujian :

Berat Sampel

:-

Asisten

Item Pengujian

Teknik Sipil
SNI 03-4426-1997

Berat (gram)
I

II

Berat sampel (A)

500

500

Berat sampel setelah penekanan dan lewat saringan


2,36 mm (B)

45.80

53.30

Berat sampel setelah penekanan dan tertahan saringan


2,36 mm

452.60

331.70

Aggregate Impact Value = ( B/A ) x 100%

9.16%

10.66%

Rata - rata AIV (%)

9.91%

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PENGUJIAN KADAR ASPAL (EKSTRAKSI)

Tanggal

: 31 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII ( Delapan )

Metode Pengujian : SNI 03-6822-2002

Berat Sampel

: 500 gr

Asisten

: Alma Eka Nanda A

Nilai
No.

Uraian Kegiatan Pengujian

Rata-rata

Satuan

Keterangan

116.7

1236.7

Gram

36

38.1

37.05

Gram

2856.7

616.7

1736.7

Gram

500

500

500

Gram

D=C-A

II

2356.7

Kondisi Sebelum Ekstraksi

Berat Wadah

Berat Saringan

Berat Wadah + Sampel

Berat Sampel sebelum Ekstraksi

Kondisi setelah Ekstraksi

Berat Saringan + Material

540.1

41.3

290.7

Gram

Berat Wadah + Material setelah dioven

2306

576

1441

Gram

Berat Sampel setelah Ekstraksi

453.4

462.5

457.95

Gram

Kadar Aspal Sampel

9.32 %

7.5 %

8.4 %

H=100*(D-G)/D

Makassar, 31 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Alma Eka Nanda A)

KELOMPOK VIII(Irwansyah,Clara,Jono,Irsan)

V. ANALISA DATA
1.287
b Contoh Perhitungan untuk contoh I :

q Tera tangkai penunjuk dalam gelas


Skala lumpur
Skala beban pada gelas ukur
q Skala Pasir

=
0.0
= 2857
= 2306

= Skala Beban - Skala Tangkai Penunjuk


= ### - 0.0
= ###

q Nilai Sand Equivalent

Skala Pasir
x ####
Skala Lumpur
2306.0
=
x ####
2856.7
= ### %
=

b Contoh Perhitungan untuk contoh II :

q Tera tangkai penunjuk dalam gelas


Skala lumpur
Skala beban pada gelas ukur
q Skala Pasir

=
0.0
= ####
= ####

= Skala Beban - Skala Tangkai Penunjuk


= ### - 0.0
= ###

q Nilai Sand Equivalent

Skala Pasir
x ####
Skala Lumpur
576.0
=
x ####
616.7
= ### %
=

b Contoh Perhitungan Nilai Rata-Rata

q Rata-Rata Nilai Sand Equivalent

=
=

SE I

SE II

+
2

80.7

93.4

+
2

= 87.06 %
VI. KESIMPULAN :
Diperoleh kadar lumpur pasir =

## %

Memenuhi spesifikasi kadar lumpur pasir yang disyaratkan adalah minimal 50%.

RAKSI)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN SAND EQUIVALENT

Tanggal

Jurusan

Kelompok

: VIII (Delapan)

Metode Pengujian : SNI 03-1992

Berat Sampel

: -

Asisten

No.

Uraian

Tera tinggi tangkai penunjuk ke


1. dalam gelas ukur (gelas dalam
keadaan kosong).
Baca skala lumpur.
(Pembacaan skala permukaan
2.
lumpur dilihat pada dinding gelas
ukur).
Pembacaan skala beban pada
3. gelas ukur (beban dimasukkan
pada gelas keadaan kosong).
4.

Pembacaan skala pasir.


(Pembacaan 3 - Pembacaan 1)

5.

Nilai Sand Equivalent


Skala Pasir (4)
100%
Skala Lumpur (2)

: Teknik Sipil

II

Rata-rata

10.30

10.30

10.30

4.05

4.10

4.08

14.00

14.20

14.10

3.70

3.90

3.80

91.36%

95.12%

93.25%

Makassar, 00 Januari 1900


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN KELEKATAN AGREGAT TERHADAP ASPAL

Tanggal

: 31 Oktober 2007

Jurusan

Kelompok

: VIII ( Delapan )

Metode Pengujian : SNI 03-2439-1991

Berat Sampel

: 100 gr

Asisten

No.
1

: Teknik Sipil

: Santri Wisudawan

% Kelekatan
> 95

< 95

> 95

> 95

> 95

< 95

< 95

> 95

> 95

10

< 95

Rata-rata

> 95

Makassar, 31 Oktober 2007


Diperiksa oleh :
Asisten Laboratorium

(Santri Wisudawan)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

REKAPITULASI
DATA PEMERIKSAAN AGREGAT
Tanggal

: 11 Agustus 2006

Jurusan

: Teknik Sipil

Kelompok

: IV (Empat)

