InterPSS Editor User Guide - English - Edition
InterPSS Editor User Guide - English - Edition
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
This guide will walk you through InterPSS installation process. It also outlines key administration steps to maintain InterPSS user data.
Links InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
Contents
1 Download InterPSS Release 2 Install InterPSS on Windows 2.1 Check Java installation 2.2 Unzip Installation File 2.3 Install InterPSS 2.4 Locale&UI Issue 3 Test InterPSS Installation 4 Install InterPSS Development Release 4.1 Full Development Release Installation 4.2 Apply Dev Release Patch 5 Document/Data Version Control/Backup
1 of 5
12/11/2007 6:01 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
C:\>java -version java version "1.6.0" Java(TM) SE Runtime Environment (build 1.6.0-b105) Java HotSpot(TM) Client VM (build 1.6.0-b105, mixed mode)
Make sure that your Java version is "1.6.0" or above. If you do not have Java on your computer, please go to SUN Java Distribution Site (http://www.java.com/en/download/manual.jsp) to download Java JDK 6.0 and install it to your computer.
Install InterPSS
Double-click or run the install.bat file, distributed in the zip file, to install InterPSS. You may need to modify the install.bat, if your Java installation is not in your Path.
2 of 5
12/11/2007 6:01 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Ipss/User Workspace : You have option not to install Ipss/User Workspace (Ipss Workspace + Ipss/User Database Files). If you already have an existing InterPSS installation, and have existing projects in the Ipss/User Workspace, we recommend you do not install Ipss/User Workspace by un-check Ipss Workspace and Ipss/User Database Files. Otherwise, your existing files in the Ipss/User workspace directory and data in the User database will be overwritten by the new installation. Sample Workspace : You have option not to install Sample Workspace (Sample Workspace + Sample Database Files). InterPSS Sample Workspace includes latest InterPSS samples. We recommend install with each new release. Grid Computing Library : Library for InterPSS Grid Computing solution. This is for more advanced users to perform power system simulation in a network of many computers. There is no need to install the library if you only perform your simulation on your desktop PC only.
After completing the installation successfully, you should see an InterPSS desktop icon and an InterPSS program menus, as shown in the above diagram.
Locale&UI Issue
Currently InterPSS has only been tested on English locale (en). Some users have reported issues when running in other locale systems. For example, in Spanish locale, ',' instead of '.' is used for decimal point in Java UI. A temporary solution could be used to solve the problem, as follows:
3 of 5
12/11/2007 6:01 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
After the installation, in the installation root directory (where you can find ipss_edtior.jar), create a batch file, for example run.bat, with following content:
start javaw -Duser.language=<your locale> -jar ipss_editor.jar
4 of 5
12/11/2007 6:01 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
This page was last modified 18:42, 14 October 2007. Content is available under GNU Free Documentation License 1.2.
5 of 5
12/11/2007 6:01 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS Graphic Editor User Guide InterPSS provides a graphic editor for user to draw One-line diagram and enter study case data. Currently it has basic
functions to create a simple power system one-line diagram, input data, perform analysis and generate analysis reports. The one-line diagram and data can be saved into a file and then reloaded into the editor for further analysis. Links InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
Contents
1 InterPSS Graphic Editor 2 InterPSS Workspace 3 Create InterPSS Project 4 Edit One-line Diagram 5 InterPSS Network Model 5.1 Network Object (Network JavaAPI) 5.2 Bus Object (Bus JavaAPI) 5.3 Branch Object (Branch JavaAPI) 6 Run Analysis 6.1 Custom Run Scripting 7 Analysis/Simulation Result 7.1 Result Annotation 7.2 Plot Transient Stability Simulation Result 7.3 Generate Report 8 Import Existing Project 8.1 Import InterPSS Project 8.2 Import Custom Data File 9 Getting Help 10 Debug InterPSS
1 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS organizes projects under its workspace. You can hide/resume workspace/project explorer, as follows:
2 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
The One-line diagram can be exported as PDF, SVG and other formats.
InterPSS Workspace
InterPSS uses computer file system and an internal database to persist its documents. These documents are organized under the workspace concept. Currently InterPSS supports two workspaces: 1) Ipss/User Workspace; and 2) Sample Workspace.
3 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Ipss Workspace : For user projects. We recommend you put all your actual projects in this workspace. When you perform a new InterPSS release installation, you have the option to keep this workspace untouched. Sample Workspace : For InterPSS samples. This workspace will be constantly modified/updated by the InterPSS development team with new samples to showcase InterPSS feature. We should only put your temporary data, for example testing cases, in the workspace. You can make switch between these two workspace by click the Select Workspace/* Workspace menu item freely without need to exit InterPSS.
Under a workspace, projects are organized into project folders. Project related documents, such as reports, scripts, are put under the parent project. As a user, you do not need to worry about how documents are internally organized and stored. We do not recommend to make any change to the document file structure.
4 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
To create a new InterPSS project into, for example, MyFolder, right click the project folder, and select Add InterPSS Graphic File, as follows:
Enter project name : MyProject and click OK. At this time you can also create project based on an existing project, see more in the late section on how to import an existing project into InterPSS.
After clicking the OK button, the InterPSS project data editor dialog box will automatically popup.
Enter necessary project info and click Save to complete the new project creation process. You should see the new project listed in your workspace.
5 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Using the graphic drawing tools, one can quickly create a power network, such as the one showing in the following diagram:
6 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
The "InterPSS Graphic Editor User Tips" (http://host.interpss.org/GraphicEditorUserTips.pdf ) document, contributed by an InterPSS user, has more detailed information regarding how to use InterPSS graphic editor.
An asterisk in the one-line diagram, as shown in the above diagram, indicates that the network under editing has been changed (dirty). You may want to save the project before moving to other tasks.
InterPSS assumes that all simulation algorithms are based on the node admittance Y-matrix. This also means that InterPSS could be extended to implement any Y-matrix based power system simulation algorithm.
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
(http://home.interpss.org:81/api/interpss/core/com/interpss/core/net/Network.html ) )
InterPSS divides power system simulation into two main categories (Application Type): 1) Transmission System and 2) Distribution System. Transmission System concept is more applicable to high-voltage utility system studies where network data are expressed in per unit. Distribution system concept is more applicable to medium and low-voltage distribution system studies where network data are expressed in nameplate values, such as Ohms, or Housepower.
