Professional Documents
Culture Documents
Volume3 Section6 Wandsworth
Volume3 Section6 Wandsworth
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Barn Elms
Key:
Local authority boundary
Order limits
Tunnel
Shaft
Main tunnel
Putney Bridge
b a n k L m o w e e n r t R i c h m o n d R o a d
E m
P ut ne y
B rd i ge
100m
100m
Pu t n e y
Hi g h
P u t n e y B r i d g e
FOR INFORMATION
R o a d
Location
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
P u t n e y P i e r
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. North Elev.
T h e
A u t h o r i s e d c h a n n e l
Key:
Limits of land to be acquired or used (LLAU) Authorised channel
E m
e n t
B rd i ge
b a n k m
+ 105.40m
Existing levels (shown in metres above tunnel datum) Listed buildings/structures Approximate position of CSO outlet Existing trees within surveyed area
P ut ne y
Notes :
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on
+ 105.45m Cobbled slipway with vertical timber fenders to river edge + 105.51m Retaining wall
A u t h o r i s e d c h a n n e l
the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
K e n i l w o r t h C o u r t
L o w e r R i c h m o n d R o a d
a t e r m a n s G r e e n
M e a n l o w
+ 108.32m
w a t e r
R hm c i d on M s on i s an
10m
40m
FOR INFORMATION
St. Marys Church Location
em i a rS te r e t
Pu te n y H
N
M a en o L wW a r t e
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
Thames Path
This drawing
Dolphin
Authorised channel
MOP
Putney Pier
(floating)
Th e Du k e ( PH sH
e a d
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
S h i n g l e
MOP Dolphin
Key:
Limits of land to be acquired or used (LLAU) Existing public right of way Footway to be temporarily stopped up for construction of shaft, valve chamber and other works Route of temporary diversion of right of way
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
S t a G r a n a d r t e r (
L W
B rd i ge
TH AM ES PL AC E
BP
r
U nv M i r a es n s i int o y s
1 4 t o 2 7
S TR
Lc ok yr eH os ue 1t o7 5
A TE R M
E E T
A N
K e C ni w ou l o r rh t t
12 2
El Sub Sta
10 1
t o
PH
Kenilworth Court
GA YS TR EE T
1 8
1 2
1 0
ou r t
1 4
1 6
ou nt C
1 0
Po ss t
16
1 8
1 0
2 0
CL OS E
ST RE ET
t br i g o 12 d e Ho 18 us e
ST RE ET
2, 02 2
R E E IG M KN S
2 6
TN EY HI GH
EI MA R
2 8
Ca m
3 1 t o 5 4
t o
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
3 1
1 2 a
3 2
3 3
1 t o 1 2
H Ga ) r t e
P ut ne y
3 5
LB
3 5 a
2 7
3 7
P H )
S t a r a n ( P d
Ap Ac
BP
E M
Public slipway to be temporarily stopped up for construction of connection culvert and other works
B A N K M
E N T
MOP
S h i n g l e
R i v e r T h a m e s
Notes:
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites
Ap
Posts
are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.
Ac
5o 0 2 t3
LB
1 t o 2 4
L O W
Shelter
E R
Extent of area of footway and carriageway to be temporarily stopped for construction of duct(s)
5 5 t o 7 8
R I C H M O N D
H a r d
79 t o 10 0
Fn
R O A D
PC Shelter
R c M ih a m n s o i n o d n s
Extent of area of footway and carriageway to be temporarily stopped up for construction of ventilation column(s)
10m
40m
Thames Path
FOR APPROVAL
PH
St Marys Church
M e a n H ih g W R i a v t e e r r s i d e W a l k
Slipway
Location
1t o 2 1
27 19 13
Church Square
1 to 67 Shelter
LB
t o
S a n d
S h i n g l e
e s u o H t a o B e
m t
r e t s n i
H W
S h i n g l e
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
e r t b b u l a r C C t h a c i o B w s e ue l g u e l D l Ho o t k n C a a b o B u B l C C B g S n i H w e o g e R l l o C s g e l n s i o u K o o h H c t S a o B
Keyplan:
n o d n g o n i L w o R b u l C
25
4 0
Thames Path
3 2
1t R o1 u 5 v g Ma i y n n s i o n s
ST RE ET
AR VO N
2 2
Sp r ig n Pa sa s g e
GL EN D
2 a 8
2 8 b
1 2
2 8
Po ss t
5 6
5 4
2 1
e a d
L O WE RR IH C MO N DR O A D
9 3
5 0
4 8
3 6
Th e Du k e ( PH sH
2 b
TH AM ES PL AC E
R S O
WE IS S RO
U nv M i r a es n s i int o y s
1 4 t o 2 7
AD
BI GG
1 4
3 1
1 2 a
3 3
1 t o 1 2
3 5
3 5 a
Wawc ri k M ni as n os
TCB
3 7
4 3
1o t8
4 9
5 1
5a 1
5 3
6 5
7 9
8 1
(H P )
8 5
H a l f Mo o H n oe tl
3 4
2 2
1 2
1 1
2 0
w p i l S y a
Authorised channel Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the 5.1m Tunnel Datum which is 100 metres below Ordnance
B o r o
Posts
This drawing
Datum Newlyn.
R G i L v A e s l r y C T o n h s t a & L m B B e d y s
C C o C n L s t W ,
Key:
Limits of land to be acquired or used (LLAU) Existing public right of way Route of temporary diversion of right of way Existing right of way temporarily stopped up
d n a S d n a e l g n i h S
N E B D M E R E E R O D A
3 2
Area of public slipway to be temporarily stopped up during construction and removal of temporary slipway
34
Ap Ac Notes:
S l i p w M a S ea y l n i p w H a i y gh W
E M
Area of footway to be temporarily stopped up during construction and removal of the temporary slipway
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites
3 3
2 2
2 3
a t e r
B A N K M
are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.
Boat Builders
Ac T
E N
1 2
e l g n i h S
3 1
Area of carriageway to be temporarily stopped up during construction and removal of the temporary slipway
3 2
1 3
Ac
R U VG I N YG A R D E N S
1 0
Ac
1
1
10m
40m
MOP
Putney Pier
(floating)
1 0
FOR APPROVAL
Constitutional Club
S h i n g l e
MOP Dolphin
Location
Thames Path
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
Document Information
E N T
S t a G r a n a d r t e r (
P H )
S t a r a n ( P d
H Ga ) r t e
LB
E M
B A N K M
E N T
c Thames Water Utilities Ltd 2008
Y P I E
N
( F l o a t Tarmac i n g )
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
al k w ay
Conc
This drawing
98.92
98.90
Conc 104.54
on c
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
100.17
99.75 98.88
al k w
Limits of land to be acquired or used (LLAU) Trees to be pruned Above ground structures to be removed Structure to be removed and relocated or reinstated Below ground structures to be removed or infilled
ay
10 0. 70
98.86
C o n c 1 0 4 . 5 1
B 1 0 4 . 3 0
O/ H
1 0 1 . 2 7
100.59
99.91
100.23
Conc B
WV
g 0.9
s 10 1 0 h 14 4 . 4 1
1 0 4 . 3 1
B
B1 0 4 . 3 1 B B Life Saver
B r i c k R W
Gravel CPS
1 RS 0 4 . 4 B 5 GV
(UTT)
T / P 1 1 0 0 4 4 . 3 . 3 6 3
1 0 1 . 1 7
100.49
99.87
Notes:
98.85
Tarmac
1 0 4 . 3 3
10 4. 49
Stn 5S 104.366
10 4. 65
1 0 4 . T 7 a 2 m 1 r 0 4 a . c 7 9
10 4. 50
BP
1 0 CPS 4 . 6 1 4 0 4 Cobbles . 9 8
1. Area of foreshore will require dredging prior to formation of temporary working area. 2. Formation of temporary working area not illustrated. refer to construction phasing
98.81
B
1 0 4 . 5 0
RS Gravel CPS RS RG Tarmac 104.47 RG 104.49
0. 7
1 0 1 . 2 1 1 0 4 . 3 2
B
100.36
Modification to existing river wall to enable connection of new permanent hardstanding area works to include removal of handrailings.
99.93
ER
0. 7
1 0 6 . 1 3
LP1 0 4 . 7 2
1 0 4 . 6 8
B B g 2.6 s 14 h 22 1 0 4 . 5 7 B B1 0 4 . 3 8 B B B B
A s p h a l t
B t S i u t m e p e s n
1 0 4 . 9 3
1 0 4 . 7 6
CPS
B r i c k R W
bollards etc.) are not shown. 4. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown. Sections of existing pedestrian footway and upper sections of slipway to be removed to enable strengthening for vehicle 99.84 loading. Existing paving slabs to be removed, stored and reinstated upon 99.63 completion of works where possible.
98.80
1 0 6 . 3 0
BP
1 0 1 . 3 3
1 0 4 . 5 1
100.56
99.77
BP
1 0 6 . 2 4
1 0 5 . 9 3
BP
e m
EIC
BTIC
1 0 5 . 9 3
H R h
b a n k m
1 0 4 . 7 0 WV
BH
LP IC
1 0 6 . 2 5
e n t
B g 2.8 s 16 h 22
CL106.25 RG
1 0 6 . 3 7
106.09
1 0 6 . 2 7
IC 1 0 CL106.22 6 . 1 WV 9
1 . 1 T 1 i m 0 4 b . e 9 r 0 D e c ER k i n g
1 0 5 . 9 3
G r a v e l
B 1 0 4 . 6 3 B
1 0 4 . 7 2
M B A N K
1 0 4 . 7 1 7 0 4 . 9 0
L B n
B e n c h
B B CPS g 3.8
1 0 1 . 4 7 1 0 4 . 8 5
B 1 0 4 . 9 3
100.60
ER
1 0 5 . 9 2
BP
98.83
M E
s 22 RS h 22
B B
B r i c k R W 1 0 5 . 1 6
9 2 0 . 1 6
BTIC
FH
WV
1 0 6 . 3 4
T
Tarmac
Gravel
98.80
1 0 6 . 1 7
T/ P 10 6. 30
1 0 6 . 1 2
1 0 6 . 2 7
ER
CL106.39
10 6. 42
SP
1 0 6 . 2 6
1 0 5 1 . 0 1 5 3 . 9 2 H R h 1 . 1
1 0 5 . 1 0 0 0 5 . 1 0
C y c l e
Cycle Racks
B LP B RS
Life Saver B B
P a t h
1 0 5 . 1 6
B
10 6. 30
RG 106.34 IC CL106.35
T/P
10 6. 35
1 0 6 . 2 3 1 0 6 . 2 5 EIC
BP
1 0 6 . 3 0
1 0 6 . 1 3 1 0 6 . 0 9
SP 1 1 0 0 T 5 5 i . m . 1 9 3 0 1 b 0 6 e . r 0 9 D BP e c k i n g
1 0 5 . 2 4
100.57 E F R 5 no. Listed bollards to be removed, O R T H E stored and reinstated in new location. S A H M O E R S 100.44 100.14 E 99.56
I V
R i v e r T h a m e s
Sheet 3
98.80
Sheet layout
5 2 . 1 0 1
H R h 1 1.