Universitas

: Hasanuddin

Berat Contoh

: -

Asisten

: Imran Majid

Pemeriksaan

Benda Uji

Spesifikasi
Min
Max

Satuan

1. Berat Jenis
- Chipping
- Pasir
- Debu Batu

2.623
2.813
2.609

2.5
2.5
2.5

2. Penyerapan Air
- Chipping
- Pasir
- Debu Batu

2.623
2.449
2.712

3
3
3

%
%
%

3. Indeks Kepipihan

7.24

25

4. Indeks Kelonjongan

22.49

25

5. Keausan Agregat

15.93

40

6. Kadar Lumpur

0.93

50

7. Kelekatan Agregat

95.00

95

Makassar,
11 Agustus 2006
Diperiksa oleh :
Asisten Laboratorium

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
BERAT JENIS DAN PENYERAPAN AGREGAT KASAR
#REF!
PEMERIKSA :

Pembukaan

Perendaman

Penimbangan

Pengeringan

Penimbangan

Pengovenan

Pendinginan

Penimbangan

#REF!
#REF!
#REF!
#REF!
#REF!
Contoh disaring
Mulai Jam
Selesai Jam
Contoh direndam
Mulai Jam
Selesai Jam
Contoh ditimbang dalam air
Mulai Jam
Selesai Jam
Contoh dilap
Mulai Jam
Selesai Jam
Contoh ditimbang (SSD)
Mulai Jam
Selesai Jam
Contoh dipanaskan
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu kamar
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
13.10
14.00
14.00
10.00
10.00
10.15
10.15
10.45
10.45
11.00
11.00
14.00
14.00
15.00
15.00
15.15

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
KADAR LUMPUR
#REF!
PEMERIKSA :

#REF!
#REF!
#REF!
#REF!
#REF!

Contoh disaring
Pembukaan
Mulai Jam
Selesai Jam
Contoh dimasukkan ke tabung SE
Pengendapan
Mulai Jam
Selesai Jam
Contoh diguncang satu arah
Pengguncangan Mulai Jam
Selesai Jam
Contoh didiamkan
Pendiaman
Mulai Jam
Selesai Jam
Contoh diukur
Pemeriksaan
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
11.30
11.35
11.35
11.45
11.45
11.50
11.50
12.10
12.10
12.15

GAT KASAR

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
BERAT JENIS DAN PENYERAPAN AGREGAT HALUS
#REF!
PEMERIKSA :

Pembukaan

Perendaman

Pengeringan

Penimbangan

Perendaman

Penimbangan

Pengeringan

Pendinginan

Penimbangan

#REF!
#REF!
#REF!
#REF!
#REF!
Contoh disaring
Mulai Jam
Selesai Jam
Contoh direndam pd suhu ruang
Mulai Jam
Selesai Jam
Contoh dikeringkan diudara terbuka
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam
Piknometer direndam
Mulai Jam
Selesai Jam
Piknometer + Contoh + Air ditimbang
Mulai Jam
Selesai Jam
Contoh dipanaskan diwajan
Mulai Jam
Selesai Jam
Contoh didinginkan
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
13.10
14.00
14.00
10.00
10.00
10.30
10.30
10.35
10.00
11.00
11.00
11.20
11.20
11.40
11.40
11.45
11.45
12.00

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
KELEKATAN AGREGAT TERHADAP ASPAL
0
PEMERIKSA :

Pembukaan

Pengovenan

Pendinginan

Pencampuran

Perendaman

Pemeriksaan

#REF!
#REF!
#REF!
#REF!
#REF!
Contoh disaring
Mulai Jam
Selesai Jam
Contoh dipanaskan
Mulai Jam
Selesai Jam
Contoh didinginkan
Mulai Jam
Selesai Jam
Contoh diaduk dgn aspal cair
Mulai Jam
Selesai Jam
Contoh direndam
Mulai Jam
Selesai Jam
Contoh diperiksa
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
12.25
12.30
12.30
15.30
15.30
15.50
15.50
16.00
16.00
10.00
10.00
10.15

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
INDEKS KEPIPIHAN

EGAT HALUS

#REF!
PEMERIKSA :

Pembacaan Waktu
13.10
14.00

Pembukaan

14.00
10.00

Pemeriksaan

10.00
10.30

Penimbangan

10.30
10.35
10.00
11.00
11.00
11.20
11.20
11.40
11.40
11.45
11.45
12.00

#REF!
#REF!
#REF!
#REF!
#REF!
Contoh disaring
Mulai Jam
Selesai Jam
Contoh ditest dengan thickness gauge
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
10.00
10.15
10.15
10.45
10.45
11.00

P ASPAL

Pembacaan Waktu
12.25
12.30
12.30
15.30
15.30
15.50
15.50
16.00
16.00
10.00
10.00
10.15