For transmission system application type, a network could be further categorized into three Network types: ACLF For describing steady state, positive sequence power networks. It is applicable to AC Loadflow, DC Loadflow, Voltage stability and other analysis where steady-state positive sequence power network data are needed. ACSC For describing steady state power networks with positive, negative and zero sequence network data. It is applicable to Short Circuit analysis. TranStability For describing dynamic power networks for transient stability simulation. These three types of networks have an inheritance relationship, as shown in the above diagram. It is assumed that all transmission system network data are entered based on the BaseKVA (Base Kva) and BaseFreq (Base system frequency) defined in the InterPSS project dialog box. Please note: after a project has been created, its application type cannot be changed. You cannot change, for example, a transmission system to a distribution system, since their underlaying data structures are quite different. Within the same application type, you can only change the network type downward in the inheritance hierarchy, for example, from ACLF to ACSC network. Changing from ACSC network to ACLF network will result data loss, which is the reason why it is
8 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
not allowed. Please note: you can perform Loadflow analysis on an ACSC network, if Loadflow data has been entered into the network. Bus/Branch inside InterPSS simulation model are modeled as objects. These objects have types, such as AclfBus, AclfBranch, applicable to different type studies, such as Loadflow. However, these objects share certain common features, as follows:
To retrieve the bus object from it parent containing network object, we can write the following Java statement:
Bus bus = net.getBus("0001");
A branch object, in the InterPSS simulation model, is always connected between two buses - from-bus and to-bus. When you draw a branch from one bus to another bus, system will automatically connect the branch object to the two buses. After the branch creation, the connection relationship cannot be modified. InterPSS branch id takes the following format:
fromBusId->toBusId(Branch Circuit number)
For example, branch id 0001->0002(1) indicates the branch connected to from-bus (0001) and to-bus(0002). Its circuit number is 1. To retrieve a branch object from it parent containing network object, there are three ways, as follows:
9 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Branch branch = net.getBranch("0001", "0002"); Branch branch = net.getBranch("0001", "0002", "1"); Branch branch = net.getBranch("0001->0002(1)");
// use this approach when there is no parallel branch between two // "1" is the branch circuit number // retrieve branch by branch id
where, net is the parent Network object, "0001" is the Branch from bus object id, "0002" is the Branch to bus object id and '1' branch circuit number. A unique branch sequence number, starting from 0001, will be assigned by InterPSS to a branch object when it is created and added on to the One-line diagram. A branch object also has BranchName (optional), Area number and Zone number. If the In Service checkbox is unchecked, the Branch will be treated as an open branch in the simulation.
Please note: InterPSS power system object model allows multiple parallel branches be defined between two buses. However, the current One-line diagram can only allow you to draw one branch between two buses. The limitation will be removed in the near future. InterPSS has no limit on number of buses and branches. Memory necessary to store simulation information is dynamic allocated during the simulation process. Also, it will only allocate memory for the exact network size. For example, if you have a 5-bus system with 4 branches, InterPSS will only allocate memory for 5 Bus objects and for 4 Branch objects.
An in-depth discussion of InterPSS power system simulation model can be found at InterPSS Simulation Framework Please follow the API link to read InterPSS Java API document, where you can find InterPSS programming details, which help you to understand InterPSS from programming perspective.
Run Analysis
After creating a project and entering data, you can run analysis. Depending on the type of network created, analysis menu items will be enabled for you to perform appropriate analysis.
Assume you selected run Loadflow Analysis, you will be presented with the following dialog box:
10 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Select run options and enter necessary data, then click the Run button to run Loadflow analysis. A Loadflow summary will be presented after successfully completing the run.
If the run process is rather long, such as a transient stability simulation, the progress bar will display the percentage of simulation completed.
11 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
In some unusual cases, the simulation thread is continuously running. You can click the green button to stop.
Analysis/Simulation Result
InterPSS analysis/simulation results could be output in different format, including One-line diagram annotation, curve plotting and InterPSS report.
Result Annotation
InterPSS currently supports annotate Loadflow and Short Circuit results onto the One-line diagram after a simulation run.
12 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You can use mouse to adjust annotation text position on the One-line diagram. InterPSS will remember the location change. You can also select the clear annotation menu item to clear the annotation text on the diagram.
InterPSS in the future will allow user to have more control over the annotation content and style.
13 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
After completing a transient stability simulation, right-click a bus, you can have choice to plot any state variable associated with the bus.
Generate Report
After an analysis run, appropriate reports could be generated.
14 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Report is always saved under the parent project as shown in the following diagram.
15 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS report is template driven. You can create your own report template and plug into InterPSS to create your own custom report. Please see How to Customize InterPSS Report for details.
16 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
The following is an example to import a date file in IEEE Common Format into InterPSS.
InterPSS uses custom data file adapters to import data in a particular formal into InterPSS. You can find more informat on this subject by reading the InterPSS Custom Data File Adapter Source Code (http://interpss.googlecode.com/svn/trunk/ file adapter and plugin to InterPSS to import your data into InterPSS. The InterPSS Development Guide Develop Custom Data File Adapter could walk you through steps to implement such a adapter.
Getting Help
You can access InterPSS help information under the Help menu. For example, by clicking the User Guide -> English User Guide, InterPSS will launch your default browser and load this user guide into the browser, as shown in the following figure.
17 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You can also get to InterPSS Support site by using the menu items under the Support menu.
Debug InterPSS
Sometime your simulation results may be obviously wrong. Chances are that your input data may not be entered correctly. While InterPSS tries to check input data before running an analysis, it is impossible to catch all possible mistakes. At this point, you can send your case to the InterPSS Support (mailto:support@interpss.org) or you can debug yourself.
By clicking the Tools/Debug/SimuContextInfo, you can list the states of all objects of the current project in memory. You may need to consult InterPSS Core API (http://home.interpss.org:81/api/interpss/core/index.html ) to interpret the information. For example, the following is AclfBus object info:
18 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
id: 0001 name: Bus-1 desc: status: true (sortNumber: 2) baseVoltage: 132000.0 genCode: Swing loadCode: NonLoad voltageMag: 1.06 voltageAng: 0.0 gen: 1.06 load: 0 shuntY: 0 LF Results : voltage : 1.0600 pu 139920.0000 v angle : 0.0000 deg gen : 2.32 - 0.21i pu 232,402.29 - 20,675.75i kva load : 0 pu 0 kva
19 of 19
12/11/2007 6:03 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Load flow is one of the most commonly use power system analyses. It is also the foundation for other types of analysis and simulation. InterPSS loadflow algorithm can be summarized as follows:
For a set of specified bus voltage (magnitude and angle) and/or bus generation (Pg, Qg) at generator buses and specifi load (Pl,Ql) at load buses, find a set of bus voltage by iterative computation steps, such that the power mismatch between specified bus quantities and calculated bus quantities is within a user specified convergence tolerance.