1 0 5 . 2 8
Sheet 1
B
10 6. 38
RG
10 6. 54
IC
106.32
SP
1 0 6 . 3 7
CL106.34 IC WV
Cobbles
CPS
CL106.45 IC Stone 1 0 6 . 4 0
BTIC
1 0 6 . 2 9
CATV IC RG 106.17
CPS Tarmac
T/P
B B B
en tL i ne
CL106.42 LP
JB
1 0 6 . 3 7
1 0 6 . 2 7
10 6. 42
CPS
B 106 ac 5 k .4 of P av em
1 0 6 . 0 3
Tarmac
1 0 6 . 1 1
1 0 6 . 0 9
1 0 6 . 0 8
5 4 . 5 0 1 B IRS
Modification to existing river wall to enable connection of new permanent river wall
P 1 0 1 . 8 3
98.78
c i RW Br k
l at h p .4 s 53 A 0 1
98.76
Sheet 2
.6 53 0 1
4 5 0 . 1 5
P
0 .7 1 15
LP
42 5. 10 0 6 . 5 0 1
.1 55 0 1
101.85
2 5 0 . 1 5
LP
1 0 6 B . 2 a 7 c BP k o f P a v 1 e 0 m 6 e . 3 n 4 t L i n e
1 5 0 . 8 3
1 0 6 . 2 BTIC 8
L o w e ER r R i c 1 0 h 6 . m 2 3 o L O n d R W a E od R R 1 0 6 . I 2 1 C H
BP
5 5 . 5 0 1
BP
Stn 6S 105.538
101.43 101.71
BP LP
5 8 . 5 0 1
1 0 6 . 1 1
1 0 5 . 5 5 1 0 P 5 . 2 6
Cobbles
106.08
T/P
1 0 1 . 9 5
1 0 5 . 9 9
BP
15 1 0. 2
P 1 0 4 . 8 8 RS
102.14
IC CL105.95
7 6 . 5 0 1
Tarmac
1 0 4 . 8 5
P a v i n g S t o n e s
15 0. 5 3 15 0. 5 1
BP
1 0 4 . 9 5 1 0 4 . 6 1
The entire slipway will not be demolished. 100.07 Localised modification required of existing 100.94 slipway to enable construction of new permanent hard standing area. Localised areas of existing granite paving to be 101.62 removed, stored and reinstated upon completion of works.
101.12
98.81
1 5 0 . 1 5
0 9 . 5 0 1
99.59
10m
10m
76 5. 10
90 4 6 5. 0 . 1 5 es 10 bl 89 ob 5. C 10
73 5. 10
0 .6 1 57
P
B r i c k R W
O H /
EIC T/P
15 7 0. 7
WV
1 0 60 .4
SP
2 9 . 5 0 1
1 0 4 . 4 7
FOR APPROVAL
105.98
D
WV
1 0 5 . 9 5
B
T/P
TLIC 1 0 5 . 9 2 T/P BP
15 0. 2 4 BP
2 6 0. 16
W B
1 0 48 .4
1 0 4 . 3 2 1 0 3 . 9 8
Cobbles
79 5. 10 80 5. 10
51 5. 10
.7 5 7 BW 0 1
SP
. 11 Rh H
RG 105.96 BP BTIC
1 0 6 . 2 2
106.14 Tarmac
1 0 6 . 0 4
EIC
JB BTIC
g 4.5 s 22 h 22
1 0 5 . 4 3 1 0 5 . 6 0
B W B W
H R h
1 0 3 . 9 8
1 0 6 . 1 0
1 0 6 . 2 1
1 6 0 . 0 8
WV WV
SB
Water Mkr FH
1 . 1
1 0 5 . 3 8
1 0 6 . 2 T/P 0
1 0 6 . 2 8
RG 106.09
10 6. 13
1. 2
1 0 6 . 0 2
1 0 6 . 0 9 T/P
1 0 1 5 0 . 5 7 IC 1 64 0 .8 6 2 CL106.21 .9 G r a n i t e W
1 0 4 . 1 8
1 0 3 . 7 7 1 0 3 . 4 5
Removal of existing timber fenders 100.65 to enable construction of temporary and permanent works
P
Location
3 1 . 6 0 1
g 1.2 s 7 h 9
1 0 5 . 1 8
I R
10 6. 10 36 6. 20
Brick Column
.7 63 0 1
BP
Tarmac
10 6. 40
1 0 6 . 1 4
LP
1 0 6 . 3 6
10 6. 42
Tarmac
Brick Column
BTIC 1 0 6 . 2 5
a 16 l 0. l 6 6 1 0 6 . 4 8 1 0 6 . 4 4 LP
Grass
1 0 5 . 3 0
H R
1 0 P v 3 ai . 3 g 8 n S t o n e s
1 0 3 . 4 7 B r i c k 1 R 0 W 3 . 1 5
h 1 . 11 0 5 . 0 9
g 1.2
1 0 1 . 9 9
Cobbles
100.37
Section 48 publicity
1 0 2 . 9 6
P
1 0 3 . 6 0
BS Tarmac BP B a c k o f P a v e m e n t L i n e
1 0 6 . 6 0
10 6. 50
1 0 6 . 9 2
s 6 h 10
1 0 5 . 0 7
1 0 2 . 8 8
1 0 2 . 6 3
1. 2
I R F
10 6. 44
I R
h 2 . 2
10 6. 47
1 0 6 . 3 6
Cable ducts to be cored 1 1 0 0 through listed wall 6 106.15 6 . . 5 3 7 2 below ground level
RG
1 0 6 . 7 7
1 0 6 . 8 2
1 0 5 . 2 0
H R
h 1 . 3 1 0 5 . 0 3
1 0 5 . 0 6
1 0 2 . 4 2
1 0 2 . 1 8
B u s S h e l t e r
IC CL106.26 Tarmac
BS
g 1.8
1 0 s 6 7 . 2 h 12 3
B u s 1 S 0 h 7 e . 1 l t 2 e r 1 0 7 . 0 7
B r i c k R W
Grass
1 0 2 . 8 5
101.10
July 2012
100.90
P a v i n g S t o n e s
g 1.2 s 6 h 11
1 0 1 . 8 8
P
B r i c k R W
1 0 1 101.25 . 8 7 P
1 0 6 . 3 9 1 0 6 . 4 6
1 0 6 . 8 3
1 0 5 . 1 5
1 0 5 . 1 0
TLIC
g 1.4 B BP BP
1 0 7 . 5 2
s 8 h 13
1 0 5 . 0 3
1 0 2 . 4 0
1 0 1 . 5 0 1 0 1 . 1 5
101.23 Blocked Door
1 0 7 . 3 5
1 0 5 . 1 1
B r i c k R W
H R
Tree Stump
Cobbles
h 1 . 3
1 0 5 . 1 0
98.80
99.56 98.78
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
98.76
N
Keyplan:
99.59
This drawing
Authorised channel
101.12
98.72
99.69
99.16 100.66
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
98.95
Key:
98.75
100.65
A K M
1 0 3 . 7 7
P
1 0 1 . 9 9
100.37
11 11 1. 0. 36 22
P a v i n g S t o n e s
11 1. 31
1 0 3 . 4 7 B r i c k 1 R 0 W 3 . 1 5
Trees to be removed
Cobbles
99.30 P 99.99
11 1. 21
1 0 2 . 9 6
Stn 1S 9 8 . 4 110.180 7
IC
IC
1 0 2 . 8 8
1 0 2 . 6 3
P
1 0 1 . 6 1 1 0 2 . 5 4
103.69
H R
h 1 . 3 1 0 5 . 0 3
1 0 5 . 0 6
1 0 2 . 4 2
1 0 2 . 1 8
98.94
11 11 1. 1 0. 8 08
11 1. 21
g 1.8 s 6
h 12
1 0 7 . 1 2 1 0 5 . 1 5
100.90
10 9. 89
B r i c k R W
11 0. 11
P a v i n g S t o n e s
g 1.2
1 0 1 . 8 8
100.25
11 1. 03
1 0 2 . 8 5
1 0 1 . 9 4
101.10
Notes:
1. Area of foreshore will require dredging prior
11 0 11 . 0 2 1. 28
Grass
TLIC
s 6 h 11
g 1.4
1 0 5 . 1 0
B r i c k R W
1 0 1 101.25 . 8 7 P
1 0 1 . 5 0
99.46
to formation of temporary working area. 2. Formation of temporary working area not Mean low water illustrated. refer to construction phasing layout layout drawings. 3. General activities of site clearance such as removal of hardstanding and foundations,
RG 107.12
1 0 7 . 3 5
1 0 5 . 1 1
H R
Tree Stump
h 1 . 3
1 0 5 . 1 0
Blocked Door
101.23 101.04
99.81
a l l
10 5. 04
g 0.9 s 6
1 V h 8 0 5 et . nP 1 4 i p e
1 0 1 . 9 3
1 0 5 . 1 1
1 0 5 . 0 0
TLIC WV WM
1 0 4 . 2 6
D i t c h
1 0 7 . 6 8
1 0 7 . 3 5
1 0 7 . 6 2
Conc
Tarmac
S m o k T e a O r m u t a l e c t
1 0 3 . 4 7
1 0 7 . 6 5
1 0 I 72 R .3 F h 1 . 0
100.49
1 0 5 . 1 0
1 0 5 . 1 1
100.94
1 0 1 . 5 1
1 0 5 . 0 8
g 1.8 s 18 h 17
100.87
G r a n i t e R W
1 0 5 . 1 0
11 0. 82
11 0. 97
1 B 0 r 1 i c . 4 k 5 R W
11 1. 13
1 0 7 . 2 0
G r a n i t e W
1 0 5 . 0 3
1 0 1 . 5 9
9 8 . 6 8
1 11 10 1 1. . 7 15
9 8 . 5 6
BP
1 0 7 . 5 2
h 13
B r i c k R W
Cobbles
1 0 1 . 1 5
100.32
11 0. 14
s 8
L1 10 I C . 21
1 0 5 . 0 3
1 0 2 . 4 0
100.22
99.59
IC
L O
GV
1 10 10 2 9. . 6 15
1 . 0
1 0 7 . 6 4 WV 1 GV GV 0 7 . 6 WV 6
BTIC
11 0. 52
H R
11 0 10 . 0 8. 3 99
Blocked Door
h 1 . 3 1 0 5 . 0 4
11 0. 18
I R F
I C
s 3 h 7
10 9. 11
1 0 7 . WV 4 7 BTIC
1 0 7 . 4 9
R R
1 0 7 . 8 8
Grass
g 0.4
1 0 5 . 0 6
103.68 IC
11 0. 66
10 9. 10
Ditch Gate 1 G 0 r 8 a . BP n 1 i 8 t e W a 1 l 0 l LP 8 . 2 1 6 1 1 0 0 0 4 7 1 8 . . 0 . 4 9 0 4 1 8 7 . 4 4
H R
h 1 . 3
1 0 1 . 7 5
100.94
g 2.2 s 6 h 15 MB
1 0 5 . 0 6
6 1 0 3 . 1 1 1 0 . 0 2 1 1 3 1 . 5 0 1 1 . 7 1 8 0 1 . 7 0 1 1 1 0 0 . 1 2 . 5 7 9 1 JB 0 3 LP . IC 8 0
6 0 . 5 0 1
99.31
Sheet layout
99.29
IC IC
Sheet 3
99.34 100.17
D R
R I
JB
W R k 51 3 c i 3 r 8. . B 8 10 0 1
CPS
BP
1 0 8 . 2 3
1 0 4 . 6 1
Ditch
1 0 8 . 9 0
1 0 8 . 9 6
10 8. 99
BP
1 0 51 .3 Blocked Door 1 0 45 .9
1 0 9 . 2 2
F h
Sheet 1
99.29
2 7 . 7 0 1
e k o
0 1.
