Professional Documents
Culture Documents
Identif Acation
Identif Acation
ADENTIFY DENGER,ASSESSMENT OF RISK AN OPERATION OF RISK TEHE PROJECT FOR ENHANCEMENT OF VASSEL TRAFFIC SYSTEM IN MALACCA AND SINGAPORE STRAITS IN INDONESIA
NO AKTIVITY LOCATION DANGER DESKRIPSI RISK EARLY CONSEQUENCE LEGAL ABILITY HARD YES/NO a b Pain by force of is medical 1 2 TOTAL CONTROL EARLY axb 2 - Vehicle park wide of or determinad - crene tower or forklift have to be useworthy or certificate - crene tower operator or forklift have to competence - location acceptance of material in barricade - attached by string for controller RISK REMAINS ABILITY HARD TOTAL ADDITONAL CONTROL a b axb - there is loading certificate test from the crene tower , if bigger payload 5 ton 1 2 2
Site
Gas cutting
Site
UU No. 1/1970
- inspection to regulator tube and pipe periodical - personel wear APD - work location have to in place which have been determined
1 1
1 1
1 1
- and moment pipe will be used - one who are no entrance unconcerned in
Asasembling Site
- jam in
- handicap
- giving competent isolator -appropriate location in place -personnel wear APD , -adequate appliance
Welding
OHSAS 4:03:01
1 3
3 2
3 6
1 1
1 1
1 1
ADENTIFY DENGER,ASSESSMENT OF RISK AN OPERATION OF RISK TEHE PROJECT FOR ENHANCEMENT OF VASSEL TRAFFIC SYSTEM IN MALACCA AND SINGAPORE STRAITS
NO AKTIVITY LOCATION DANGER IN INDONESIA DESKRIPSI RISK EARLY CONSEQUENCE LEGAL ABILITY HARD YES/NO a b TOTAL CONTROL EARLY axb - personnel wear APD - check welding electrode - work location as determined - personnel wear APD - welding electrode cheque - work location as determined - personnel wear APD - welding electrode cheque - platform tide - wearing belt safety RISK REMAINS ABILITY HARD TOTAL ADDITONAL CONTROL a b axb
- fallen down
site
- fallen down
- handicap / dead
- doorstep tide - personnel wear APD - Tide Fringe fringe - location determined
Ginding
Site
- short current link - millstone break to hit personnel , - sprinkling of fire concerning body - dirt breathed in personnel .
1 2 3 3
3 3 2 1
3 6 6 3
- check konektor+ power cable - chosening the quality of good millstone. - personnel wear APD -determination of work location - personnel wear APD 1 1 1
lifting
site
- lifting cell sling control. - installing sling truly. - personnel wear APD - fringe tide in workarea - [is] attached controller string.
ADENTIFY DENGER,ASSESSMENT OF RISK AN OPERATION OF RISK TEHE PROJECT FOR ENHANCEMENT OF VASSEL TRAFFIC SYSTEM IN MALACCA AND SINGAPORE STRAITS
NO AKTIVITY LOCATION DANGER IN INDONESIA DESKRIPSI RISK EARLY CONSEQUENCE LEGAL ABILITY HARD YES/NO a b - pain by force of medical 1 1 1 1 2 2 2 2 TOTAL CONTROL EARLY axb 2 2 2 2 - guidance before doing work of bolt torsi. - appliance in fastening with string. - personnel wear APD - wear scafolding with wheel locked. RISK REMAINS ABILITY HARD TOTAL ADDITONAL CONTROL a b axb 1 1 1 1 1 1 1 1 1 1 - location given by fringes 1 1 - location given by line safety.
Bolt torsi
Site
Touch up
- handicap / dead
PREPARED BY
APPROVED BY
HASAN Director