The mismatch is computed based on bus Y-matrix and bus voltage. Currently, InterPSS loadflow implementation includes Newton Raphson (NR) method, Fast-Decoupled (PQ) method and Guess Siedel (GS) method. It also features Functional Load, PV Bus Limit control, PQ Bus Limit control, Remote Q adjustment, Transformer tap adjustment, and Phase-shifting angle adjustment. Links InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
1 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Contents
1 Create Loadflow Project 1.1 Project/Network Data (AclfNetwork JavaAPI) 1.2 Bus Data (AclfBus JavaAPI) 1.3 Branch Data (AclfBranch JavaAPI) 2 Run Loadflow Analysis 3 Loadflow Summary Display 4 Loadflow Result Annotation 5 Loadflow Report 6 Loadflow Lab 6.1 Step-by-step Run 6.2 Applying Adjustment/Control 7 Advanced Loadflow Adjustment/Control 7.1 Functional Load (FunctionLoad JavaAPI) 7.2 PV Bus Limit Adjustment (PVBusLimit JavaAPI) 7.3 PQ Bus Limit Control (PQBusLimit JavaAPI) 7.4 Remote Q Adjustment (RemoteQBus JavaAPI) 7.5 Transformer Tap Adjustment (TapControl JavaAPI) 7.6 Phase-Shift Transformer Adjustment (PSXfrPControl JavaAPI) 7.7 Area Interchange Power Control (AreaInterchangeController JavaAPI)
To define a Loadflow project, select Transmission application type and ACFL network type.
2 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
DescriptionDescription of the project. BaseKVABase KVA for the Per Unit system for the project. BaseFreqBase Frequency in Hz for the project. Include adjustments/ControlsInclude advanced adjustment and control in the analysis.
InterPSS loadflow bus model is shown in the above diagram. In addition to the Bus object common attributes, three pieces of information, 1) Generation; 2) Load and 3) Shunt G+jB, need to be defined to describe an AclfBus object. The bus data entry dialog is shown in the following diagram.
3 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Swing - Swing/Slack generation bus Vspec(pu)Bus voltage magnitude Angle(deg)Bus voltage angle PV - PV generation bus Pgen(pu)Generator active power Vspec(pu)Bus voltage magnitude PQ - PQ generation bus Pgen(pu)Generator active power Qgen(pu)Generator reactive power Capacitor - Capacitor bus Qcap(pu)Rated capacitor reactive power. The reactive power is treated as an impedance in the Loadflow calculation. Non-Gen : None generator GenScripting : Bus custom model scripting. See How to Script InterPSS Bus/Branch Object for details.
Const-PConstant power load Const-IConstant current load Const-ZConstant impedance load NonLoadnone load bus LoadScripting : Bus custom model scripting. See How to Script InterPSS Bus/Branch Object for details. Pload(pu)Bus load active power Qload(pu)Bus load reactive power
The other disabled fields on the Bus data dialog box are for advanced Loadflow features. They will be enabled when the Include adjustments/Controls choice in the project data panel is selected.
4 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS loadflow branch models are shown in the above diagrams. Please note: InterPSS simulation model also supports a phase-shift angle at the to-bus side also. For more details, see Phase-shift Transformer Java API (http://home.interpss.org:81/api/interpss/core/com/interpss/core/aclf/PSXfrAdapter.html )
To define a Line branch, select Branch Type - Line R(pu)Line resistance X(pu)Line reactance 1/2B(pu)Half line charging admittance MvaRating1Branch Mva rating for violation check MvaRating2Branch Mva rating for violation check MvaRating3Branch Mva rating for violation check To define a Transformer branch, select Branch Type - XFormer. The following additional fields need to be defined: From TurnRatio(pu)From bus side transformer turn ratio To TurnRatio(pu)To bus side transformer turn ratio
To define a Phase-shifting Transformer branch, select Branch Type - PhaseShift-Xfr. The following additional fields need to be defined: Shift Angle(deg)From bus side phase-shifting angle. From-side bus voltage is shifted by the angle value.
5 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
CasenameRun case name. DescriptionDescription for the case NR: Newton-Raphson Method PQ: Fast Decoupled Method GS: Gauss-Seidel Method Error toleranceError tolerance for loadflow convergence check Max iterationMaximum iterations for the run. Initialize Bus VoltageInitialize bus voltage before running the case. InterPSS holds loadflow results in memory. Therefore, a loadflow run could continue from a previous run or start from flesh by initializing the bus voltage. Show Loadflow SummaryIf checked, the loadflow summary information will be displayed after a Loadflow run.
6 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You can find more detailed information about InterPSS Loadflow algorithm by examining the InterPSS Loadflow Algorithm API (http://home.interpss.org:81/api/interpss/core/com/interpss/core/algorithm/LoadflowAlgorithm.html ) .
By clicking the Bus Style option, the summary can be displayed in the IEEE Bus Style Format, as follows:
7 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You can click the SaveAs button to save the result to a text file.
Loadflow Report
8 of 17 12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS report is template driven. You can create your own report template and plug into InterPSS to create your own custom report. Please see How to Customize InterPSS Report for details.
Loadflow Lab
In most cases, you can get a converged loadflow solution by applying the NR, PQ or GS method. However, there may be situations where the available methods cannot produce a converged loadflow solution, because of data entering errors or ill-conditioned operation conditions. In such situation, you may want to find out the reason by "looking" into the loadflow calculation process to diagnosis the problem.
9 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Loadflow is a non-linear problem. There is no math equation/method to exactly tell you what is the problem, at least we have not found such equation/method yet. What InterPSS provides is a new concept - Loadflow Lab, which allows you to run loadflow step-by-step, using different method at your choice, and applying loadflow adjustment/control at any time you want. The design goal of InterPSS Loadflow Lab is to provide an environment for you to tune your network to get a converge loadflow solution, as if you were sitting in a power system laboratory and adjusting control buttons to turn a power system to a desired operating condition. Adjustment, such as the Remote Q Adjustment, applies certain adjustment of, for example, bus generator Q, to maintain voltage at a specified bus. The adjustment amount is calculated by InterPSS using sensitivity analysis. Sensitivity analysis is a linearization prediction, trying to predict the non-linear system behaviour using sensitivity factor(s). InterPSS allows you to control the adjustment amount by specifying a change multiplying factor.