2 0 0 . 1 5 9 5 0 . 1 4
RG
BTIC
10 9. 14 11 0. 22
1 0 8 . 3 2
1 0 83 .6
1 0 . 7 1 0. 18 R h 108.41 IF 108.57
10 9. 07
10 8. 71
10 8. 98
WV
10 9. 11
TL
CL108.46 B
I L1 C 09 . 07
1. 0
TL
10 8. 58
10 8. 55
10 9. 98
H R
TL B
11 0. 00
IC CL108.19
EIC EIC
CPS LP
10 8. 93
1. 0
WV IC IC
TLIC
IF R
JB
LP GV IC
RG
10 9. 10
18 0. 18 5 0. 71 5 0. 2 TL 87 1 T/P TL
I C C L1 08 . 97
I R
10 8. 70
I C L1 08 . 76
1. 0
TL
10 8. 65
T/P
1. 0
10 8. 62
TLIC
T L I TL C B
1. 0
10 8. 42
109.79
FH
GV WV JB
C I .6 82 0 1 L C
I R
IC
h 1 . 8
I R F
106.38 H R h 1 . 0 G a t e
1. 8
0 .7 1 81
1 80 0 .4
10 8. 15
1 79 0 .1
1 80 0 .0
BP
IC
1 78 0 .2
BTIC
I RF h 10 . 1 78 0 .7
JB JB WV
IG
1 76 0 .8
GV
GV
1 76 0 .9
m S
R I
l l t rn e G a i Wa
.2 87 0 1 BP LP
RG IC
Sheet 2
100.86
O t e l t u
F h 0 1.
6 9 . 7 0 1
CPS WV WV WV GV
99.99
1 1 0 . 2 1
2 4 . 8 0 1
99.73 101.71
BP
IC
IC 101.79
10m
10m
44 8. 10
R I F
h
TI LC
17 8. 10
2 6 . 8 0 1
0 . 1
5 4 P . T/ . 8 08 3 8 1 0 1
20 8. 10
T/P
4 5 . 8 0 1 C I L T
1 6 . 8 0 1
10 8. 10
6 5 . 8 0 1
15 8. 10
26 8. 10
1 . 0
104.70
B a s e o f R e t a i n i n g W
4 5 . 8 0 1
101.08
a l l
FOR APPROVAL
1 0 1 . 9 9
100.65
R I F h 0 1.
JB C I 0 .1 82 Mkr 1 L C JB JB BTIC IC CL108.18 LP WV TLIC WV T/P
107.00
.1 82 0 1
Location
Stn 2S 108.563
1 0 1 . 8 9
.0 83 0 1
C I 0 .5 81 1 L C
8 0 0 . 1 8
Document Information
1 0 1 . 9 8
EIC
1 0 2 . 0 6
CPS
1 0 2 . 1 0
1 0 2 . 1 8
1 0 2 . 1 6
B a s e o f R e t an ii n g W
B e n c h
1 0 1 . 1 6
N
99.39
1 0 4 . 2 1 2 0 4 . 0 7
1 0 4 B . 2 8
G 10 r a 4 v . e 24 l g 1.1 s 10 h 7
B 100.41 B LP
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
98.47
Keyplan:
B
B e n c h
L B n
1 0 4 . 1 2 0 2 4 . 0 6
1 0 4 . 2 9
B
8 2 0. 11 9 3 0. 11
10 0. 8 1 11 0. 0 3
99.36
1 0 1 05 0 .6 0 . 7 4
B
Stn 3A 104.207 B
Authorised channel
102.02
1 8 . 2 0 1
1 1 0 0 05 0 .5 . 7 5
This drawing
k c i r B
R W
98.47
99.46
2 3 . 4 0 1
C P S
B B
1 0 4 . 3 1
6 6 . 0 97 0 . 1 0 0 1
Conc
Non residential moorings to be temporarily relocated for part of the construction period.
98.43
B
GV GV
1 0 4 1 . 0 1 3 0 . 5 2
1 0 08 .6 1 0 07 .0
1 0 4 . 2 3
1 0 4 . 4 5
1 0 4 . 1 1 7 0 4 . 0 8
10 4. 25
4 4 . 4 0 1
WVx3
1 0 4 . 1 1 0 8 4 . 0 6
B
9 2 . 4 0 1
103.05
99.52
102.06
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
8 7 . 0 06 0 . 1 1 0 1
1 0 4 . 0 1 2 0 4 . 0 2
RS
IC
102.98
1 0 1 0. 0 8 1 2 . 0 4
CL104.45
Tarmac
102.06
S
1 0 4 . 4 2
L
FH CL104.41
I P W A Y
Boat slipway to be temporarily closed during construction and removal of temporary slipway. Boat slipway maintained, although temporarily reduced in width, during operational phase of temporary slipway. 99.37
98.45
1 0 1 0. 0 5 0 3 . 7 6
Key:
Limits of land to be acquired or used (LLAU) Trees to be pruned Structure to be removed and relocated or reinstated
7 2 . 4 0 1
1 0 3 . 9 9
102.90 101.95
99.18 98.44
R i v e r T h a m
Boat builders
1 0 4 . 4 2
0 4 . 4 0 1
6 3 0 . 1 0 6 5 0 . 1 0
e s
Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. Formation of temporary working area not illustrated. Refer to construction phasing
E M
B A N K
102.75 101.97
M E N
7 3 . 4 0 1
k c a B
1 0 3 . 9 5
Conc
LP
Localised sections of existing slipway to be removed to enable installation of circular support piles for slipway decking.
100.43
4 2 . 4 0 1
RS
0 0 . 4 4 0 9 . 1 3 0 1
0 4 . 3 0 0 1 1 . 4 0 1
1 0 2 1 . 0 8 4 5 . 2 B B 0 r i c k R Life 1 W 0 Saver 4 B . 2 7
m e v a P f o
99.00
R u v i g n y G ad re n s
t n e
7 3 . 4 0 1 6 2 . 4 0 1
GV
100.07
1 0 1 . 6 5 1 0 1 . 5 8
B
B
8 0 . 4 0 0 0 . 1 4 0 1
C P S
B
1 0 4 . 2 8
B
Tarmac
L RS Bn
1 0 1 . 3 8
B
Steel decking of slipway to be located over existing footway. Localised modification required to footway, river wall and street furniture to enable slipway construction. Installation of 98.97 support piles through existing footway 99.87 to provide deck support.
removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.
98.48
h c n e B
G
1 0 4 . 2 9
1 0 4 . 4 1
1 0 4 . 1 1 0 6 4 . 0 7
g 2.5 s 9 h 12
1 0 4 . 2 3
B B
B e n c h
B LP
1 0 4 . 2 8
1 0 1 . 1 1
99.76 99.01
98.44
B Stn 2A 104.241
GV
1 0 4 . 2 9
1 0 4 . 1 1 5 0 4 . 0 8
B RS
1 0 4 . 4 6
1 0 4 . 1 6
1 0 4 2 G .1 r a v e l
L B n
1 0 0 . 9 7
B B
Sheet layout
g 0.8 s 5 h 5
LP
B e n c 1 h 0 4 . 1 1 5 0 4 . 0 8
Sheet 3
99.73 99.05
1 0 4 . 3 0
g 2.5 B s 10 h 10 1 RS 0 4 . 1 2 0 Gr 0 4 . a 1 v 7 e l
1 0 0 . 8 9
B 98.43
Sheet 1
B r i c k
B
R W
99.68
1 0 4 . 4 5
R
1 0 0 . 9 0
1 0 4 B . 1 1 0 4 4 . 0 6
B RG 104.04
G
I V
99.02
Sheet 2
R T S H H A
B a c k
r a v e l
g 2.5 s 10 h 10
o f P a v e m
1 0 4 . 2 7
e n t
98.42
1 0 4 . 1 1 6 0 4 B . 0 9
1 0 4 . 4 4
99.69 B
1 0 0 . 8 3
E E
S
99.08
10m
10m
C P S
n B L
Tarmac
1 0 4 . 2 9
1 0 4 . 4 1
B 1 0 4 . 1 1 6 0 4 . 1 0
RS B B B
FOR APPROVAL
1 0 4 . 2 8 B
g 0.7 s 5 h 5 99.99 99.15 B B
1 0 4 2 G .1 r a v e l
LP
1 0 4 . 3 1
1 0 0 . 9 3
Location
1 0 4 . 4 4
1 0 1 4 0 . 1 4 5 . 0 9
L B n
B e n c h
1 0 0 . 8 1
1 0 4 . 3 0
B r i c k R W
Document Information
Section 48 publicity
B B
RG 104.04
C P S
RS
B a c k o f P a v e m
1 0 4 . 2 8
B
1 0 1 . 1 7
e n t
1 0 4 . 4 9
1 0 4 . 3 5
1 0 4 . 3 1 0 0 4 . 0 8
PM
G r a v e l
LP B B Life Saver B B
1 0 4 . 2 8
1 0 4 . 3 5 L B n
g 1.0 s 5 h 6
July 2012
100.29
B Tarmac
1 0 1 4 0 . 4 3 . 5 1 8
1 0 4 . 6 5
mp a R
6 7 0. 14
1 0 4 . 5 B 7
1 0 4 . 4 5
1 0 1 . 1 9
B B
rh re ri Ba 1 1.
