Professional Documents
Culture Documents
2008 - 07 - 04 - Column
2008 - 07 - 04 - Column
The Environmental Assessment (EA) for widening Campeau Drive from Didsbury to March has now been completed and is available in both Kanata libraries and the Client Service Centre for review. You can make written comments on the proposal to the consultant and to the City of Ottawa as detailed in the proposal (or contact my office for details). If concerns cannot be resolved with the City you can request that the Minister of the Environment make a Part II Order, which requests that a more detailed evaluation be undertaken. The Minister must receive such a request by July 21. If no Part II Order requests are received the project will proceed, providing that funding is available, with design and construction as shown in the EA. As funding for roadwork is tight Ive been told that the first sectioned widened will be from Kanata Ave. to Didsbury with the remainder not proceeding for some time. The Transportation Master Plan that is presently being reviewed as part of the Official Plan will present the priorities for construction for the next 20 years (updated every 5 years). When it is approved in 2009 we will have more information on the timing of this widening as well as timing for construction of other roads such as completion of Terry Fox and the Goulbourn Forced Road.
The third part of the motion was referred to the City Manager to work with all 33 branches to immediately undertake measures to reduce usage of fuel and other petroleum based products with an overall goal to reduce usage by at least 25%. He will be reporting back on a quarterly basis on the fuel savings that have been achieved and on those that will be implemented in the next quarter.