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
KEAUSAN AGREGAT
#REF!
PEMERIKSA :

Pembacaan Waktu
10.00
10.15

Pembukaan

10.15
10.45

Pemeriksaan

10.45
11.00

Penyaringan

Penimbangan

#REF!
#REF!
#REF!
#REF!
#REF!
Contoh disaring
Mulai Jam
Selesai Jam
Contoh dimasukkan ke dlm alat L.A.
Mulai Jam
Selesai Jam
Contoh disaring dgn saringan no. 12
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
11.00
11.30
11.30
11.45
11.45
12.00
12.00
12.15

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
ANALISA SARINGAN
13 OKTOBER 2004
PEMERIKSA :

Pembacaan Waktu
11.00
11.30
11.30
11.45
11.45
12.00
12.00
12.15

#REF!
#REF!
#REF!
#REF!
#REF!

Contoh disaring
Pembukaan
Mulai Jam
Selesai Jam
Contoh diguncang dgn shieve shaker
Pengguncangan Mulai Jam
Selesai Jam
Contoh ditimbang
Penimbangan
Mulai Jam
Selesai Jam

#REF!
#REF!
#REF!
#REF!
#REF!
Pembacaan Waktu
11.10
11.45
11.45
12.30
12.30
13.00

AN
N

Pembacaan Waktu
11.10
11.45
11.45
12.30
12.30
13.00

Laboratorium Jalan Raya dan Aspal


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN PENETRASI ASPAL SEBELUM KEHILANGAN BERAT


(Penetration Of Bituminous Materials)

Tanggal

: 30 Oktober 2008

Jurusan

Kelompok

: VIII (Delapan)

Metode Pengujian : SNI 06-2456-1991

Berat Sampel

: -

Asisten

Penetrasi Aspal

: Teknik Sipil

: Sri Rezky Nindar

No. Sampel

Penurunan 5 detik

II

II

72.00

76.00

74.00

69.00

71.00

70.00

71.00

74.00

75.50

79.00

72.00

75.50

58.20

58.60

59.00

Rata-rata
58.60
* Penetrasi 60

Makassar, 30 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sri Rezky Nindar)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN PENETRASI ASPAL SETELAH KEHILANGAN BERAT


(Penetration Of Bituminous Materials)

Tanggal

: 30 Oktober 2008

Jurusan

Kelompok

: VIII (Delapan)

Metode Pengujian : SNI 06-2456-1991

Berat Sampel

: -

Asisten

Penetrasi Aspal

: Teknik Sipil

: Sri Rezky Nindar

No. Sampel

Penurunan 5 detik

II

II

82.00

82.00

82.00

73.00

75.00

74.00

77.00

75.00

76.00

65.00

49.00

57.00

59.40

68.20

57.80

Rata-rata
61.80

* Penetrasi 60

Makassar, 30 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sri Rezky Nindar)

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PENURUNAN BERAT ASPAL

Tanggal

: 30 Oktober 2008

Jurusan

Kelompok

: VIII (Delapan)

Metode Pengujian : SNI 06-2440-1991

Berat Sampel

: -

Asisten

: Teknik Sipil

: Sri Rezky Nindar

(gram)

(gram)

9.20

65.40

56.20

65.30

56.10

0.10

0.18

9.00

66.20

57.20

66.10

57.10

0.10

0.17

No. Sampel
(gram) (gram) (gram) (gram)

Rata - rata

(%)

0.18

* Penetrasi 80

Keterangan :
A =
B =
C =
=
E =
=

Berat Tinbox
Berat Tinbox + Aspal sebelum dioven
Berat Aspal sebelum dioven
B-A
Berat Aspal setelah dioven
D-A

F =
=
G =
=

Jumlah Penurunan Berat


C-E
% penurunan berat aspal
F
x 100%
C

Makassar, 30 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sri Rezky Nindar)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN BERAT JENIS ASPAL


(Specific Gravity Of Asphalt)

Tanggal

: 28 Oktober 2008

Jurusan

Kelompok

: VIII ( Delapan )

Metode Pengujian : SNI 06-2441-1991

Berat Sampel : -

: Teknik Sipil

Asisten

: Sul Munawir

No.
Sampel

A
(gr)

B
(gr)

C
(gr)

D
(gr)

Bj
(gr/cc)

37.3

103.00

86.10

104.10

1.02

40.10

97.80

91.50

107.40

1.23

40.10

98.15

91.10

106.00

1.18

Makassar,28 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Sul Munawir)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN TITIK LEMBEK ASPAL


( Softening Point of Asphalt with Ring and Ball Test )

Tanggal

: 30 Oktober 2008

Jurusan

Kelompok

: VIII ( Delapan )