1 0 4 . 3 5
BrS
1 1 0. 0 43 4 7 . 2 1
G r a v e l g 1.1 s 5 1 0 h 6 1 4 3 0 . 1 4 6 0 . 2 4 5 . 1 3
B B B
1 0 4 . 2 9
1 0 1 . 5 7
Maximum extent of top of river wall Handrail excluded for clarity Top of river wall 105.84m maximum 105.54m minimum
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Dolphin
MOP
Putney Pier
(floating) River foreshore (level varies) Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Th e Du k e sH
e a d
( PH )
S h i n g l e
MOP Dolphin
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
S t a G r a n a d r t e r (
Zone within which ventilation column(s) serving the shaft and electrical kiosk(s) assigned to the foreshore structure may be located Zone within which Work No. 5a would be located
M L W
Key:
Foreshore structure Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located
TH AM ES PL AC E
P H )
U nv M i r a es n s i int o y s
1 4 t o 2 7
Table 1
5o 0 2 t3
Ventilation columns(s) serving the shaft Ventilation columns(s) serving the interception chamber
S TR
E E T
assigned to the foreshore structure Electrical and control kiosk assigned to Watermans Green
12 2
A N
K e C ni w ou l o r rh t t
t o
El Sub Sta
10 1
1 2
1 0
R LW nst G , i L v A e s l r y C T o n h s t a & L m B B e d y s
C C
C o
B o r o
1 4
PH
1
1 6
1 8
R u 1 5 v g Ma i y n n s i o n s
1t o
S l i p w M a S ea y l n i p w H a i y gh W
E M
Po ss t
1 0
Boat Builders
B A N K M
E N T
2
War
2 0
a t e r
2 a 8
2 8 b
2 6
2 8
3 1
ST RE ET
3 2
ST RE ET
PU TN EY HI GH
EI MA R
R U VG I N YG A R D E N S
1 0
Dolphin
2 8
2 1
MOP
Putney Pier
(floating)
ea d
Th e Du k e sH
3 4
2 2
Constitutional Club
( PH )
Scale 1:1000
S h i n g l e
MOP Dolphin
3 1 t o 5 4
t o
t o
1 0
3 1
1 2 a
1 1
3 3
1 t o 1 2
S t a r a n ( P d
H Ga ) r t e
3 5
LB
3 5 a
d n a S
Typical Section A
(Not to scale)
Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located Maximum extent of top of river/ parapet wall
BP
E M
B A N K M
E N T
MOP
S h i n g l e
R i v e r T h a m e s
Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
Posts
Maximum height above finished ground level (Minimum heights are in brackets where applicable) 8.0m (4.0m)
Zone on Watermans Green within which electrical and control kiosk(s) may be located
LB
Zone beneath Putney Bridge within which interception chamber may be located
6.0m
L O W
Shelter
E R
R I C H M O N D
H a r d
R O A D
PC
3.0m
5 5 t o 7 8
Shelter
Fn
S h i n g l e
R c M ih a m n s o i n o d n s
M e a n l o w
w a t e r
Zone within which ventilation column(s) serving the interception chamber may be located 10m Alternative zone within which ventilation column(s) serving the interception chamber may be located 0 40m
d n a
e l g n i h S
St Marys Church
M e a n H ih g W R i a v t e e r r s i d e W a l k
Slipway
FOR APPROVAL
2 0
Location
3 3
Posts
e l g n i h S
Meml
Church Square
Shelter
July 2012
Posts
LB
32
PH
2 5 t o 3 0
Cinema
L W
L W
L W
M e a n H i g h W
a t e r
M e a n H i g h W
a t e r
M e a n H i g h W
a t e r
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
Dolphin
Dolphin
Dolphin
MOP
Putney Pier
(floating)
MOP
Putney Pier
(floating)
MOP
Putney Pier
(floating)
This drawing
S h i n g l e
MOP Dolphin
S h i n g l e
MOP Dolphin
S h i n g l e
MOP Dolphin
S t a r a n d G a r t e r
S t a G r a n a d r t e S t a r a n ( P d
B rd i ge
B rd i ge
L W
P ut ne y
P ut ne y
P ut ne y
r ( P H )
BP
t e r
r ( P H )
S t a G r a n a d r t e S t a r a n ( P d
L W
BP
t e r
r ( P H )
S t a G r a n a d r t e S t a r a n ( P d
L W
B rd i ge
S t a r
S t a r
BP
t e r
H Ga ) r
H Ga ) r
H Ga ) r
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the
BP
BP LB
E M
B A N K M
E N T
MOP
S h i n g l e
R i v e r T h a m e s
BP LB
E M
B A N K M
E N T
MOP
S h i n g l e
R i v e r T h a m e s
LB
E M
B A N K M
E N T
MOP
S h i n g l e
Posts
Posts
Posts
5o 0 2 t3
5o 0 2 t3
5o 0 2 t3
Key:
Limits of land to be acquired or used (LLAU)
LB
1 t o 2 4
LB
LB
L O W
Shelter
E R
R I C H M O N D
E E T
E E T
E E T
H a r d
1 t o 2 4
79
L O W
Shelter
E R
A TE R
A TE R
PC
PC
A TE R
R O A D
R I C H M O N D
H a r d
1 t o 2 4
79
L O W
Shelter
E R
R O A D
R I C H M O N D
H a r d
S TR
S TR
S TR
79 t o 10 0
t o 10 0
t o 10 0
R O A D
A N
A N
A N
12 2
12 2
K e C ni w ou l o r rh t t
K e C ni w ou l o r rh t t
Shelter
Shelter
K e C ni w ou l o r rh t t
12 2
t o
t o
10 1
10 1
10 1
t o
Fn
5 5 t o 7 8
Fn
5 5 t o 7 8
Fn
5 5 t o 7 8
Shelter
Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)
Kenilworth Court
Kenilworth Court
Kenilworth Court
1 8
1 8
1 0
1 0
1 8
1 2
1 2
1 2
1 0
PH
ou nt C
ou nt C
Po ss t
Po ss t
ou nt C
St Marys Church
16
16
1 8
1 8
1 8
1 0
1 0
16
Slipway
Slipway
Po ss t
M e a n H ih g W R i a v t e e r r s i d e W a l k
PH
St Marys Church
M e a n H ih g W R i a v t e e r r s i d e W a l k
ou r t
ou r t
ou r t
1 4
1 6
1 6
1 4
1 4
PH
1 6
1 0
2 0
2 0
2
War Posts Meml
CL OS E
CL OS E
CL OS E
2 0
2 6
2 6
2 6
Church Square
Church Square
HS TR EE T
HS TR EE T
t br i g o 12 d e Ho 18 us e
t br i g o 12 d e Ho 18 us e
1 to 67 Shelter
1 to 67 Shelter
t br i g o 12 d e Ho 18 us e
HS TR EE T
R E E IG M KN S
R E E IG M KN S
R E E IG M KN S
ST RE ET
ST RE ET
ST RE ET
EI MA R
EI MA R
PU TN EY HI G
PU TN EY HI G
PU TN EY HI G
LB
2 8
Posts
7
LB
2 8
Posts
7
EI MA R
2 8
Ca m
Ca m
Ca m
PH
3 0
PH
3 0
1 t o 9
Cinema
1 t o 9
Cinema
1 t o 9
Deer Lodge
1 0
Deer Lodge
1 0
1 6
Deer Lodge
1 0
1 Ro t o 1 s ln 5 Ho e a d u s e
1 Ro t o 1 s ln 5 Ho e a d u s e
1 Ro t o 1 s ln 5 Ho e a d u s e
20
20
20
LA NE
LA NE
US E
US E
HO
HO
HO
R O A D
Pol Sta
R O A D
Pol Sta
R O A D
Pol Sta
US E
BR EW
BR EW
2 3 0
M L W
2 3 0
M L W
2 3 0
M L W
M e a n H i g h W
a t e r
M e a n H i g h W
BR EW
a t e r
Dolphin
Dolphin
MOP
Putney Pier
(floating)
MOP
Putney Pier
(floating)
S h i n g l e
MOP Dolphin
S t a r a n d G a r t e r
S t a G r a n a d r t e r (
Zone within which ventilation column(s) serving the shaft and electrical and control kiosk(s) assigned to the foreshore structure may be located
B rd i ge
M L W
S h i n g l e
MOP Dolphin
S t a r a n d G a r t e r
S t a G r a n a d r t e r (
Zone on Watermans Green within which electrical and control kiosk(s) S t a r a n may be located d G
B rd i ge
M L W
a r t e r
S t a G r a n a d r t e S t a r a n ( P d
L W
P ut ne y
P ut ne y
BP
t e r
BP
t e r
BP
t e r
H Ga ) r
H Ga ) r
H Ga ) r
BP LB
E M
B A N K M
E N T
MOP
S h i n g l e
R i v e r T h a m e s
BP LB
P ut ne y
P H )
S t a r a n ( P d
P H )
S t a r a n ( P d
r ( P H )
E M
B A N K M
E N T
MOP
S h i n g l e
R i v e r T h a m e s
B rd i ge
LB
Posts
Posts
5o 0 2 t3
5o 0 2 t3
LB
LB
1 t o 2 4
L O W
Shelter
E R
R I C H M O N D
E E T
E E T
E E T
H a r d
1 t o 2 4
79
L O W
Shelter
E R
A TE R
A TE R
PC
12 2
PC
12 2
A TE R
R O A D
R I C H M O N D
H a r d
S TR
S TR
S TR
R O A D
A N
A N
A N
K e C ni w ou l o r rh t t
K e C ni w ou l o r rh t t
Shelter
Shelter
K e C ni w ou l o r rh t t
12 2
t o
t o
10 1
10 1
Kenilworth Court
Kenilworth Court
Kenilworth Court
1 8
1 8
1 0
1 8
1 2
1 2
1 2
1 0
1 0
PH
ou nt C
ou nt C
ou nt C
St Marys Church
Po ss t
Po ss t
16
16
1 8
1 8
1 8
1 0
1 0
16
Slipway
Slipway
Po ss t
M e a n H ih g W R i a v t e e r r s i d e W a l k
PH
St Marys Church
M e a n H ih g W R i a v t e e r r s i d e W a l k
ou r t
ou r t
ou r t
1 4
1 6
1 6
1 4
1 4
PH
1 6
1 0
2 0
2 0
2
War Posts Meml
CL OS E
CL OS E
CL OS E
2 0
2 6
HS TR EE T
HS TR EE T
t br i g o 12 d e Ho 18 us e
t br i g o 12 d e Ho 18 us e
1 to 67 Shelter
1 to 67 Shelter
t br i g o 12 d e Ho 18 us e
HS TR EE T
R E E IG M KN S
R E E IG M KN S
R E E IG M KN S
2 6
2 6
Church Square
ST RE ET
ST RE ET
ST RE ET
Zone beneath Putney Bridge within which interception chamber may be located
EI MA R
1
2 8
Church Square
EI MA R
PU TN EY HI G
PU TN EY HI G
PU TN EY HI G
LB
2 8
Posts
7
LB
Posts
7
EI MA R
2 8
Ca m
Ca m
Ca m
PH
3 0
PH
3 0
1 t o 9
Cinema
1 t o 9
Cinema
1 t o 9
Deer Lodge
1 0
Deer Lodge
1 0
Deer Lodge
1 0
1 Ro t o 1 s ln 5 Ho e a d u s e
1 Ro t o 1 s ln 5 Ho e a d u s e
1 Ro t o 1 s ln 5 Ho e a d u s e
20
20
20
LA NE
LA NE
US E
US E
HO
HO
HO
R O A D
Pol Sta
R O A D
Pol Sta
R O A D
Pol Sta
US E
BR EW
BR EW
2 3 0
2 3 0
2 3 0
BR EW
F E L S H A M
F E L S H A M
F E L S H A M
LA NE
42
42
42
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
1 1
1 5
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
1 1
1 5
3 1 t o 5 4
3 1 t o 5 4
3 1 t o 5 4
t o
t o
R c M ih a m n s o i n o d n s
t o 9 1 t o 1 0
R c M ih a m n s o i n o d n s
10 1
t o
Fn
5 5 t o 7 8
Fn
5 5 t o 7 8
F E L S H A M
F E L S H A M
F E L S H A M
LA NE
42
42
42
Dolphin
MOP
Putney Pier
(floating)
S h i n g l e
MOP Dolphin
E M
B A N K M
E N T
MOP
S h i n g l e
Posts
5o 0 2 t3
LB
1 t o 2 4
79
L O W
E R
R I C H M O N D
R O A D
PC
Fn
5 5 t o 7 8
R c M ih a m n s o i n o d n s
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
1 1
1 5
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
1 1
1 5
3 1 t o 5 4
