Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

CJC 42000

HB 100 2000

This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

COORDINATION OF POWER AND TELECOMMUNICATIONS


Manual for the establishment of safe work practices and the minimization of operational interference between power systems and paired cable telecommunications systems

CJC 42000
HB 100 2000

This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

COORDINATION OF POWER AND TELECOMMUNICATIONS


Manual for the establishment of safe work practices and the minimization of operational interference between power systems and paired cable telecommunications systems

This Publication was prepared jointly for Telstra Corporation Limited, and the Electricity Supply Association of Australia and has been approved by both these bodies. It was published by Standards Australia on 8 February 2000.

Review of this Publication Suggestions for improvement to this Publication, addressed to the head office of Standards Australia, are welcomed. Notication of any inaccuracy or ambiguity found in this Publication should be made without delay in order that the matter may be investigated and appropriate action taken.

This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

COORDINATION OF POWER AND TELECOMMUNICATIONS

This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

Manual for the establishment of safe work practices and the minimization of operational interference between power systems and paired cable telecommunications systems

First published as HB 100 2000 (CJC 4).

COPYRIGHT
Standards Australia International All rights are reserved. No part of this work may be reproduced or copied in any form or by any means, electronic or mechanical, including photocopying, without the written permission of the publisher. Published by Standards Australia International Ltd PO Box 1055, Strathfield, NSW 2135, Australia
ISBN 0 7337 3054 X

ii

PREFACE

This Manual was prepared for Telstra Corporation (formerly Telecom Australia) and the Electricity Supply Association of Australia (ESAA) under the auspices of the Joint Committee for Coordination of Power and Telecommunications (CJC), as a basis for coordination where the activities of these bodies co-exist. Subsequently, CJC was reestablished within Standards Australia as the Coordinating Committee for Power and Telecommunications (CCPT) (see Section 3.2.2). However, Telstra and member bodies of ESAA are not bound to accept the contents of this Manual in their work practices or procedures. It is acknowledged that different practices from those described may be equally satisfactory depending on site circumstances.
This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

Although this Manual was written at the time when Telstra was the sole telecommunications supplier, the principles set out herein could be equally applicable to any copper-based telecommunications system. This Manual recognises the deregulation of Australias telecommunications sector. In July 1997, AUSTEL was merged with the Spectrum Management Agency to form the Australian Communications Authority (ACA). See ACA website (http://www.aca.gov.au) which gives details of their involvement in the increasingly self-regulated communications sector. Unlike previously, the Telecommunications Act 1997 empowers ACA to adopt Standards based only on four specic criteria: the protection of personal health and safety; network integrity; interoperability; and access to emergency services. Accordingly, many AUSTEL Technical Standards were reframed as ACA Technical Standards to eliminate matters not covered by ACA. Nevertheless, AUSTEL TS 009 1997, Installation Requirements for Customer Cabling (Wiring Rules), obtainable from Standards Australia, remains valid. Attention is drawn to ACA TS 001 1997, Safety requirements for Customer Equipment, which species principles of isolation and lists abbreviations for terms dened in AUSTEL TS 009. This Manual makes reference to publications prepared jointly by ESAA and the Australian Telecommunications Commission (ATC) (subsequently Telecom Australia, now Telstra Corporation). Enquiries concerning these publications should be directed to one of the following bodies: Electricity Supply Association of Australia Limited PO Box 2537 SYDNEY NSW 2001 National Power Coordination Telstra Corporation 1/355 Spencer Street WEST MELBOURNE VIC 3003

This edition does not cover coordination aspects of recent developments in broadband telecommunications, or cable television. These matters will be considered for inclusion in a future edition. Referenced documents, Standards and other references are listed in Section 12.

iii

SECTIONS

1 2 3

INTRODUCTION PURPOSE, PLAN AND USE OF MANUAL AUSTRALIAN ORGANIZATION AND IMPLEMENTATION OF COORDINATION THE AUSTRALIAN POWER AND TELECOMMUNICATIONS NETWORKS, DESIGN AND DEVELOPMENTS JOINT PROJECT GROUPS AND ISSUES ELECTRICAL AND PHYSICAL INTERACTIONS BETWEEN POWER AND TELECOMMUNICATIONS PLANT RECOMMENDED PRACTICES FOR SHARED PLANT AND CROSSINGS LIMITING EFFECTS OF POWER SYSTEM FAULTS LIMITING NOISE INTERFERENCES COORDINATION AT CUSTOMER PREMISES AND ON PRIVATE PROPERTY ESAA/TELSTRA LIAISONS WITH STANDARDS AND REGULATORY BODIES CODES, GUIDES, TEXTS, STANDARDS AND PAPERS

4
This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

5 6

7 8 9 10

11

12

This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

iv

NOTES

SECTION 1: INTRODUCTION
SECTION CONTENTS

1.1 1.2 1.3 1.4


This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

History Management Responsibility Top Management Support Costs Why is 1.5.1 1.5.2 1.5.3 1.5.4 1.5.5 1.5.6 Coordination Necessary? General Direct Contact Indirect Interaction between Power and Telstra Plant Limits for LFI and EPR Voltages, and EPR Hazard Zones Visual Pollution and Conservation of Footpath Space Summary

1.5

1.6

Future of the Coordination Process

This is a free preview. Purchase the entire publication at the link below:

This is a free 8 page sample. Access the full version at http://infostore.saiglobal.com.

HB 100-2000 (CJC 4), Coordination of power and telecommunications - Manual for the establishment of safe work practices and the minimization of operational interference between power systems and paired cable telecommunications systems

Looking for additional Standards? Visit SAI Global Infostore Subscribe to our Free Newsletters about Australian Standards in Legislation; ISO, IEC, BSI and more Do you need to Manage Standards Collections Online? Learn about LexConnect, All Jurisdictions, Standards referenced in Australian legislation Do you want to know when a Standard has changed? Want to become an SAI Global Standards Sales Affiliate? Learn about other SAI Global Services: LOGICOM Military Parts and Supplier Database Metals Infobase Database of Metal Grades, Standards and Manufacturers Materials Infobase Database of Materials, Standards and Suppliers Database of European Law, CELEX and Court Decisions

Need to speak with a Customer Service Representative - Contact Us

You might also like