Metode Pengujian : SNI 06-2435-1991

Berat Sampel

: -

Asisten

No.
1
2
3
4
5
6
7
8
9
10

Suhu Bola Jatuh ( oC )


I
II
5

10

10

15

15

20

20

25

25

30

30

35

35

40

40

45
48 *

45
48 *
o

Titik Lembek ( C)
o
Titik Lembek rata-rata( C)

: Teknik Sipil

: Santri Wisudawan

Waktu ( Detik )
I
00

00

00

00

00

00

00

00

00
00

o
o

II
00 ' 00 "
02 ' 40 "
05 ' 57 "
11 ' 30 "
13 ' 33 "
15 ' 42 "
17 ' 19 "
19 ' 38 "
22 ' 05 "
22 ' 39 "

48

00

00 ' 00 "

00

02 ' 46 "

00

05 ' 57 "

00

11 ' 30 "

00

13 ' 33 "

00

15 ' 42 "

00

17 ' 19 "

00

19 ' 38 "

00
00

22 ' 05 "
22 ' 40 "

48
48

Ket. * = Titik Lembak

Makassar,30 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

( Santri Wisudawan )

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN TITIK NYALA DAN TITIK BAKAR ASPAL


(Flash and Fair Point)

Tanggal

: 30 Oktober 2008

Jurusan

Kelompok

: VIII ( Delapan )

Metode Pengujian : SNI 06-2433-1991

Berat sampel

: -

Asisten

Suhu ( oC )

No.
I

: Teknik Sipil

: Santri Wisudawan

Waktu (Detik)
II

II

200

200

00

210

210

00

00

01

'

30 "

00

01

'

30

"

01

'

53 "

00

01

'

53

"

00

02

'

20

"

220

220

00

'

00 "

00

'

22 "

00

'

53 "

00

00

'

00

"

00

00

'

22

"

00

00

'

53

"

230

230

00

240

240

00

00

02

'

49 "

00

02

'

49

"

03

'

15 "

00

03

'

15

"

00

03

'

29

"

250

250

02

'

20 "

260

260

00

270 *

270

00

00

03

'

43 "

00

03

'

43

"

04

'

12 "

00

04

'

12

"

00
00

05
06

'
'

45
55

"
"

280

280

10

290

290 *

00

11

300

300

00

00
00

12
13

310
320 **

310
320 **

03

04
05

'

'
'

29 "

49 "
20 "

Keterangan:
* = Titik nyala
** = Titik bakar

Makassar, 30 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Santri Wisudawan)

KELOMPOK VIII (Irwansyah,Clara,Jono,Irsan)

#REF!
#REF!
#REF!
#REF!
9
#REF!
#REF!
#REF!
8
#REF!
#REF!
#REF!
7
#REF!
0

Waktu (menit)

#REF!
6
#REF!
#REF!
#REF!
5
#REF!
0

#REF!
4

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!

200
210
220
230
240
250
260
270
280
290
300
310
#REF!
#REF!
#REF!

0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
#REF!
#REF!
#REF!

#REF!
#REF!
Grafik
Titik
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!

#REF!
0.00
#REF!
Nyala dan0.00
Titik
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.01
#REF!
0.01
#REF!
0.01
#REF!
0.01
#REF!
0.01
#REF!
0.01
0.00
0.01
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!

Bakar Aspal
Tb 1,2

Tn 2

Tn 1

0
200

210

220

230

240

250

260

270

280

290

Suhu (0C)

Keterangan :

Tn = Titik nyala

o
Tn1 = 00 3' 36"

Tb = Titik bakar

o
Tn2 = 00 4' 50"

o
Tb1 = 00 8' 47"
o
Tb2 = 00 8' 47"

300

310

320

0.00
2.67
14
5.95
11.50
13.55
15.70
12
17.32
19.63
22.08
10
#VALUE!
22.67

5
10
15
20
25
30
35
40
45
0
0

Waktu (menit)

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Grafik Titik Lembek Aspal

T1

T2

10

15

20

25

Suhu (oC)

Keterangan :

T1 = Titik lembek bola 1

46 C

o
T2 = Titik lembek bola 2 46,50 C

30

35

40

45

50

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

VISCOSITAS BAHAN-BAHAN BITUMEN


(Viscosity of Bituminous Materials)

Tanggal

: 31 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII (Delapan)

Metode

: SNI 06-6441-2000

Berat Sampel

Asisten

: Alma Eka Nanda A

Pembacaan
Suhu
( oC )

Waktu-1
Viscositas
(Detik) Kinetik-1 (cst)

Pengamatan
Waktu-2
Viscositas
(Detik)
Kinetik-2 (cst)

Rata-rata

120

300.16

654.35

305.18

665.29

659.82

140

155.02

337.94

153.76

335.20

336.57

160

53.17

115.91

55.25

120.45

118.18

180

33.16

72.29

30.13

65.68

68.99

Viscositas Kinetik (cst)

Faktor Koreksi

2.18

1000
280
170

100

10
100

120

140
Suhu ('C)

1 142
3 160
9

180

Catatan : Dari hasil grafik di atas dapat disimpulkan :


Untuk pencampuran pada laston diperlukan viskositas kinetik sebesar 170 cst ,
maka dari grafik di atas,diperoleh suhu pencampuran sebesar 142 C .
Untuk pemadatan diperlukan viskositas kinetik sebesar 280 cst,
maka dari grafik di atas,diperoleh suhu pemadatan sebesar 139 C .