3 1 t o 5 4
3 1 t o 5 4
t o
t o
R c M ih a m n s o i n o d n s
t o 9 1 t o 1 0
R c M ih a m n s o i n o d n s
R c M ih a m n s o i n o d n s
1 3 5 t o 1 4 6
27 19
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4 1 2 3 t o 1 3 4
7
St Marys Church
Notes:
War Posts Meml
27
27
Church Square
1 to 67 Shelter
LB
Posts
PH
Cinema
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
19
19
1 1
13
1 1
1 1
1 1
7 7
1 5
79 t o 10 0
27 19 13
32
32
32
2 5 t o
2 5
2 5
13
13
t o
t o 3 0
1 6
1 6
t o 1 9
t o 1 9
t o
1 9
15
15
15
2 4
2 4
2 4
Alternative zones within which ventilation column(s) serving the interception chamber may be located
M e a n H i g h W
a t e r
BP
R i v e r T h a m e s
100m
Shelter
H a r d
t o 10 0
27 19
t o 10 0
27 19
FOR INFORMATION
Shelter
Location
Document Information
St Marys Church
Church Square
LB
Posts
S48-PP-05X-PUTEF-000050
PH
July 2012
32
32
32
2 5 t o
2 5
2 5
13
13
t o
t o 3 0
Cinema
1 6
1 6
1 6
1 5
t o 1 9
t o 1 9
t o
1 9
15
15
15
2 4
2 4
2 4
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Works No. 1a. 6.5m internal dia main tunnel to Acton Storm Tanks Authorised channel
Keyplan:
This drawing
Works No. 5a. CSO drop shaft (6m internal dia) Zone within which Works No. 5a would be located Provision for construction of solid fillet between new and existing river walls. - See note 7
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
0.6m internal dia. ventilation column, minimum 4m to 8m maximum height Works No. 1a. 6.5m internal dia main tunnel to Carnwath Road Riverside Limits of land to be acquired or used (LLAU) Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Scour protection Zone within which permanent above ground structures would be located
(UTT)
Notes:
Works No. 5b. 2.2m internal dia connection tunnel 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. Putney Bridge is a listed structure. The construction of the interception chamber beneath the arch of the bridge will require a permanent physical connection between the chamber and the bridge. Once constructed the new chamber will be visible at certain tidal states and will change the profile of the bridge arch when viewed in elevation. 5. Two electrical and control kiosks are required. One local kiosk situated upon the new permanent hardstanding area and one situated upon Watermans Green against the listed retaining wall. 6. Two potential zones for the interception chamber ventilation column are illustrated. Only one interception chamber ventilation column will be required. 7. Construction of solid fillet between new and existing river walls to reduce accumulation of river debris at low tide. Solid fillet to be constructed at a later date if river debris is an issue. 10m 0 10m
Valve chamber
Ventilation chamber
Outfall apron
Valve chamber New structure alignment to tie into line of existing river wall
Storm overflow
Local electrical and control kiosk 2m x 2m x 2.5m high. Height of local kiosk is above new permanent hardstanding, not existing ground level.
E m
b a n k m
e n t
New structure alignment to tie into line of existing river wall 105.54 Provision for construction of solid fillet between new and existing river walls. - See note 7 Connection culvert constructed beneath foreshore Sheet layout Zone within which Works No. 5c would be located Sheet 1 Matchline: Sheet 2
L o w e r R i c h m o n d R o a d
Ventilation duct
Sheet 2
ILLUSTRATIVE
Location
Kenilworth Court
c Thames Water Utilities Ltd 2008
Works No. 1a. 6.5m internal dia main tunnel to Acton Storm Tanks
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan: M a c l e Sh e 2 thi : e t n
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Electrical and control kiosk located adjacent to stair access to disused public convienience - see note 5. Alignment of existing granite wall to be extended to enclose electrical and control kiosk. Existing ventilation outlet to be extended to new granite wall. Kiosk, including extended granite wall and extended ventilation duct 5m x 2m x 3m. Height of extended granite wall enclosing kiosk to match existing granite wall.
Key:
Limits of land to be acquired or used (LLAU) Existing sewers Zone within which all permanent site structures would be located Zone within which permanent above ground structures would be located
B rd i ge
P ut ne y
Works No. 1a. 6.5m internal dia main tunnel to Carnwath Road Riverside
Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. Putney Bridge is a listed structure. The construction of the interception chamber beneath the arch of the bridge will require a permanent physical connection between the chamber and the bridge. Once constructed the new chamber will be visible at certain tidal states and will change the profile of the bridge arch when viewed in elevation. 5. Two electrical and control kiosks are required. One local kiosk situated upon the new permanent hardstanding area and one situated upon Watermans Green against the listed retaining wall. 6. Two potential zones for the interception chamber ventilation column are illustrated. Only one interception chamber ventilation column will be required.
L o w e r R i c h m
R o a d
0.225m internal dia ventilation column, 6m high Emergency egress points for vaults located beneath Lower Richmond Road. Egress across Watermans Green to be maintained during and after construction
Sheet layout
Sheet 1
10m
10m
Sheet 2
Modifications required to existing pipework in underground vaults located beneath carriageway. Working area and draft limit of land to be acquired or used refers to underground vaults beneath carriageway. It is not proposed to close carriageway.
ILLUSTRATIVE
Location
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Limits of land to be acquired or used (LLAU) + 104.10m Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum)
104.50
Notes:
Temporary slipway location. Constructed from prefabricated steel, with non slip steel decking supported on circular piles. - See note 4. Existing boat slipway maintained although temporarily reduced in width 104.30 Marine Chandlery
L e p v l e a t l f o r m
R i v e r T h a m
e s
+ 104.00
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. This slipway is to be provided as a temporary replacement for the slipway at Putney Embankment foreshore site. It is proposed that this temporary slipway be removed once work at the Putney Embankment foreshore site is complete.
E m
b a n k m
Navigational requirements including timber pile fenders and mooring requirements not illustrated.
e n t
S l o p e
1 : 1 4
10m
10m
ILLUSTRATIVE
Location
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
P i er P ut ne y
Local electrical and control kiosk, high quality metal finish as signage Provision for solid fillet between new and existing river walls to reduce accumulation of river debris. Fillet to be added post construction if required Metal marking strip feature to align with the boat race stone AA Ventilation column 4m minimum to 8m maximum height Bench/ seating
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. River Elev.
Key:
Limits of land to be acquired or used (LLAU) Balustrade to perimeter Relocated Putney Bridge CSO New riverwall with vertical fenders Coping stone along perimeter Flush strip LED ground lighting + 105.40m Zone within which permanent above ground structures would be located Zone within which required landscape would be located Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Listed buildings/structures
105.40
Notes :
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
N e w
B i + 101.12m c y c l e r a c k l o c a t i o n
M
P
e a n
l o w
w a t e r
Landscape Key :
Granite Plank paving 200mm wide varying in length
P
T h e
E m
C o n c r e t e
105.54
p a v e r s
b a n k m
Proposed new fenders Existing listed bollards relocated Proposed drop down/ removable bollards Proposed flush strip LED ground lighting
e n t
S te r et
+ 105.24m
5no. listed bollards relocated and spaced along new bike rack position
P
Sheet layout
at er m
an
+ 105.51m
P
Provision for solid fillet between new and existing river walls to reduce accumulation of river debris. Fillet to be added post construction if required 10m Cobbles to match existing slipway
Sheet 1
Sheet 2
10m
Scale 1:200 at A1 1:400 if reproduced at A3 + 106.08m + 105.67m Existing stone cobbles to be protected or removed during construction and re-instated. Existing timber fenders + 101.12m Location Retaining wall + 106.22m
INDICATIVE
Save for the layout of above ground structures which is illustrative
E x i s t G i r n a g s s
G a S rn l i i p e w ts a y E / es x d t i s r a t i w n g d c o o c b k b l e s
W a t e r m a n s G r e e n
+ 1 0 3 . 1 5 m
K e n i l w o r t h C o u r t
L o w e r R i c h m o n d R o a d
+ 105.03m
M e a n L o w
River Elev.