Step-by-step Run
By clicking the "NR>" button, a NR step will be applied. You can watch the Power Mismatch change after the click. Normally, the mismatch will decrease. In case, the mismatch increases, click Details to find out the bus(s) with large mismatch to diagnosis the problem.
10 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
NR> : Run a Newton-Raphson method step PQ-P> : Run a Fast-Decoupled method P calculation step PQ-Q> : Run a Fast-Decoupled method Q calculation step GS> : Run a Gauss-Seidel method step Reset : Reset the network to its initial condition (voltage = 1.0)
Applying Adjustment/Control
When you have active adjustment/control, you will see enabled buttons, which allows you to apply all adjustment/control(s) in a category or an individual adjustment/control. During the calculation process, an adjustment/control could be turned off. For example, a PV Bus Limit control will be turned off when a violation found and the bus is turned to a PQ Bus.
The status window will display internal messages indicating actions taken by InterPSS simulation engine. For example, in the following case, PV Bus has been turned to PQ Bus because of limit violation.
11 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
The following is a summary of this advanced feature. More detailed information can be found at AC Loadflow Analysis Reference Manual (http://home.interpss.org:81/wiki/index.php?title=Main_:_InterPSS_Reference_:_Aclf#Advanced_Loadflow_Adjustment.2FContr .
12 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Functional load allows you to model a bus voltage dependent non-linear load
Pload = Pload(0) * [ Const-P-factor + Const-I-factor * Voltage + Const-Z-factor * Voltage^2 ] Qload = Qload(0) * [ Const-P-factor + Const-I-factor * Voltage + Const-Z-factor * Voltage^2 ]
PV Bus Limit Adjustment allows you to define Qmax and Qmin for a PV Bus. If during the loadflow calculation process, the Q required to support the PV Bus voltage (Vspec) exceeds the limit, the bus will be changed to a PQ Bus with bus Q
13 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
= Qmax or Qmin.
PQ Bus Limit Adjustment allows you to define Vmax and Vmin for a PQ Bus. If during the loadflow calculation process, the actual bus voltage exceeds the limit, the bus will be changed to a PV Bus with bus Vspec = Vmax or Vmin.
Remote Q Adjustment allows you to use the bus Q to control a remote bus voltage or a remote branch Mva flow. In the above example, the bus Q is used to control Bus-4 voltage at ReVspec = 1.0. If the required Q to support the remote bus voltage exceeds the limit [Qmax, Qmin], the bus will be changed to a PQ bus with Q = Qmax or Qmin.
14 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You can also use the bus Q to control reactive Mar flow on a remote branch. For example, in the above diagram, the bus Q is used to control reactive power flow on branch Bus2->Bus4. The Mar flow direction is From->To and Mar is measured at the to-bus side.
You can use transformer tap to control a bus voltage. The bus could be the terminal bus of the transformer or any remote
15 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
bus in the network. You need to specify the bus to be voltage-controlled is on the transformer from-bus side or to-bus side, and the control tap is on the from-side or to-side. Also, limit [max/min turn ratio] and change step length need to be specified. If the Step = 0.0, it is assumed that the transformer tap could be adjusted continuously.
You can also use transformer tap to control reactive Mar flow on the transformer branch.
You can use phase-shift angle to control power flow on the phase-shift transformer. You need to specify power control side (From Side or To Side) and power flow direction (From->To or To-From). Angle control is within the limit
16 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
[AngleMax, AngleMin].
Retrieved from "http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_Guide:Loadflow_Guide " This page was last modified 03:22, 22 September 2007. Content is available under GNU Free Documentation License 1.2.
17 of 17
12/11/2007 6:04 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS Short Circuit User Guide InterPSS short circuit implementation includes 3-Phase, Line to Ground, Line to Line and Line-Line-Ground faults.
The fault can be defined at a bus or on a branch. A distance (percent relative to the from bus of a branch) is used to define the exact location of a branch fault. Unit bus voltage with a multiplying factor or actual bus voltage, calculated by running Loadflow analysis, could be used as the initial voltage for the short circuit calculation.
Links
Contents
1 Create Short Circuit Project 1.1 Project Data (AcscNetwork JavaAPI) 1.2 Bus Data (AcscBus JavaAPI) 1.3 Branch Data (AcscBranch JavaAPI) 1.3.1 Line Branch 1.3.2 Transformer Branch 1.3.3 Phase-Shift Transformer Branch 2 Run Short Circuit Calculation 3 Short Circuit Output 4 SC Result Annotation 5 Short Circuit Analysis Report
InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
1 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
To create a short circuit project, select the Transmission application type and the ACSC network type. You can include loadflow information into your SC case by select the Include Loadflow Information check box. BaseKVA : Base Kva for system PU value BaseFreq : System frequency base.
2 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Contribute Bus Type R1/R2/R0puInternal bus resistance (1/2/0 sequence) X1/X2/X0puInternal bus reactance (1/2/0 sequence) SolidGroundedSolid grounded bus Z-GroundedGrounded through an impedance Z (GroundR + jGroundX) UnGroundedNot grounded NonContribute Bus Type - Not input data needed. If Loadflow information included in the project, the Loadflow tap would be enabled to allow you to enter loadflow data for the bus. Scripting - Allow you to write custom Java code to define a Bus for short circuit analysis, see How to Script InterPSS Bus/Branch Object for details.
3 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
R1/R0puLine resistance (1/0 sequence). InterPSS assume R(2) = R(1) for line branch. X1/X0puLine reactance (1/0 sequence). InterPSS assume X(2) = X(1) for line branch. 1/2B1/B0puHalf Line admittance (1/0 sequence). InterPSS assumes B(2) = B(1) for line branch.
Transformer Branch
4 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
In additional to R and X, the following extra date needs to be defined for a transformer branch: From/To TurnRatiopuFrom-side and to-side transformer turn ratio. FromSide/ToSide GroundingAllow you to define From-Side and To-Side transformer winding connection. Delta Connection-connection Wye ConnectionY-connection. For Y-connection, grounding type and optional grounding Z need to be defined.
