Professional Documents
Culture Documents
Operation Drilling Daily Report1
Operation Drilling Daily Report1
DD /M /Yr
Operator Well Name Latitude Rig Type / Name Rig Power KB Elevation Current MD Progress MD PTMD Spud Date Release Date Planned Days Days from Spud 24 Hours Summary 24 Hours Forecast Time hh:mm End General Land Rig HP M M M M Type Contractor Field Longitude Avg WOB Avg ROP Avg RPM Torque Stand Pipe Press Flow Rate String Weight Rotating Weight Total Drilling Time Circulating Press Drilling Parameters klbs ft/hs lb.ft Psi gpm lbs lbs hrs AFE Number AFE Cost Daily Cost Cum. Cost Daily Mud Cost Cum. Mud Cost Day Supervisor Night Supervisor Engineer Geologist Rpt. # Env. WD AFE US US US US US 1 Onshore 20.5 M
psi
Time Breakdown Task P NPT
Start
Elapsed
Length M
Category
Code
Operation
Bit Record Bit - 1 Bit Number Bit Size Bit Run Manufacturer IADC Code Jets Serial # Depth Out Depth In Footage Bit Hours TFA Dull Grade Footage Bit Hours ROP in
Bit - 2
Length ft
Last Size Set MD Next Size Set MD Last FIT EMW TOL Start Lost Surface Lost DH Dumped Built Ending
in ft ft ft hrs in2 Cumulative ft hrs ft/hrs 1 2 Drilling Fluid 3 Solids Sand Water Oil HGS LGS LTLP HTHP Cake E Stb PF MF PM ECD UOM Received % % % % % % ml ml mm V Mud Additive 1 2 3 Type Amount
Casing in ft in ft ppg ft Mud Volumes bbl bbl bbl bbl bbl bbl Gas unit
Max. Gas Conn. Gas Trip Gas Back Gas Hydraulic Analysis Annular Velocity Pb Sys HHP HHPb HSI %psib Jet Velocity Impact force IF/area ft/min psi hp hp/in2 % ft/sec lbs lb/in2 #DIV/0!
Mud Type Time MW in MW out Temp in Temp out Pres. Grad Visc PV YP Gels 10 sec Gels 10 min Fluid Loss pH Type DRY DRY DRY DRY DRY DRY DRY LIQUID LIQUID LIQUID DRY DRY DRY DRY Stop Cards
mL/30min
Material Name
HSE Safety Flag LTA Spill Incident H2S Test HSE Mtg Type Directional Survey MD (ft) Kick-Trip Kick-Drill Comments Fire
Accidents/Incidents Time
MD (ft)
Incl. (deg)
Azm (deg)
MD (ft)
Incl. (deg)
Azm (deg)
MD (ft)
Incl. (deg)
Azm (deg)
Personnel Company PT.Baroid PT.Halliburton CMT PT.Geolog PT.TSE People 2 5 6 2 Company People Time Slow Speed? Depth Strokes Pressure Liner Size Efficiency Pump Name hh:mm y/n ft SPM psi in % Weather Barometric Pres (atm)
BPMIGAS Standart Report
Pumps
Chill Factor
Visibility (mile)
Total Cost
26808.23