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
a t e r L e v e l
Keyplan:
This drawing
+ 101.12m
Existing stone cobbles to be protected or removed during construction and re-instated Existing timber fenders
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
E x i G si t r n a g s s
G r a n i t e s e t s E x i s S t l i i n p g w c a o y b / b D l e r a s w
Electrical and control kiosk to align with the existing adjacent stair height and wall. Roof to have brown roof and stone clad to match existing wall. Existing ventilation outlet from the arch to be maintained.
West Elev.
Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located
d o c k
+ 1 0 3 . 1 5 m
Interception chamber below bridge arch to capture existing CSO outlet Interception chamber ventilation column 6m high Retaining wall + 101.10m
+ 105.40m
a t e r m a n s G r e e n
E x i s t i n + 105.03m g g r a s s
Notes :
Existing emergency access to vaults to be maintained 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between
+ 107.65m
+ 109.24m
K e n i l w o r t h C o u r t
AA
P ut ne y
L o w e r R i c h m o n d R o a d
the Ordnance Survey base and the topographic survey base, both of which have been used
B rd i ge
+ 105.12m
Sheet layout
R i c h m
o n d
Sheet 1
Sheet 2
a n s i o n s
10m 0 10m
INDICATIVE
Save for the layout of above ground structures which is illustrative
Location
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
Electrical and control kiosk with brown roof. Height and stone finish to match existing wall Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.
Sheet 1
Sheet 2
10m
10m
S h i n g l e
ILLUSTRATIVE
N
M L W
M e a n H i g h W
a t e r
Location
Document Information
M
L W
St a r a n d
Section 48 publicity
R i v e r T h a m e s
6.5m
LB
A
S h i n g l e
H a r d
S48-PP-05X-PUTEF-000056
A
Proposed Section AA
July 2012
Me a n H ih g W
a t e r
Slipway
S hn ig l e
Hard
1 1
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan: 5 no. existing listed bollards relocated along Embankment footpath. See landscape plan for spacing
Ventilation column 4m minimum to 8m maximum high Local electrical and control kiosk high quality finish as signage 2.4m high above new foreshore level. Access via forehore structure level Bench seating
This drawing
Electrical and control kiosk with brown roof. Height and stone finish to match existing wall
Retractable bollards
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.
BRIDGE
Sheet layout
Sheet 1
Sheet 2
Connection tunnel
10m
10m
ILLUSTRATIVE
N
Location
Proposed Section AA
July 2012
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Putney Bridge CSO Access to disused WC Slipway /draw dock Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
Section cut through Putney Bridge
2011 Flood Defence Level 105.54
Putney Bridge
Watermans Green
Ventilation column 6m
Electrical and control kiosk with brown roof. Height and stone finish to match existing wall
Sheet 2
10m
Mean Tide Level 101.07
10m
Interception chamber
ILLUSTRATIVE
N
Section 48 publicity
N o r t h E l e v a t i o n
6.5m
LB
1 1
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Slipway / draw dock Keyplan:
This drawing
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
BRIDGE
Embankment
Sheet layout
Sheet 1
BRIDGE
Sheet 2
10m
Mean Tide Level 101.07
10m
ILLUSTRATIVE
N
6.5m
LB
N o r t h E l e v a t i o n
Section 48 publicity As existing and proposed River elevation sheet 2 of 2 Book of plans - section 6
S48-PP-05X-PUTEF-000059 July 2012
1 1
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Limit of survey
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes :
1. All dimensions and levels are approximate.
Putney Bridge
Watermans Green
Richmond Mansions
N
A C H
G N I E O VL S L T E T R E
A P P R
P U
TN
E Y
B R
Interception chamber
ILLUSTRATIVE
I D
Location
Section 48 publicity
es tE l ev at i on
E M B A N K M
E N T
L O W
E R
R I C H M O N D
R O A D
ST RE ET
EI M AR
TN
EY
HI GH
STR
EE T
PU
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
This drawing
1 0 1 . 1 9
1 0 4 . 2 3
1 0 4 . 3 5 1 0
1 1 0. 0 43 4 7 . 2 1
1 43 0 . 1 4 6 0 . 4 2 . 5 1 3
1 0 4 . 2 9
1 0 1 . 5 7
1 0 4 . 4 3
1 1 0 0 42 4 .6 . 1 3
1 0 4 . 3 5
Rounded edge to temporary cofferdam in river to reduce scour impact Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1 0 4 . 4 6
1 0 4 . 3 6 1 0 4 . 2 3
CL104.37 1 0 4 . 3 5
1 0 1 . 5 0
9 9 0. 14 2 0 0. 15
1 0 1 47 0 .8 4 . 9 0
1 0 4 . 1 4 0 0 4 . 2 5
1 0 4 . 2 9
1 0 52 .6 1 0 53 .4
P u t n e y P i e r
1 0 5 . 2 6
1 0 4 . 9 9 1 0 1 46 0 .4 4 . 7 3
6 3 . 23 4 . 0 4 1 10
1 0 4 . 4 8
1 0 58 .7 1 0 59 .7
CL104.94
1 0 58 .9
1 0 4 . 8 0
Key:
New river wall Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area
10 0. 70
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
E m
b a n k m
Barge on campshed
e n t
1 0 4 . 3 0 1 0 4 . 3 1
B rd i ge
S t a G r a n a d r t e r (
Existing public right of way Temporary working area Route of temporary diversion of right of way Site access Access / haul route
P H )
U nv M i r a es n s i int o y s
1 4 t o 2 7
10 6. 40
10 6. 42
10 6. 50
10 6. 44
S TR
ok cy eH os ue
M A TE R
A N
K e C ni w ou l o r rh t t
12 2
t o
10 1
PH
Kenilworth Court
1 8
1 0
0 .7 1 81
1 2
1 78 0 .2
ou r t
1 4
1 6
1 76 0 .8
1 76 0 .9
ou nt C
1 0
Po ss t
16
1 8
1 0
2 0
CL OS E
te re t
Pu STt n y RE e Hi ETgh S
R E E IG M KN S
2 6
ST RE ET
t br i g o 12 d e Ho 18 us e
UT NE YH I H G
EI MA R
2 8
Ca m
1 t o 9
3 1 t o 5 4
t o
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
3 1
1 2 a
3 2
3 3
1 t o 1 2
H Ga ) r t e
Stn 5S 104.366
1 0 4 . 7 9
1 0 4 . 7 2
1 0 4 . 6 8
1 0 4 . 7 6
1 0 6 . 3 0
1 0 4 . 3 8
P ut ne y
S t a r a n ( P d
1 0 4 . 3 1
3 5
LB
3 5 a
(UTT)
1 0 6 . 2 4
Existing sewers
1 0 6 . 2 5
1 0 4 . 6 3
E M
1 0 4 . 7 2
Stn 4S 106.360
B A N K M
1 0 4 . 9 3
Jack up barge servicing piling operations Cofferdam area not filled to flood defence level.
E N T
Piling rig
1 0 5 . 9 1
Notes :
1. These construction phasing plans have been
1 0 6 . 1 1
101.85
1 0 6 . 0 9
Posts
1 0 6 . 1 1
106.08
Stn 6S 105.538
15 1 0. 2
7 6 . 5 0 1
flow in the embankment to be altered to allow two-way traffic to site entrance from Lower Richmond Road
L O W
1 0 2 . 8 8
Shelter
103.69
1 0 2 . 4 2
submission and approval process. 2. Traffic management plans for construction Possible installation of foreshore reinforcement for scour protection Rounded edge to temporary cofferdam in river to reduce scour impact phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown Mean low water level
E R
R I C H L M o w O e N r D R i
Stn 3S 106.863
10 0
19 13
Existing boat slipway to be protected during construction, sections of localised demolition required
5 5 t o 7 8
c R h m O o A n D d R o a d
PC
103.68
1 0 7 . 4 7
1 0 7 . 6 4
R c M ih a m n s o i n o d n s
1 0 7 . 6 6
PH
96 7. 0 1
10m
40m
17 8. 10
Stn 2S 108.563
.1 82 0 1
8 0 0 . 1 8
ILLUSTRATIVE
Location
St Marys Church
R i v e r s i d e W
27
Shelter
Posts
32
PH
2 5 t o 3 0
c Thames Water Utilities Ltd 2008
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Rounded edge to temporary cofferdam in river to reduce scour impact Authorised channel Offices / welfare building
Keyplan:
1 0 4 . 2 8
1 0 1 . 1 9
Possible installation of foreshore reinforcement around pier supports for scour protection
This drawing
1 0 4 . 2 3
1 0 4 . 3 5 1 0
1 1 0. 0 43 4 7 . 2 1
1 43 0 . 1 4 6 0 . 4 2 . 5 1 3
1 0 4 . 2 9
1 0 1 . 5 7
1 0 4 . 4 3
1 1 0 0 42 4 .6 . 1 3
1 0 4 . 3 5
Permanent cofferdam
1 0 1 . 5 0
1 0 4 . 4 6
1 0 4 . 3 6 1 0 4 . 2 3
CL104.37 1 0 4 . 3 5
9 9 0. 14 2 0 0. 15
1 0 1 47 0 .8 4 . 9 0
1 0 4 . 1 4 0 0 4 . 2 5
1 0 4 . 2 9
1 0 52 .6 1 0 53 .4
P u t n e y P i e r
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1 0 5 . 2 6
1 0 4 . 9 9 1 0 1 46 0 .4 4 . 7 3
6 3 . 23 4 . 0 4 1 10
1 0 4 . 4 8
1 0 58 .7 1 0 59 .7
CL104.94
1 0 58 .9
1 0 4 . 8 0
Barge on campshed
Key:
Crane Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
E m
b a n k m
e n t
10 0. 70
1 0 4 . 3 0 1 0 4 . 3 1
B rd i ge
S t a G r a n a d r t e r (
Existing public right of way Route of temporary diversion of right of way Site access Access / haul route
P H )
U nv M i r a es n s i int o y s
1 4 t o 2 7
10 6. 40
10 6. 42
10 6. 50
10 6. 44
S TR
ok cy eH os ue
M A TE R
E E T
A N
K e C ni w ou l o r rh t t
12 2
t o
10 1
PH
Kenilworth Court
1 8
1 0
0 .7 1 81
1 2
1 78 0 .2
ou r t
1 4
1 6
1 76 0 .8
1 76 0 .9
ou nt C
1 0
Po ss t
16
1 8
1 0
2 0
ih g St re e t
CL OS E
Pu te n y H
R E E IG M KN S
2 6
t br i g o 12 d e Ho 18 us e
2 8
Ca m
1 t o 9
3 1 t o 5 4
t o
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
3 1
1 2 a
3 2
3 3
1 t o 1 2
H Ga ) r t e
Stn 5S 104.366
1 0 4 . 7 9
1 0 4 . 7 2
1 0 4 . 6 8
1 0 4 . 7 6
1 0 6 . 3 0
1 0 4 . 3 8
P ut ne y
S t a r a n ( P d
1 0 4 . 3 1
3 5
3 5 a
(UTT)
LB
1 0 6 . 2 4
Existing sewers
1 0 6 . 2 5
1 0 4 . 6 3
1 0 4 . 7 2
Crane Shaft
Stn 4S 106.360
1 0 4 . 9 3
Crane
1 0 5 . 9 1
Notes :
101.85
1 0 6 . 0 9
Stn 6S 105.538
7 6 . 5 0 1
Security office
1 0 3 . 9 8
may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls
1 0 3 . 3 8
1 0 2 . 8 8
Shelter
103.69
1 0 2 . 4 2
1 t o 2 4
L o w e r R i c h m o n d R o a d
Stn 3S 106.863
Possible installation of foreshore reinforcement beneath bridge arch for scour protection
submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where
79 t o 10 0
appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.