Phase-Shift Transformer Branch Phase-shift transformer needs the same input data as transformer. In addition, a phase-shift angle (at From-side) needs to be defined. For positive sequence From-side voltage angle will be shifted by the angle value. For negative sequence, the voltage will be shifted by the angle value. For zero sequence, there is no angle shifting. The Scripting branch type - Allow you to custom Java code to define a Branch for short circuit analysis, see How to Script InterPSS Bus/Branch Object for details.
5 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
After completing data entry of a short circuit project, you can click the SC Analysis menu item to run short circuit analysis.
For bus fault, select a bus and Bus Fault type 3PThree phase to ground fault L-GSingle phase to ground fault L-LLine to line fault LL-GLine to line to ground fault L-Gr+jxLine to ground fault impedance, applicable to 3P, L-G and LL-G L-Lr+jxFault impedance between lines, applicable to L-L Loadflow Prefault VoltageUse loadflow voltage as prefault voltage Fixed Prefault VoltageFixed prefault voltage (1.0 pu). You can use the MFactor(%) to increase/decrease fault current contribution
6 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
MFactor% A multiplying factor can be defined increase/decrease fault current contribution Please note: You only need to define positive sequence data for 3P fault calculation. For L-G, L-L, or LL-G, you need to enter negative and zero sequence data.
For branch fault, select a branch and Branch Fault type. In addition to data defined in the bus fault section, Fault Distance Define fault distance in % from the From-Bus.
7 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
8 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
In case of non-symmetric faults, current in 012 and ABC coordinates will be displayed.
SC Result Annotation
Short circuit analysis results will be annotated on to the One-line diagram after a short circuit analysis run.
This page was last modified 16:54, 14 September 2007. Content is available under GNU Free Documentation License 1.2.
9 of 9
12/11/2007 6:05 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS Transient Stability User Guide InterPSS transient stability simulation is designed to simulate electromechanical transients due to a large disturbance
(Dynamic Event) or a sequence of such events in electric power systems. Links
Contents
1 Create Transient Stability Simulation Project 1.1 Project Data (DStabilityNetwork JavaAPI) 1.2 Bus Data (DStabBus JavaAPI) 1.2.1 Machine Parameter 1.2.2 Excitation System Parameter 1.2.3 Governor Parameter 1.2.4 Stabilizer Parameter 1.2.5 Controller Modeling Language(CML) 1.2.6 Dynamic Bus Device Scripting 1.3 Branch Data (DStabBranch JavaAPI) 2 Run Stability Simulation 2.1 Define Simulation Parameter 2.2 Define Dynamic Event 2.3 Define Initialization 2.4 Select Output Variable 3 Plot Simulation Result 3.1 Output Scripting 4 Result Output Scripting 4.1 InterPSS Data Storage Architecture 4.2 Scripting Simulation Output Results
InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
1 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
BaseKVA : System base KVA for the Per Unit system, the default value is 100,000 Kva BaseFreq : System base frequency, the default value is 50 Hz Machine Data : Machine parameters, such as Xd, supplied by the manufacture could be saturated values directly from field measurement or adjusted to unsaturated values. Under Machine Data, you can select either Unsaturated or Saturated. You can find more details on the subject in the Transient Stability - Machine & Component Model document. Include Adjustments/Controls : Include/exclude adjustment/control in loadflow calculation in the initialization process. Please see the InterPSS Loadflow User Guide for more details. The Loadflow adjustment/control, such as Transformer tap control, only applies to the initial condition. User would need to define a dynamic bus device or dynamic branch device (to be implemented and elaborated in the future) to study any dynamic behaviour of these adjustment/control devices.
2 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
First you need to enter Bus loadflow data for establishing a steady-state as the initial condition for transient stability simulation. To add a machine dynamic model, you need to select Generator Type = Swing, PQ, PV or RemoteControl. If you would like to define a custom dynamic model for the bus, select the Dynamic Bus Device Scripting check box (see more discussion on this subject beblow). Machine Parameter
3 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
After a bus has been defined and Generator Type selected (i.e. Swing, PV, PQ or RemoteControl), you need to determine the machine model and define machine parameters for Transient Stability Simulation. You can find more details about InterPSS machine models at InterPSS Reference manual in Transient Stability - Machine & Component Model. To add machine controllers (Excitation system, governor system, PSS), select the Has Excitation Controller and/or Has Governor Controller check box; the PSS is enabled by selecting Has Stabilizer in the Exciter Info tab.
4 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Various types of excitation system models are included in the InterPSS. To define an excitation system, select an excitation system model in the Type drop down list and enter the necessary parameters. For more detailed information on InterPSS excitation system implementation, please see InterPSS Reference Manual Transient Stability - Excitation System. A user can also select the CML Scripting Exciter to define a custom excitation system using InterPSS Controller Modeling Language (CML) (http://docs.google.com/View?docid=dz384d8_18ckbtn4) . Check the Has Stabilizer box if you want to add a Power System Stabilizer (PSS).
Governor Parameter
5 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Similar to Excitation System, various types of governor models are also included in the InterPSS. To define a Governor system, you need to select an existing InterPSS governor system model from the Type drop down list and then enter necessary parameters. please see InterPSS Reference Manual Transient Stability - Governor System. You can also select the CML Scripting Governor to define a custom governor system by using InterPSS Controller Modeling Language (CML) (http://docs.google.com/View?docid=dz384d8_18ckbtn4) .
Stabilizer Parameter
6 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Similar to the Excitation System, various types of Power System Stabilizer models, or simply referred as Stabilizer in InterPSS, are also included. To define a power system stabilizer, select an existing InterPSS PSS implementation from the Type drop down list and then enter necessary parameters. For more detailed information on the implementation of InterPSS PSS implementation, please see the InterPSS Reference Manual Transient Stability - Stabilizer System. You can also select the CML Scripting Stabilizer to define a custom PSS by using InterPSS Controller Modeling Language (CML) (http://docs.google.com/View?docid=dz384d8_18ckbtn4) .
7 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
When you select CML controller type, for example CML Scripting Exciter, you will be presented with an editor dialog box with some sample code. You can define your own custom controller model by writing CML scripts. After completing the editing, click the Save button to save your scripts. At this time, InterPSS will compile your scripts. If there is any error, you will be presented with error messages, as shown in the following diagram.
