Sub: - Housekeeping round taken by SLSC Members S. No. Name Design. 1 M.K.

AGRAWAL ASCE 2 K K SHARMA Field Engineer 3 R C NAGAR Field Engineer 4 JASVINDER SINGH Field Engineer 5. C S MEENA Supervisor 6. K C LODHA Permit operator 7. D D SHARMA RB Operator 8. SARWAN KUMAR RB Operator AREA: - RB-2 All accessible area 2. SLSC visited above area from housekeeping & safety point of view & following observation taken:S. No Observations Location Concerned agency Remarks 1. Number of hose sections place in and above operation box in improper way . RB-2 1188 EL OP Done 2. Light water spread on floor in passage towards MAL. RB-2 1188 EL SMU Informed 3 Operation Elmira improperly arranged. PCV tubes placed in uncoiled condi tion. Various fitting and protective equipments misplaced. To be arranged proper ly. RB-2 1188 EL OP Done 4 Scaffolding material is lying on floor near process water strainer. To b e shifted to designated place. RB-2 1188 EL MHU Informed 5. Some spare valves and pipes are placed near space in front of lift. To b e shifted to designated place OR area to be marked appropriately. RB-2 1188 EL MMU Informed 6. Two no. of filled drum one near MIA-112 drain point and one near NPRC dr ain point placed. RB-2 1188 EL OP/HWM Done 7. Some hand gloves, head covers and air lines are lying on floor. RB-2 1188 EL, 1200EL SMU Informed 8. One ladder placed near E/S HXs. To be shifted at specified place. RB-2 1200EL OP Done 9. Some sections of hoses are lying on floor. RB-2 1120 EL, 1225EL OP Done

10. Light water is spreading on floor and it is not draining through near by floor drain point. Suspected chocking of floor drains. RB-2 1200EL SMU Inform

K. K. Sharma (Reactor Engineer) M.K.Agrawal (ASCE C Crew) Through: Distribution : MS/ SMEs : OS, SOE : Head (F&IS) SCE C Crew

You might also like