Makassar, 31 Oktober 2008


Diperiksa oleh :
Asisten Laboratorium

(Alma Eka Nanda A)

Jangan diprint
Pembaca
an suhu

Rata rata

120
140
160
180

659.8206
336.57
118.1778
68.9861

Viscositas Kinetik (cst)

1000

280

170

100

10
100

120

133.5

140

148.5

Suhu ('C)

160

180

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

DAKTALITAS ASPAL

Tanggal

: 28 Oktober 2008

Jurusan

: Teknik Sipil

Kelompok

: VIII (Delapan)

Metode Pengujian

: SNI 06-2432-1991

Asisten

: Kurniati Sulthan

Berat Sampel : 100 gr

Daktalitas pada 25oC, 5 cm per menit

Daktalitas pada 25oC, 5 cm per


menit

Pengamatan I

107.3

Pengamatan II

110.2

Pengamatan III

103.5

Rata-rata

107.0

Makassar, 28 Oktober 2008


Diperiksa oleh
Asisten Laboratorium

(Kurniati Sulthan)

KELOMPOK VIII

(Irwansyah,Clara,Jono,Irsan)

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PEMERIKSAAN DAKTALITAS BAHAN-BAHAN BITUMEN


Tanggal
Kelompok
Berat Contoh

: 27 September 2007
: I (Satu)
: -

Daktalisasi pada 25oC, 5


cm/menit
Pengamatan I
Pengamatan II
Pengamatan III
Rata - rata

Jurusan
Universitas
Asisten

: Teknik Sipil
: Hasanuddin
: Imran Majid

Pembacaan Pengukuran
Pada Alat
122.000
115.000
104.000
113.667

Makassar, 27 September 2007


Diperiksa oleh :
Asisten Laboratorium

Imran Majid

4.7.4. Diagram penentuan kadar aspal optimum

DIAGRAM PENENTUAN KADAR ASPAL OPTIMUM

Voids Filled (%)


Marshall Stability (kg)
Flow (mm)
Air Voids (%)
VMA
Marshall quatient (kg/mm)
KADAR ASPAL (%)

4.5

KADAR ASPAL OPTIMUM

5.5

==

5.50

+
2

7.00

Gambar 4.4
Diagram Penentuan Kadar Aspal Optimum

6.25

6.2

6.5

Laboratorium Jalan Raya dan Aspal


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
PENETRASI ASPAL SEBELUM KEHILANGAN BERAT
30 Oktober 2008
PEMERIKSA :

Pembukaan

Pendiaman
Pendinginan
(direndam)
Pemeriksaan

IRWANSYAH R
A. IRSAN ISMUNANDAR
Y. JONO TINGKA
CHA. CLARA .M

D 111 05 070
D 111 05 081
D 111 05 108
D 111 05 124

Contoh dipanaskan ( 163 + 1 ) oC


Mulai Jam
Selesai Jam
Contoh didiamkan pd suhu ruang
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu ruang
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu ruang
Mulai Jam
Selesai Jam

Pembacaan Waktu
11.00
11.15
11.15
11.30
11.30
13.00
13.00
13.20

Laboratorium Jalan Raya dan Aspal


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
TITIK NYALA DAN TITIK BAKAR
26 FEBRUARI 2002
PEMERIKSA :

Pembukaan

Pemeriksaan

SERVIN P.
EDDY CHANDRA
SYAMSUL MARLIN
ASRULLAH MUSTAIN
PUJI SETIYONO
Contoh dipanaskan
Mulai Jam
Selesai Jam
Titik nyala & Titik bakar
Mulai Jam
Selesai Jam

D 111 00 100
D 111 00 060
D 111 00 077
D 111 00 135
D 111 97 022
Pembacaan Waktu
11.00
11.15
11.15
11.20

Laboratorium Jalan Raya dan Aspal


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
PENETRASI ASPAL SETELAH KEHILANGAN BERAT
30 Oktober 2008
PEMERIKSA :

Pembukaan

Pendiaman

Pengovenan

Pendinginan

Pemeriksaan

IRWANSYAH R
A. IRSAN ISMUNANDAR
Y. JONO TINGKA
CHA. CLARA .M

D 111 05 070
D 111 05 081
D 111 05 108
D 111 05 124

Contoh dipanaskan ( 163 + 1 ) oC


Mulai Jam
Selesai Jam
Contoh didiamkan pd suhu ruang
Mulai Jam
Selesai Jam
Contoh dioven
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu ruang
Mulai Jam
Selesai Jam
Penetrasi aspal
Mulai Jam
Selesai Jam