8 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS Controller Modeling Language is designed to simplify controller modeling for transient stability simulation. One can write CML scripts to define a custom controller, including Exciter, Governor and Stabilizer. You can find more info about CML at the following links: InterPSS Controller Modeling Language (CML) (http://docs.google.com/View?docid=dz384d8_18ckbtn4) CML Tutorial (http://docs.google.com/Doc?id=dd7m5rrq_77c84vq6) CML Controller Implementation Example Static Exciter (http://docs.google.com/Doc?docid=dd7m5rrq_151dt52b2&hl=en_US)
9 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
If the standard InterPSS machine and controller models do not meet your simulation requirement, you can create a custom bus simulation mode by using Dynamic Bus Device scripting. In this approach, you can define a dynamic source or load, where source/load injection current into the network is a function of bus voltage and time
I = f(V, t)
The function could be a set of differential and/or static equations. Dynamic Bus Device gives you a generic way to script such a function. It could be used to model dynamic load including motors, SVC, FACTS or complex generation station dynamics. For more details, see InterPSS Extension Guide - How to Script Dynamic Bus Device .
10 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
After completing data entry of a transient stability simulation project, you can run simulation by select the Run/Transient Stability menu item or the Run TS button. The simulation progress bar will show the progress of a simulation run with a percentage Run DStab (14%).
11 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Simulation Method : Solution method for dynamic differential equation. Currently, only Modified Euler method is available. More choices will be available in the future. Disable Dynamic Events : Transient stability simulation always starts from a steady-state condition. At t = 0.0, InterPSS goes through an initialization process. It is possible that a steady-state condition cannot be established because of entry error or incorrectly operating condition specification. By select this option, InterPSS will run the simulation by disabling all event. Normally you should see response curve of all state variable as straight lines. This function is designed to allow you to investigate situations where initial steady-state condition might be specified incorrectly. Total Time(sec) : Total simulation time in sec. Simu Step(sec) : Simulation time step. The step applies to all dynamic devices in the system. We recommend a simulation time step of 1/5 of the smallest time constant in the system. Ref Machine : InterPSS allows to you to output machine angle relative or absolute value. When you choose relative value, you need to select a reference machine. InterPSS will recommend the machine with the largest inertia as the reference machine. Absolute Machine Angle : Option for absolute or relative angle Net Eqn Iterations (No Event) : InterPSS uses iterative method to solve the network equation because of generator injection current is a non-linear function of generator bus voltage. You can specify a number for the iteration when
12 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
there is no dynamic event at the simulation step. Net Eqn Iterations (With Event) : You can specify a number for the iteration when there is a dynamic event(s) at the simulation step. Normally you should give a large number than the No Event number, since with dynamic event, more iterations are needed to achieve the same accuracy. Output state/variable Filter : Option for you to select a sub-set of state/variable to be output. See below for more details. Output Result Scripting : Option for you to performance Output Result Scripting. See below for more details. Static Load Model : You can model static load either as an impedance or a constant power source. SwitchVolt(pu) : When using constant power load model, the load will be switched to constant impedance load when the bus voltage becomes lower than a switch voltage threshhold, SwitchVolt(pu). It will be switched back to constant power load model when the voltage becomes higher than the threshhold plus the Dead Zone to avoid constant switching. DeadZone(pu) : Dead zone for load simulation model switching Controller SetPoint Change : Some time you might want make a step change to the set point or reference point of a controller to verify if parameters of the controller have been entered correctly. When you select the Disable Dynamic Events checkbox, the Controller SetPoint Change area will be enabled to allow you to define a controller set point change event. Machine : Select a machine where you want to make set point change Controller : List of all controllers on the selected machine SetPoint Value Change : Set point/reference point change value Absulte or Delta : Specify if the change is absolute or delta - a change to the steady-state value, which is calculated during the initialization process.
13 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Dynamic Event List : Dynamic event list. You can have multiple dynamic events defined with the limitation that you cannot have two simultaneous un-symmetric faults presented in the system at the same time. Dynamic Event Type : Currently four types of dynamic events are implemented. For details see the Transient Stability - Dynamic Events reference document. Start Time(sec): Event start time Duration(sec) : Event duration, if not a permanent event Permanent : For permanent event, it will last the total during of the simulation duration Dynamic Event Details : different type of events have different input screen for event data. For example, for Bus Fault Event, enter the following data: Fault Bus : select fault bus 3PThree phase to ground fault L-GSingle phase to ground fault L-LLine to line fault LL-GLine to line and ground fault L-Gr+jxLine to ground fault impedance, applicable to 3P, L-G and LL-G L-Lr+jxFault impedance between lines, applicable to L-L AddEvent : Add a new dynamic event
14 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
SaveEvent : Save the current dynamic event DeleteEvent : Delete the current dynamic event For details on all types of Dynamic Event, see the Transient Stability - Dynamic Events reference document.
Define Initialization
InterPSS uses loadflow module to establish a steady-state condition for transient stability simulation. This panel allows you to define initialization related parameters, which are the same as InterPSS loadflow analysis. See InterPSS Loadflow User Guide for details.
15 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS by default outputs all simulation states and variable to its internal database for simulation result display/output purpose. This however will sometime slow down the simulation, since it takes time to write the result to the database, especially for a large size system. When you select the Output state/variable Filter option on the Simulation panel, you have the choice to select a set of states and/or variables to be included in the output list. In this way, you can speed up the simulation process by saving less data into the database. When you select a machine, the output includes all machine states and its controller states, including Excitation system, Governor, PSS. In the above case, machine states of machine on Bus 0004 and bus variables at Bus 0001 will be output to the database, and available to display after the simulation.
16 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
After completing a simulation, right-click a bus, you can have choice to plot any state variable associated with the bus.
You can also select Output->Plot Stability Curve to launch the Simulation Plotting Dialog.
17 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
The "P" button allows you to plot a selected state/variable. The "S" allows you to produce scripted output. See the following section for details.
Output Scripting
You can write scripts to output a set of variables in certain format. You can click the Scripting tab and write your scripts. Then click the S button to run your scripts.
18 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
19 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Then you can save the output to a file by clicking the SaveAs button.