5 5 t o 7 8
103.68
4. Additional noise mitigation including noise barriers may be required but is not shown Mean low water level
1 0 7 . 4 7
1 0 7 . 6 4
R c M ih a m n s o i n o d n s
1 0 7 . 6 6
PH
96 7. 0 1
40m
17 8. 10
.1 82 0 1
ILLUSTRATIVE
Location
St Marys Church
R i v e r s i d e W
27
19 13
Shelter
Posts
32
PH
2 5 t o 3 0
c Thames Water Utilities Ltd 2008
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
This drawing
1 0 4 . 2 8
1 0 1 . 1 9
1 0 4 . 2 3
1 0 4 . 3 5 1 0
1 1 0. 0 43 4 7 . 2 1
1 43 0 . 1 4 6 0 . 4 2 . 5 1 3
1 0 4 . 2 9
1 0 1 . 5 7
1 0 4 . 4 3
1 1 0 0 42 4 .6 . 1 3
1 0 4 . 3 5
1 0 4 . 4 6
1 0 4 . 3 6 1 0 4 . 2 3
CL104.37 1 0 4 . 3 5
1 0 1 . 5 0
9 9 0. 14 2 0 0. 15
1 0 1 47 0 .8 4 . 9 0
1 0 4 . 1 4 0 0 4 . 2 5
1 0 52 .6 1 0 53 .4
P u t n e y P i e r
S h i n g l e
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1 0 5 . 2 6
1 0 4 . 9 9 1 0 1 46 0 .4 4 . 7 3
6 3 . 23 4 . 0 4 1 10
1 0 4 . 4 8
1 0 58 .7 1 0 59 .7
CL104.94
1 0 58 .9
1 0 4 . 8 0
Key:
Premanent cofferdam Limits of land to be acquired or used (LLAU) Hoarding
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
E m
b a n k m
e n t
10 0. 70
1 0 4 . 3 0 1 0 4 . 3 1
B rd i ge
S t a G r a n a d r t e r (
Workshop buildings / storage (open area or containerised) Excavated material storage and handling area
Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route
P H )
U nv M i r a es n s i int o y s
1 4 t o 2 7
10 6. 40
10 6. 42
10 6. 50
10 6. 44
S TR
ok cy eH os ue
M A TE R
E E T
A N
K e C ni w ou l o r rh t t
12 2
t o
10 1
PH
Kenilworth Court
Modifications required to existing pipework in underground vaults located beneath carriageway - see note 5.
1 8
1 0
0 .7 1 81
1 2
1 78 0 .2
ou r t
1 4
1 6
1 76 0 .8
1 76 0 .9
ou nt C
1 0
Po ss t
1 8
1 0
16
ih g St re e t
CL OS E
Pu te n y H
R E E IG M KN S
2 6
t br i g o 12 d e Ho 18 us e
2 8
Ca m
1 t o 9
3 1 t o 5 4
t o
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
3 1
1 2 a
3 2
3 3
1 t o 1 2
H Ga ) r t e
Stn 5S 104.366
1 0 4 . 7 9
Barge on campshed
1 0 4 . 7 2
1 0 4 . 6 8
1 0 4 . 7 6
1 0 6 . 3 0
1 0 4 . 3 8
P ut ne y
S t a r a n ( P d
1 0 4 . 3 1
3 5
3 5 a
(UTT)
LB
1 0 6 . 2 4
Existing sewers
1 0 6 . 2 5
1 0 4 . 6 3
1 0 4 . 7 2
Crane Shaft
Stn 4S 106.360
Sheet piles
1 0 4 . 9 3
1 0 5 . 9 1
Notes :
1. These construction phasing plans have been
1 0 6 . 0 9
Posts
Stn 6S 105.538
1 0 6 . 1 1
106.08
15 1 0. 2
7 6 . 5 0 1
Security office
1 0 3 . 9 8
may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls
1 0 3 . 3 8
Stn 1S 110.180
1 0 2 . 8 8
Shelter
103.69
1 0 2 . 4 2
1 t o 2 4
Crane
L o w e r R i c h m o n d R o a d
Stn 3S 106.863
H a r d
Possible installation of foreshore reinforcement beneath bridge arch for scour protection
on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
79 t o 10 0
27 19 13
PC
Rounded edge to temporary cofferdam in river to reduce scour impact Mean low water level
103.68
3. Utility supplies for the construction of the works would be agreed with the relevant utility company.
5 5 t o 7 8
Steps to be used for emergency access / egress to eastern end of Watermans Green
1 0 7 . 4 7
1 0 7 . 6 4
R c M ih a m n s o i n o d n s
1 0 7 . 6 6
PH
96 7. 0 1
Stn 2S 108.563
ILLUSTRATIVE
Location
St Marys Church
R i v e r s i d e W
Notes continued :
Church Square
4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Working area and draft limits of land to be
1 to 67
R i v e r s ie d W
Shelter
beneath carriageway. It is not proposed to close carriageway. 6. Existing flood defence levels to be maintained
2 5
2 5
at all times.
3 0
t o
c Thames Water Utilities Ltd 2008
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Keyplan:
Existing houseboat
1 0 4 . 2 8
1 0 1 . 1 9
1 0 4 . 2 3
1 0 4 . 3 5 1 0
1 1 0. 0 43 4 7 . 2 1
1 43 0 . 1 4 6 0 . 4 2 . 5 1 3
1 0 4 . 2 9
1 0 1 . 5 7
1 0 4 . 4 3
1 1 0 0 42 4 .6 . 1 3
1 0 4 . 3 5
1 0 1 . 7 0 1 0 4 . 3 1
1 0 4 . 4 6
1 0 4 . 3 6 1 0 4 . 2 3
CL104.37 1 0 4 . 3 5
1 0 1 . 5 0
9 9 0. 14 2 0 0. 15
1 0 1 47 0 .8 4 . 9 0
1 0 4 . 1 4 0 0 4 . 2 5
1 0 4 . 2 9
1 0 52 .6 1 0 53 .4
P u t n e y P i e r
S h i n g l e
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1 0 5 . 2 6
1 0 4 . 9 9 1 0 1 46 0 .4 4 . 7 3
6 3 . 23 4 . 0 4 1 10
1 0 4 . 4 8
1 0 58 .7 1 0 59 .7
CL104.94
1 0 58 .9
1 0 4 . 8 0
Key:
Limits of land to be acquired or used (LLAU)
S t a r M a n a d n G s i a o n r 1 e s tr t o
1 7
E m
b a n k m
Hoarding
e n t
10 0. 70
1 0 4 . 3 0 1 0 4 . 3 1
S t a G r a n a d r t e r (
P H )
P ut ne y
U nv M i r a es n s i int o y s
1 4 t o 2 7
10 6. 40
10 6. 42
t o 2 4
10 6. 50
10 6. 44
S TR
ok cy eH r os ue
A TE R M
E E T
A N
K e C ni w ou l o r rh t t
12 2
t o
10 1
PH
Kenilworth Court
1 8
1 0
0 .7 1 81
1 2
1 78 0 .2
ou r t
1 4
1 6
1 76 0 .8
1 76 0 .9
ou nt C
1 0
Po ss t
16
1 8
1 0
2 0
ih g St re e t
CL OS E
Pu te n y H
R E E IG M KN S
2 6
t br i g o 12 d e Ho 18 us e
2 8
Ca m
1 t o 9
3 1 t o 5 4
t o
t o
1 0
1 3 5 t o 1 4 6
1 2 3 t o 1 3 4
1 1
3 1
1 2 a
3 2
3 3
1 t o 1 2
S t a r a n ( P d
1 0 4 . 3 1
Route of temporary diversion of footway Site access Access / haul route Existing sewers
3 5
3 5 a
(UTT)
H Ga ) r t e
Stn 5S 104.366
1 0 4 . 7 9
1 0 4 . 7 2
1 0 4 . 6 8
1 0 6 . 3 0
LB
1 0 6 . 2 4
1 0 6 . 2 5
1 0 4 . 6 3
1 0 4 . 7 2
1 0 4 . 9 3
Shaft
Stn 4S 106.360
Access/haul route removed and foreshore reinstated Existing slipway uncovered and available for public use
1 0 5 . 9 1
S h i n g l e
101.85
1 0 6 . 1 1
1 0 6 . 0 9
Posts
Stn 6S 105.538
1 0 6 . 1 1
106.08
15 1 0. 2
7 6 . 5 0 1
1 0 4 . 8 5
Construction facilities removed, cofferdam piling and fill removed and foreshore reinstated
