NAIAX For PQ Conference - As of Aug. 10, 2012 - Upload Version
NAIAX For PQ Conference - As of Aug. 10, 2012 - Upload Version
The Project
The NAIA Expressway: Phase I Adjustment Works Phase II Works Additional Works Access Roads: At-Grade Entertainment City Works
Development Impact
1. Provide improved quality of service at both the elevated toll road and the at-grade free roads around the airport 2. Supports tourism by providing fast and reliable access to the NAIA Terminals and PAGCOR Entertainment City 3. Supports the governments PPP Program 4. Potential PPP Model for additional private participation / support for infrastructure
Phase II Works
Design and construction of approximately 4.83 km 4-lane viaduct extension; Design and construction of a minimum of 6 on and 6 off ramps to NAIA Terminals 1, 2 and 3 and other strategic locations; Design and construction of two connection ramps to link Roxas Blvd., Macapagal Blvd. and Entertainment City on-off ramps to and from NAIA Terminals 1 and 2 on-off ramps; Design, construction and provision of toll plazas, toll operating equipment and safety facilities; Reconstruction and widening of affected at-grade public roads.
approximately 1.72 km 6 to 8-lane at-grade roads 300 meter 2-lane service road w/in the Entertainment City 500 meter 4-lane access road connecting New Seaside Drive to Macapagal Boulevard
Construction to be based on the design specs to be provided; the maintenance and operations of this section shall be turned over to the Government upon completion.
Traffic Situation
At peak-hours
Travel time from Makati or Manila CBD takes at least one hour
About 36,391 vehicles currently pass through these roads every day
Traffic volume along this corridor is expected further increase as Entertainment City becomes operational in 2013 onwards and as more tourists visit the country as a result of a more aggressive tourism campaign by Government.
PPP Structure
The Concessionaires obligations/rights:
Finances, designs and constructs the NAIAX Phase II Works Finances and constructs the At-Grade Entertainment City Works Finances and conducts the NAIAX Phase I Adjustment Works Undertakes O&M of the entire NAIA Expressway (Phase I&II) Undertakes future periodic maintenance, repairs and renewals Assumes traffic risk Receives toll fees
PPP Structure
The Governments obligations:
Turns over possession of existing Phase I (upon issuance of TOC) Acquires and delivers all required ROW Ensures application of periodic toll adjustments
PROJECT TERMS
*Other costs include contingencies, consultancy costs, insurance, and financing costs, among others.
Timetable
Milestone PQ Conference PQ Submission Identification of Pre-Qualified Bidders / Issuance of Bid Documents to Pre-Qual. Bidders Bid Conference Bid Submission Issuance of Notice of Award At-Grade Entertainment City Works Completion Partial Construction Completion (T1/T2 to Roxas/Macapagal/Entertainment City) Construction Completion Target Date 10 August 2012 18 September 2012
1Q 2015
1Q 2016