Initial situation: Seasonal fluctuation (between 14 and 20 barg) in gas delivery to major consumers especially in summertime was causing significant production losses for OMV Petrom, due to the pressure increase in the National Transport System. Project Objective: The new Hurezani Gas Delivery System will ensure OMV Petrom to deliver gas continuously to National Transport System with a constant pressure of 40barg.
03/02/2011 |
Front End Engineering Design (Feed) Completion Basic Engineering Detail Engineering Authority Engineering Site Clearance from underground pipes & facilities Procurement, (Turbo Compressor packages provided by OMV Petrom) Construction Commissioning Two (2) months operation assistance Maintenance Contract for 8 months
03/02/2011 |
03/02/2011 |
03/02/2011 |
Station Configuration:
Design pressure: Operating pressure: Capacity, normal Capacity, max. Capacity, min. Capacity per train 64 barg 45 barg 5.500.000 Ncm/d. 6.050.000 Ncm/d 1.200.000 Ncm/d 2.750.000 Ncm/d
03/02/2011 |
03/02/2011 |
03/02/2011 |
03/02/2011 |
03/02/2011 | 10
03/02/2011 | 11
03/02/2011 | 12
TUCOs on foundation
03/02/2011 | 13
03/02/2011 | 14
03/02/2011 | 15
03/02/2011 | 16
03/02/2011 | 17
03/02/2011 | 18
03/02/2011 | 19
03/02/2011 | 20
03/02/2011 | 21
75 m high flare
03/02/2011 | 22
03/02/2011 | 23
03/02/2011 | 24
03/02/2011 | 25
Control Room
03/02/2011 | 26