Pembacaan Waktu
10.00
10.35
10.35
10.50
10.50
14,00
14.00
15.30
10.20
10.40

Laboratorium Jalan Raya dan Aspal


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
PENURUNAN BERAT ASPAL
30 Oktober 2008
PEMERIKSA :

Pembukaan

Pendiaman

Penimbangan

Pengovenan

Pendinginan

Penimbangan

IRWANSYAH R
A. IRSAN ISMUNANDAR
Y. JONO TINGKA
CHA. CLARA .M

D 111 05 070
D 111 05 081
D 111 05 108
D 111 05 124

Contoh dipanaskan
Mulai Jam
Selesai Jam
Contoh didiamkan pada suhu ruang
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam
Contoh dioven
Mulai Jam
Selesai Jam
Contoh didinginkan pada suhu ruang
Mulai Jam
Selesai Jam
Contoh ditimbang
Mulai Jam
Selesai Jam

Pembacaan Waktu
11.30
11.35
11.35
11.45
11.45
11.50
11.50
12.10
12.10
12.20
12.20
12.25

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
BERAT JENIS ASPAL
28 Oktober 2008
PEMERIKSA :

Pembukaan

Pendiaman
Pendinginan
(direndam)
Pemeriksaan

IRWANSYAH R
A. IRSAN ISMUNANDAR
Y. JONO TINGKA
CHA. CLARA .M

D 111 05 070
D 111 05 081
D 111 05 108
D 111 05 124

Contoh dipanaskan ( 163 + 1 ) oC


Mulai Jam
Selesai Jam
Contoh didiamkan pd suhu ruang
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu ruang
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu ruang
Mulai Jam
Selesai Jam

Pembacaan Waktu
12.00
12.30
12.30
13.00
13.00
13.40
13.40
14.10

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

WAKTU PEMERIKSAAN
TITIK LEMBEK ASPAL
30 Oktober 2008
PEMERIKSA :

Pembukaan

Pendiaman

Pendinginan

Pemeriksaan

IRWANSYAH R
A. IRSAN ISMUNANDAR
Y. JONO TINGKA
CHA. CLARA .M

D 111 05 070
D 111 05 081
D 111 05 108
D 111 05 124

Contoh dipanaskan
Mulai Jam
Selesai Jam
Contoh didiamkan pd suhu ruang
Mulai Jam
Selesai Jam
Contoh didinginkan pd suhu ruang
Mulai Jam
Selesai Jam
Pemeriksaan titik lembek aspal
Mulai Jam
Selesai Jam

Pembacaan Waktu
10.00
10.15
10.30
11.00
11.00
11.05
11.05
11.25

4.7.3. Grafik Marshall


VFB /VFWA ( % ) Min. 68
Grafik VFB / Vs Kadar Aspal
48.00

VFB /VFWA ( % )

47.00
46.00

45.00
44.00
43.00

42.00
41.00
40.00

5.5

6.5

Kadar Aspal (%)

Stabilitas Marshall (kg) Min. 800


Grafik Stabilitas Vs Kadar Aspal
1700

Stabilitas (Kg)

1600

1500
1400
1300
1200
1100

1000

5.5

6.5

6.5

Kadar Aspal (%)

Flow ( mm ) min 2

Flow (mm)

Grafik Flow Vs Kadar Aspal


4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00

5.5

Kadar Aspal (%)

VIM ( % ) 3 - 5

VIM (%)

Grafik VIM Vs Kadar Aspal


15.0
14.9
14.8
14.8
14.7
14.6
14.6
14.5
14.4
14.4
14.3
14.2
14.1
14.1
14.0

5.5

6.5

Kadar Aspal (%)

VMA (%) Minimum 14

VMA (%)

Grafik VMA Vs Kadar Aspal


28.00
27.00
26.00
25.00
24.00
23.00
22.00
21.00
20.00

5.5

6.5

Kadar Aspal (%)

Marshall Quotient (kg/mm) Min. 200

Marshall Quotient (Kg/mm)

Grafik Marshall Quotient Vs Kadar Aspal


800.0
750.0
700.0
650.0
600.0
550.0
500.0
450.0
400.0
350.0
300.0
250.0
200.0

5.5

Kadar Aspal (%)

