Professional Documents
Culture Documents
Class Problem - Well - 1 Part 3
Class Problem - Well - 1 Part 3
2 Preliminary Design
Well History
The Canadian Gas Well No. 2 is a new producing well in an existing major gas field. The field has been under production for many years through perforations in the main sand (1983 1989 m TVD in this well). The objective is to design and place the optimum fracture stimulation on this well to maximize both the initial potential and profitability of this new well. The field is currently developed on 0.64 km2 spacing (160 acre), thus, the drainage radius for the well is about 402 m. In addition, an un-stimulated well with no skin damage (s=0) makes an average of 250 mscfpd unstimulated.
A) Please provide me data in the form of an electronic copy of your answers to the following questions (1) Post Frac Folds of Increase Estimate, (2) Post Frac Production Rate Estimate, (3) STIMPLAN production profiles (rate and cumulative versus time) plots. Note, each file sent should include your MS&T ID as part of the file name (will cost you points if you dont do this) and recognize that this is an individual project.
Page 1 of 1