20 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS simulation engine sends simulation result out as messages. It does not know who listens and processes the message. InterPSS has two output message categories: Simulation Step Message and Plot Step Message. Simulation Step Messages are sent out at each simulation step, while Plot Step Messages are sent out at plotting steps, which may be different than the simulation steps. InterPSS adjusts the plot step such that the total plotting points are approximate 500 points. User can define a filter to filter out the messages. For example, you may be only interested in machines in certain area/zone or belong to certain owner. You can plugin output message handler(s) to process the message. Currently, the default result output message handler is a database result handler, which listens to the messages and store them into InterPSS internal database. After the simulation, one can use the Database access module to access the stored results and use the InterPSS Plot Routine to plot simulation curves. The plot routine also is a plugin. One can replace it with a custom implementation.
21 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
@AnDStabOutputScripting ( filename = "c:/tmp/ipssout.csv", varList = { "str.Angle(Mach@0001), 0001, mach.angle", "str.Speed(Mach@0001), 0001, mach.speed", "str.Speed(Mach@0001), 0001, mach.pe", "str.Efd(Mach@0001), 0001, exc.efd", "str.PSS(Mach@0001), 0001, pss.vs", "str.Voltage(Bus@0002), 0002, bus.vmag"} )
In this case, you want to output machine.angle at Bus id:0004 under the header Angle(Mach@004). After the simulation, a CSV file will be created. Using Excel, you can process the results in the way you like. Using Microsoft Excel, you can load the CSV file and do further processing.
22 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
This page was last modified 03:54, 22 September 2007. Content is available under GNU Free Documentation License 1.2.
23 of 23
12/11/2007 6:07 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS Distribution System User Guide InterPSS divides power system simulation into two main categories: 1) Transmission system analysis and 2)
Distribution system analysis. InterPSS distribution system analysis module is design for medium and low voltage power distribution system analysis. In the distribution system analysis, power system equipments, such as generator and motor, are described using nameplate values, such as Ohms, or HousePower. InterPSS distribution system analysis shares the same underlying power system simulation framework and core simulation engine with InterPSS transmission system analysis.
Links
Contents
1 Introduction 1.1 Distribution System Representation 1.2 Loadflow Analysis 1.3 Short Circuit (SC) Calculation 1.4 SC Standard and Multi-Point SC Calculation 1.5 Voltage Profile Analysis 2 Create Distribution System Project 2.1 Project Data (DistNetwork JavaAPI) 2.1.1 ANSI Standard 2.2 Bus Data (DistBus JavaAPI) 2.2.1 Utility Bus 2.2.2 Generator Bus 2.2.3 SynMotor Bus 2.2.4 IndMotor Bus 2.2.5 MixedLoad Bus 2.2.6 NonContribute Bus 2.3 Branch Data (DistBranch JavaAPI) 2.3.1 Feeder Branch 2.3.2 Breaker Branch 2.3.3 Transformer Branch 3 Run Distribution System Analysis 3.1 Run Loadflow Analysis 3.1.1 Load Profile Analysis 3.2 Run Short Circuit Analysis 3.2.1 Run ANSI Multi-Point SC 4 Loadflow and SC Report 4.1 Loadflow Report 4.2 SC Report 5 Sample Distribution System Project
InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
1 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Introduction
In InterPSS distribution system analysis, power system equipments, such as generator and motor, are described using nameplate values, such as Ohms, or HousePower. It is design for medium and low voltage power distribution system analysis. Distribution System Representation Currently InterPSS distribution system analysis can by used to model the following bus equipments: Utility Bus - For representing interface to utility company. Normally, there is only one such interface in a distribution system. InterPSS, however, allows you to have multiple such interfaces defined in your project. In such a case, you have to make sure that the Utility bus voltage angles are specified correctly. Generator Bus - For representing generators for distribution system loadflow and short circuit analysis. Synchronous Motor Bus - For representing synchronous motor for distribution system loadflow and short circuit analysis Induction Motor Bus - For representing induction motor for distribution system loadflow and short circuit analysis Mixed Load Bus - For representing mixed static KVA load and motor load for distribution system loadflow and short circuit analysis NonContribute - For representing a non-contributing bus Currently InterPSS distribution system analysis could be used to model the following branch devices: Feeder Branch - For representing feeder, including cable for distribution system loadflow and short circuit analysis Transformer Branch - For representing 2-winding transformer for distribution system loadflow and short circuit analysis Breaker Branch - For representing circuit breaker for distribution system loadflow and short circuit analysis Loadflow Analysis After you build an InterPSS distribution system project, you have defined enough information for loadflow analysis. By running loadflow analysis, you can find bus voltage, voltage dip, branch KW/Kvar flow and branch current flow. Short Circuit (SC) Calculation After you build an InterPSS distribution system project, you have defined enough information for short circuit calculation. By running Short Circuit calculation, you can calculate short circuit current, when there is a bus fault or a branch fault. You can select any fault location and apply 3-Phase, Line-Ground, Line-Line or Line-Line-Ground fault. SC Standard and Multi-Point SC Calculation One of the main purposes of short circuit calculation is for equipment selection and protective device coordination. Normally one would calculate short circuit current value at the following three points: Momentary Peak Value at half-cycle for validating equipment withstand Interrupting Value at 3-5 cycle to make sure the breaker will operate correctly Steady-state value, 20-cycle and beyond to make that concerned equipment will not be overheated or for fuse selection. Different countries and different manufactures have different standards. However, you always need to perform multiple short circuit calculations. You can then use the calculation results to find out X/R ratio and to determine the DC component for protective device coordination. InterPSS allows you to perform up to 5 point short circuit calculation. Future version will allow advanced user to plugin their own standard.
2 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Voltage Profile Analysis Load and generation, in distribution systems, change with time. You may want to define load profile, a set of load points, and/or generation profile, to study how bus voltage varies with load change. You can also define service profiles for transformers to switch on/off to study the effect of such switching on system loss to optimize reactive power flow.
To define a Distribution system project, select Distribution application type. The Network Type is always ACSC, which means you can perform Loadflow and Short Circuit analysis. DescriptionDescription for the project. BaseKVABase Kva for the Per Unit system for the project. BaseFreqBase Frequency in Hz for the project. Load Schedule Analysis : Allows to define a set of load schedule points for voltage profile analysis. Load Points : number of load schedule points Period Length : load period length SC Standard : Currently InterPSS support Generic and ANSI
ANSI Standard
3 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
When select ANSI standard, you can define up to five short circuit calculation points.