6.5

Gambar IV - 3
Grafik Marshall

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

REKAPITULASI
DATA PEMERIKSAAN ASPAL
PEMERIKSA : SYAHLENDRA SYAHRUL
DWI ASRIANDY
DEWI ARYATI
ASRIADI ADRI

Pemeriksaan

D 111 05 043
D 111 05 083
D 111 05 092
D 111 05 143

Benda Uji
Min
Max

Spesifikasi Pen. 60
Min
Max

Satuan

1. Penetrasi
- Sebelum kehilangan
- Setelah kehilangan

78.46
79.62

81.94
89.44

69
54

79
-

0,1 mm
% semula

2. Penurunan berat aspal

0.22

0.46

0.6

% berat

gr/cc

46

54

3. Berat jenis aspal


4. Titik lembek aspal

1.024
48.79

50.21

5. Titik nyala

290.00

225

6. Titik bakar

315.00

225

Mengetahui,
Ka Lab. Aspal dan Jalan
u.b. Sekretaris

Makassar, 29 November 2008


Diperiksa oleh :
Asisten Laboratorium

(SUL MUNAWIR)
NIP.

C
C

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

REKAPITULASI
DATA MIX DESIGN
PEMERIKSA : #REF!
#REF!
#REF!
#REF!

Percobaan

#REF!
#REF!
#REF!
#REF!

Hasil

Analisa Saringan Agregat Kasar dan Halus


b Chipping

60%

b Pasir

22%

b Debu Batu

18%

Kapasitas Mould

1100

Berat Campuran
b Aspal

(gr)

49.50

b Chipping

(gr)

630.30

b Pasir

(gr)

231.11

b Debu Batu (gr)


Berat Jenis Gabungan Agregat

189.09

b Campuran Kering
b Campuran Semu

2.54
2.70

b Campuran Efektif
b Penyerapan

2.62
1.24

Di udara
( in air )
C

Berat (Gram)
Stabilitas - Kg
Dlm air K.permukaan Pembacaaan
Stabilty
( in water )
(SSD)
D
E
N

Kelelehan
mm
Flow
Q

Quotient
Marshall
(Kg/mm)
R

2.30
2.10
2.200
2.10
2.20
2.150
2.50
2.30
2.400
2.30
2.70
2.500

1333.99
989.00
1161.49
575.87
992.71
784.29
735.00
740.97
737.99
768.08
548.07
658.08

Angka kalibrasi

Kadar Aspal

% Berat
Total
Campuran
5.5
5.5

907.00
905.00

6.0
6.0

912.00
918.00

6.5
6.5

965.00
954.00

7
7

1015.63
1040.94

603
602
Rata - Rata
607
610
Rata - Rata
632
634
Rata - Rata
657
643
Rata - Rata

945.00
940.00

3068.18
2076.90

1001.00
987.00

1209.33
2183.96

1023.44
1025.50

1837.50
1704.24

1045.98
1046.08

1766.59
1479.78

Laboratorium Rekayasa Tranportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

Berat Jenis Gabungan Agregat dan Penyerapan Agregat


Bulk (Dry) Bulk (SSD)
A
B
( 59% )
2.915
2.970
( 11% )
2.600
2.665
( 30% )
2.575
2.655

Berat Jenis Agregat


Chipping
Pasir
Debu Batu

Apparent
C
3.080
2.770
2.760

Berat Jenis Gabungan Agregat


b Berat jenis campuran kering
Total Persen Agregat
=
% Cp
% Ps
% DB
+
+
BJdry Cp
BJdry Ps
BJdry DB
100
=
59%
11%
30%
+
+
2.915
2.600
2.575
= 2.768 gr/cc
b Berat jenis campuran semu
Total Persen Agregat
=
% Cp
% Ps
% DB
+
+
BJSemu Cp
BJSemu Ps
BJSemu DB
100
=
59%
11%
30%
+
+
3.080
2.770
2.760
= 2.941 gr/cc
b Berat jenis campuran effektif
Bj Campuran Kering + BJ Campuran Semu
=
2
2.76844 + 2.941
=
2
= 2.855 gr/cc
b Penyerapan
Bj camp. eff - Bj camp. dry
=
x Bj Aspal
Bj camp. eff x Bj camp. dry
2.855 - 2.768
=
x 1.221 x 100%
2.855 x 2.768
= 1.337 %

x 100%

Absorpsi
D
1.815
2.315
2.900

Tabel

Data hot mix design metode marshall

DATA HOT MIX DESIGN METODE MARSHALL


Tipe Perkerasan
Jenis Campuran
Berat Jenis Aspal (T)
Bj.Bulk Total Agregat (U)
Bj.Eff Total Agregat (V)
Penyerapan Aspal (W)

=
=
=
=
=
=

Aspal Beton
AC
1.221
2.768
2.855
1.337
%

Berat (Gram)
Kadar Aspal

Di udara

dlm air

Dikerjakan : Kelompok XIX


Tanggal
: November 2009 -

Volume

K.permukaan Benda Uji

Bj. Bulk

Bj. Maksimum

Campuran

Campuran

(in air)

(in water)