1 0 4 . 4 7
1 0 3 . 9 8
1 0 3 . 3 8
Stn 1S 110.180
L o w e r R i c h m o n d R o a d
Stn 3S 106.863
1 0 2 . 8 8
Shelter
103.69
1 0 2 . 4 2
H a r d
PC
5 5 t o Hoarding removed 7 8
103.68
R c M ih a m n s o i n o d n s
1 0 7 . 6 6
PH
96 7. 0 1
40m
17 8. 10
Stn 2S 108.563
8 0 0 . 1 8
ILLUSTRATIVE
Location
St Marys Church
R i v e r s i d e W
Shelter
Posts
32
PH
2 5 t o 3 0
c Thames Water Utilities Ltd 2008
s o u o o h H c t S a o B
22 1. 31 1. 10 10
e e r t b b u l a r C C t h a c i o B w s e ue l g u e l D l Ho o t k n C a a b o B u B l C C B g S n i H w e o g e R l l o C s g e l n s i o u K o o h H c t S a o B
11 4. 10 24 4. 10 13 4. 10 19 4. 10
86 3. 10
N
23 1. 28 10 1. 10
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
52 2. 10 48 2. 10
86 3. 10
5 8 . 3 0 1
13 4. 10
16 1. 33 10 1. 10
Keyplan:
16 1. 33 10 1. 10
56 2. 10
8 8 . 3 0 1
53 2. 10 14 1. 28 10 1. 10
21 4. 10 18 4. 10 58 2. 10
This drawing
5 1 . 1 32 0 . 1 1 0 1
n o d n g o n i L w o R b u l C
2 2 . 4 0 1
9 8 . 3 0 1
Stn 5A 104.227
56 2. 10
1 0 4 . 2 1
14 4. 10
0 9 . 3 0 1
12 1. 10 30 1. 10
46 2. 10
1 0 4 . 2 3
5 6 . 3 0 1 1 0 1 3 0 . 3 9 . 8 9 4
1 0 4 . 2 7
7 1 . 4 0 1
1 0 2 . 7 0
1 0 4 . 2 7
1 1 0 0 4 3 . . 1 9 0 8
CL104.26
1 0 1 . 7 0
Authorised channel
1 0 4 . 2 8
1 0 1 . 3 2
1 0 4 . 2 2
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
17 1. 10 24 1. 10
7 1 . 4 0 1
Posts
6 3 . 4 0 1
1 0 4 . 2 3
10 104 4. . 53 45 10 4. 10 50 4. 33
CL104.56
10 4. 44
4. 78 10 4. 65
104 104 . 4 . 5 54
10
104 . 81
10 4. 59
10 4. 76 104 . 85
104 . 95
25
4 0
1 0 4. 1 0 1 3 0 . 5 2
2 3
3 2
Be n d e me e rS te re t
1t R o1 u 5 v g Ma i y n n s i o n s
1 3
Gl e n d av ro nS te re t
2 a 8
2 8 b
1 2
2 8
Po ss t
6 2
5 6
2 1
5 4
5 0
4 8
e a d
1 5 0 0 1 5 .4 0 . 0 3
1 0 56 .4 1 0 55 .7
Th e Du k e ( PH sH
1 0 52 .6 1 0 53 .4
3 6
el a H lo ue s
2 t 5o 3 2
U nv M i r a es n s i int o y s
1 4 t o 2 7
1 4
8
1 0 6 . 1 1
3 1
Jh on
1 2 a
3 3
1o t8
1 t 7o 2 4
1 t o 1 2
3 5
3 5 a
Wawc ri k M ni as n os
TCB
S t a G r a n a d r t e r (
2 b
1 0 4 . 3 0 1 0 4 . 3 1
10 0. 70
3 7
4 3
4 9
5 1
5a 1
5 3
6 5
7 9
8 1
(H P )
8 5
H a l f Mo o H n oe tl
1 0 58 .7 1 0 59 .7
3 4
2 2
1 2
1 0 58 .9
1 1
2 0
9 3
46
1 0 4 . 2 0
1 0 4 . 2 4
1 0 4 . 1 1 0 8 4 . 0 5
7 2 . 4 0 1
Key:
Limits of land to be acquired or used (LLAU) Hoarding
1 0 4 . 4 2
1 0 4 . 1 9
1 0 4 . 2 8
1 0 4 . 2 4
1 0 4 . 2 3 1 0 4 1 . 2 0 1 4 . 0 5
1 0 0 . 8 1
CL104.49
6 2 . 4 0 1
1 0 4 . 2 7
1 0 4 . 2 0
1 10 0 4 4 . . 38 4 8
1 0 4 . 5 1
1 0 4 . 2 4
1 0 4 . 1 2 0 1 4 . 0 6
1 0 4 . 3 0
1 0 4 . 5 4
Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route
9 2 . 4 0 1
1 44 0 .1 1 45 0 .2
34
3 2
1 0 4 . 4 4
1 0 4 . 4 5
1 0 4 . 2 1 2 0 4 . 0 7
3 3 . 4 0 1
1 0 4 . 2 8
1 0 4 . 2 4
1 0 4 . 4 4
1 0 4 . 1 2 0 2 4 . 0 6
1 0 4 . 2 9
CL104.40
2 3 . 4 0 1
Stn 3A 104.207
1 0 4 . 3 1
Existing moorings to be temporarily suspended during temporary slipway construction and removal.
1 8 . 2 0 1
Stn DL1 104.259
1 0 4 . 1 1 0 8 4 . 0 6
4 4 . 4 0 1
9 2 . 4 0 1
1 0 4 . 0 1 2 0 4 . 0 2
CL104.45
Notes :
1 0 3 . 9 9
1 0 4 . 4 2
3 3
7 2 . 4 0 1
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction
0 4 . 4 0 1
2 2
2 3
4 2 . 4 0 1
0 4 . 3 0 0 1 1 . 4 0 1
0 0 . 4 4 0 9 . 1 3 0 1
1 0 2 1 . 0 8 4 5 . 2 0 1 0 4 . 2 7
1 0 1 . 6 5 1 0 1 . 5 8
Boat Builders
1 0 4 . 4 2
1 0 4 . 2 8 1 0 1 . 3 8
Temporary boat slipway would be constructed prior to commencement of works at Putney Bridge site. Temporary slipway would be removed after works at Putney Bridge have finished.
1 0 4 . 2 8 1 0 1 . 1 1
7 3 . 4 0 1 7 3 . 4 0 1 6 2 . 4 0 1
8 0 . 4 0 0 0 . 1 4 0 1
1 0 4 . 2 9
1 0 4 . 2 3 1 0 4 . 2 3
1 0 4 . 4 1
1 0 4 . 1 1 0 6 4 . 0 7
1 2
1 0 4 . 2 9
1 0 4 . 4 6
1 0 4 . 1 1 5 0 4 . 0 8
Stn 2A 104.241
appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
1 0 4 . 2 0
1 0 0 . 8 9
1 0 4 . 1 1 5 0 4 . 0 8
1 0 4 . 3 0
1 0 4 . 1 7
1 0 4 . 4 5
1 0 4 . 1 1 0 4 4 . 0 6
would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
1 3
3 1
3 2
1 0 4 . 2 7
1 0 4 . 1 1 6 0 4 . 0 9
1 0 4 . 4 4
1 0 0 . 8 3
on this drawing.
1 0 0 . 8 4
1 0 4 . 2 9
1 0 4 . 4 1
0 4 . 1 1 6 0 4 . 1 0
1 0 4 . 2 1
1 0 4 . 2 8 1 0 0 . 9 3
R u v i g n y G ad re n s
1 0 4 . 3 1
1 0 1 4 0 . 1 4 5 . 0 9
Delivery vehicle access point Delivery vehicle unloading area Parking bay suspensions, footway diverted into parking bays.
1 0 4 . 4 4
1 0 4 . 2 8
1 0 0 . 8 1
1 0 4 . 3 0
1 0 4 . 4 5
0 4 . 1 1 7 0 4 . 0 8
1 0 1 . 1 7
1
1
1 0 4 . 4 9
1 0 4 . 3 5
1 0 4 . 3 1 0 0 4 . 0 8
1 0 4 . 3 5
1 0 1 4 0 . 4 3 . 5 1 8
1 0 4 . 2 8
Stn 1A 104.351 1 0 4 . 3 6 1 0 4 . 2 1
1 0 4 . 4 5
1 0 1 . 1 9
1 0 4 . 6 5
1 0 4 . 2 3
1 0 4 . 3 5
1 0 1 43 0 . 1 4 6 0 . 4 2 . 5 1 3
6 7 0. 14
1 0 4 . 5 7
1 1 0. 0 43 4 7 . 2 1
1 0 4 . 2 9
1 0 1 . 5 7
1 0 4 . 6 1 4 0 4 . 7 4
1 0 4 . 4 3
Dolphin
1 1 0 0 42 4 .6 . 1 3
10m
40m
1 0 4 . 3 5
1 0 1 . 7 0 1 0 4 . 3 1
.9 46 1 0 48 1 0 . 1
1 0 1 49 0 .0 4 . 4 1 7 0 4 . 9 4
MOP
4 . 3 6 1 0 4 . 2 3 1 0
CL104.37 1 0 4 . 3 5
1 0 4 . 4 6
1 0 1 . 5 0
6 3 . 23 4 . 0 4 1 10
1 0
9 9 0. 14 2 0 0. 15
1 0 1 47 0 .8 4 . 9 0
1 0 4 . 1 4 0 0 4 . 2 5
1 0 4 . 2 9
1 0 5 . 2 6
1 0 4 . 9 9 1 0 1 46 0 .4 4 . 7 3
1 0 4 . 4 8
CL104.94
1 0 4 . 8 0
E m
Constitutional Club
Lw r i m n R a o e Rc o d o d h
e S n t t a r a M n a d n G s i a o n r 1 e s tr t o
1 7
b a n k m
ILLUSTRATIVE
Location
P H )
S t a r a n ( P d
1 0 4 . 3 1
Section 48 publicity
Stn 5S 104.366
H Ga ) r t e
1 0 4 . 7 9
1 0 6 . 3 0
LB
1 0 6 . 2 4
1 0 6 . 2 5
E M
Stn 4S 106.360
B A N K M
July 2012
E N T
1 0 5 . 9 1
3 3
1 3
1 0 6 . 1 1