Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Daily Operations Report

DD /M /Yr
Operator Well Name Latitude Rig Type / Name Rig Power KB Elevation Current MD Progress MD PTMD Spud Date Release Date Planned Days Days from Spud 24 Hours Summary 24 Hours Forecast Time hh:mm End General Land Rig HP M M M M Type Contractor Field Longitude Avg WOB Avg ROP Avg RPM Torque Stand Pipe Press Flow Rate String Weight Rotating Weight Total Drilling Time Circulating Press Drilling Parameters klbs ft/hs lb.ft Psi gpm lbs lbs hrs AFE Number AFE Cost Daily Cost Cum. Cost Daily Mud Cost Cum. Mud Cost Day Supervisor Night Supervisor Engineer Geologist Rpt. # Env. WD AFE US US US US US 1 Onshore 20.5 M

psi
Time Breakdown Task P NPT

Start

Elapsed

Measured Depth Start End

Length M

Category

Code

Operation

Bit Record Bit - 1 Bit Number Bit Size Bit Run Manufacturer IADC Code Jets Serial # Depth Out Depth In Footage Bit Hours TFA Dull Grade Footage Bit Hours ROP in

Bit - 2

BHA Number Componen

BHA - 1 1 BHA Run OD in

BHA Number Length ft Componen

BHA - 2 BHA Run OD in

Length ft

Last Size Set MD Next Size Set MD Last FIT EMW TOL Start Lost Surface Lost DH Dumped Built Ending

in ft ft ft hrs in2 Cumulative ft hrs ft/hrs 1 2 Drilling Fluid 3 Solids Sand Water Oil HGS LGS LTLP HTHP Cake E Stb PF MF PM ECD UOM Received % % % % % % ml ml mm V Mud Additive 1 2 3 Type Amount

Casing in ft in ft ppg ft Mud Volumes bbl bbl bbl bbl bbl bbl Gas unit

Max. Gas Conn. Gas Trip Gas Back Gas Hydraulic Analysis Annular Velocity Pb Sys HHP HHPb HSI %psib Jet Velocity Impact force IF/area ft/min psi hp hp/in2 % ft/sec lbs lb/in2 #DIV/0!

Mud Type Time MW in MW out Temp in Temp out Pres. Grad Visc PV YP Gels 10 sec Gels 10 min Fluid Loss pH Type DRY DRY DRY DRY DRY DRY DRY LIQUID LIQUID LIQUID DRY DRY DRY DRY Stop Cards

HH:MM ppg ppg degF degF psi/ft sec cP lbf/100ft2

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

mL/30min

ppg Consumed Bulk Material Returned Adjust Ending

Material Name

HSE Safety Flag LTA Spill Incident H2S Test HSE Mtg Type Directional Survey MD (ft) Kick-Trip Kick-Drill Comments Fire

Accidents/Incidents Time

MD (ft)

Incl. (deg)

Azm (deg)

MD (ft)

Incl. (deg) Azm (deg)

Incl. (deg)

Azm (deg)

MD (ft)

Incl. (deg)

Azm (deg)

Personnel Company PT.Baroid PT.Halliburton CMT PT.Geolog PT.TSE People 2 5 6 2 Company People Time Slow Speed? Depth Strokes Pressure Liner Size Efficiency Pump Name hh:mm y/n ft SPM psi in % Weather Barometric Pres (atm)
BPMIGAS Standart Report

Pumps

Temperature (degF) High Low

Chill Factor

Wind Speed (knot) Direction (deg)

Sea Condition Wave Height (ft) Current Speed (knot)

Road Condition Wet

Visibility (mile)

Total Cost

26808.23

Solar Equip Rental others

You might also like