(SSD)

cm3

% Berat
Total
Campuran

B
% Eff. Berat
Tot. Campuran
(100 x A)
(100 - A)

E-D

C
F

5.0

3.48

907.00

5.0

3.48

905.00

Agregat

Camp.Agr (%)

Aspal (%)

VIM

VMA

VFWA

100 x G
I

(100- A)G
U

100-J

100-K

(AxG)
x100
T
( A x G) + L

Unit Weight

912.00

5.82

918.00

6.0

4.38

965.00

6.0

4.38

954.00

6.95

1015.63

6.5

6.95

1040.94

Flow

(Kg/mm)

Angka Kalibrasi

Marshall

342.00

2.65

2.68

99.11

91.01

0.89

8.99

92.41

1001

2.50

1227.27

3068.18

2.30

602.00

940.00

338.00

2.68

2.68

100.06

91.88

-0.06

8.12

100.55

945

1.79

1160.28

2076.90

2.10

989.00

99.58

91.44

0.42

8.56

96.48

2572.54

2.20

1161.49

100
100-A
V

607.00

2.66

Q
S

1333.99

1001.00

394.00

2.31

2.66

87.04

79.01

12.96

20.99

44.59

986

1.00

1209.33

1209.33

2.10

575.87

610.00
987.00
Rata - Rata

377.00

2.44

2.66

91.57

83.12

8.43

16.88

56.54

995

1.79

1220.09

2183.96

2.20

992.71

89.31

81.07

10.69

18.93

50.57

1696.65

2.15

784.29

2.37

632.00

1023.44

391.44

2.47

2.65

93.03

83.71

6.97

16.29

63.47

1020

1.47

1250.00

1837.50

2.50

735.00

634.00

1025.50

391.50

2.44

2.64

92.21

82.74

7.79

17.26

60.57

1000

1.39

1226.07

1704.24

2.30

740.97

657.00

1045.98

388.98

2.45
2.61

2.63

92.62
99.41

83.22
88.18

7.38
0.59

16.78
11.82

62.02
95.93

1038

1.39

1270.93

1770.87
1766.59

2.40
2.30

737.99
768.08

643.00

1046.08

403.08

2.58

2.63

98.32

87.22

1.68

12.78

89.13

865

1.39

1064.59

1479.78

2.70

548.07

98.87

87.70

1.13

12.30

92.53

1623.19

2.50

658.08

Rata - Rata
6.5

Quotient

mm

945.00

Rata - Rata
5.82

Stabilty
O

Kelelehan

603.00

A +
T

5.5

Disesuaikan

Angka korelasi volume


benda uji (P)
x Angka kalibrasi (Q)

5.5

Dibaca

Angka Korelasi

Stabilitas - Kg

Rongga Dalam Rongga Terisi

Rongga Udara

Arlolji Stabilitas

% Total Volume
Eff. Aspal

November 2009

Rata - Rata

2.60

Ket : R = Korelasi volume benda uji x Angka kalibrasi

Diperisa Oleh:
Asisten Laboratorium

NURUL TRIZANIWATI

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin
Grafik 4 - 6 Hot mix design metode marshall

VIM vs Kadar Aspal (3 - 5%)

Stabilitas vs Kadar Aspal (Min. 800 kg)

10.00

2000
1900

9.00

1800

8.00

1700
1600
Stabilitas (Kg)

VIM (%)

7.00
6.00
5.00

1500
1400
1300
1200

4.00

1100
1000

3.00

900
2.00

5.0

5.5

6.0

800

6.5

5.0

5.5

Kadar Aspal (%)

6.0

6.5

Kadar Aspal (%)

Flow vs Kadar Aspal (Min. 2 mm)

VMA vs Kadar Aspal (Min. 14%)

20

3.5

19
18
17
VMA (%)

Flow (mm)

3.0

2.5

16
15
14
13
12

2.0
5.0

5.5

6.0

5.0

6.5

5.5

Kadar Aspal (%)

6.0

6.5

Kadar Aspal (%)

Marshall Quotient vs Kadar Aspal (Min. 200kg/mm)

VFB vs Kadar Aspal (Min. 68%)


90
800

700
Marshall Quotient (Kg/mm)

80

VFB (%)

600
70

500

400

60

300
50
5.0

5.5

6.0

Kadar aspal (%)

6.5

200

5.0

5.5

Kadar Aspal (%)6.0

6.5

Laboratorium Rekayasa Transportasi


Jurusan Sipil Fakultas Teknik
Universitas Hasanuddin

PENENTUAN KADAR ASPAL OPTIMUM

VIM (%)
VFB (%)
Marshall stability (kg)
Flow (mm)
Marshall quatient (kg/mm)
VMA
5.3

KADAR ASPAL (%)

KADAR ASPAL OPTIMUM =

6.3

5.5

5.3

+
2

6.30

6.5

5.80

You might also like