Utility Bus is treated as a Swing bus in loadflow calculation and a contributing bus in short circuit analysis. BusName : Bus name, optional Base Volt : Bus nominal voltage Area : Area number, optional Zone : Zone number, optional In Service : If unchecked, the bus will not not participate in the calculation. Voltage : Bus actual voltage Angle : Bus voltage angle. In most cases, there is only one Utility bus. The angle should be set to zero. SC MVA(3P): Three phase short circuit MVA, which will be used to calculate the internal impedance for the bus. SC MVA (1P) : Single phase short circuit MVA, which will be used to calculate the internal impedance for the bus. X/R (3P) : X over R for three phase SC MVA
4 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
X/R (1P) : X over R for sinle phase SC MVA Grounding : For short circuit analysis SolidGroundedSolid grounded bus Z-GroundedGrounded through an impedance Z (GroundR + jGroundX) UnGroundedNot grounded The following equations are used to calculate the internal impedance for the Utility Bus:
Generator Bus
Rated KW : Generator equipment rating Rated V : Generator equipment rated voltage, which may be different than the bus Base/Norminal voltage PFactor : Generator power factor
5 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Loading(%)Generator loading factor, used to calculate the actual generation output = RateKW*Loading/100. Include Load Schedule : Define generator loading schedule, if the Load Schedule Analysis option has been selected in the project data panel. You can define a set of P, Q factors to describe a generator P/Q profile.
Short Circuit Impudence : Generator short circuit impedance. In case of ANSI standard, you need to enter Z for multiple points, as shown in the following diagram.
ZUnit : Generator impedance unit on generator equipment rating and rated voltage base Grounding : Data entry aame as the Utility Bus
SynMotor Bus Synchronous Motor bus. Input data is the same as the Induction Motor bus.
IndMotor Bus
6 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
For modeling an induction motor Rated HP: Motor equipment rating Rated VMotor equipment rated voltage, which could be different then the bus Base Voltage PFactor : Motor equipment power factor Efficiency(%)Motor equipment efficiency Loading(%) : Motor equipment loading Include Load Schedule : Define load schedule, if the Load Schedule Analysis option has been selected in the project data panel. You can define a set of P, Q factors to describe a load P/Q profile. Data entry same as generator bus. Short Circuit Impudence : Define motor short circuit impedance. Data entry same as the generator bus Grounding : Data entry same as the Utility Bus
MixedLoad Bus
7 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
For representing mixed static load and motor bus Total KVA : Total bus load rating Rated V : Bus rated voltage, which could be different then the bus Base Voltage PFactorBus load power factor Motor(%)Motor load percent. It should be always less than 100%. The other part (100%-Motor%) is treated a static load. Include Load Schedule Define load schedule, if the Load Schedule Analysis option has been selected in the project data panel. You can define a set of P, Q factors to describe a load P/Q profile. Data entry same as the generator bus. Short Circuit Impudence : Define motor short circuit impedance. Data entry same as the generator bus. Grounding : Data as same as the Utility Bus
NonContribute Bus NonContribute Bus has no contribution to loadflow analysis and short circuit calculation.
8 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
For representing a feeder. Name : Feeder branch name, optional Area : Feeder branch area number, optional Zone : Feeder branch zone number, optional In Service : If uncheck, the branch is treated as an open branch in the calculation Feeder Name : Feeder name. It will be used in the future for default feeder data lookup. Length: Feeder length X/1000, R/1000Feeder X and R impedance Ohms per 1000 unit length X0/X1, R0/R1Feeder X0/X1, R0/R1 ratio B1/1000 : Feeder positive sequence shunt admittance, microMhos/1000. Also applies to feeder negative sequence shunt admittance B0/B1 : Ratio B0/B1, B0 being zero sequence feeder shunt admittance.
Breaker Branch
For representing a breaker. Breaker Name : Breaker name. It will be used in the future for default data lookup. RBreaker resistance in ohms Include Service Schedule : You define a breaker on/off schedule for multiple points, if the Load Schedule Analysis option has been selected in the project data panel.
9 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Transformer Branch
For modeling a transformer branch Xformer Name: Transformer name, It will be used in the future for default data lookup. Rating : Transformer KVA rating Primary/Second Rated VPrimary and secondary rated voltage. X, R, X/R : Transformer X, R, on the transformer rating and rated voltage base X0/X1, R0/R1 : Ratio for calculating zero sequence X and R Primary/Secondary TurnRatio : Transformer primary and secondary turn ratio Include Service Schedule : You can define a transformer on/off schedule for multiple points, if the Load Schedule Analysis option is selected in the project data panel.
10 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Grounding : Allow you to define grounding for the primary and secondary side Delta Connection-connection Wye ConnectionY-connection. For Y-connection, grounding type and optional grounding Z need to be defined.
After completing a distribution system project, you can run Loadflow Analysis and SC Analysis by select the menuitem or the toolbar button. Advanced user can write The Custom Run Scripts to define a custom run process. Please see How to Script Custom Analysis Run for details.
11 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Select a Loadflow method and enter necessary info, then click Run to run Loadflow analysis. If the Show Loadflow Summary check box is selected, you will be presented with the Loadflow result summary, as shown in the following diagram.
12 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Select the Bus Style to change the Loadflow output in the IEEE BusStyle format. By click the SaveAs button, you can save the Loadflow results into a file. Click Close button to close the result disply box. Then the Loadflow results are annotated onto the One-line diagram, as shown in the following diagram:
13 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
When the Load Schedule Analysis option is selected in the project data panel, you can specify multiple Load points at load buses and/or generation points at generator buses. When you run Loadflod analysis, InterPSS will run multiple Loadflow for all the points. The following is a sample output of a Load Profile analysis output.
After a Load Profile Analysis run, by clicking a load bus, you can plot its P, Q and voltage profile.
14 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
15 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
For bus fault, select a bus and Bus Fault type 3PThree phase to ground fault L-GSingle phase to ground fault L-LLine to line fault LL-GLine to line to ground fault L-Gr+jxLine to ground fault impedance, applicable to 3P, L-G and LL-G L-Lr+jxFault impedance between lines, applicable to L-L Loadflow Prefault VoltageUse loadflow voltage as prefault voltage Fixed Prefault VoltageFixed prefault voltage (1.0 pu). You can use the MFactor(%) to increase/decrease fault current contribution MFactor% A multiplying factor can be defined increase/decrease fault current contribution
16 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
For branch fault, select a branch and Branch Fault type. In addition to data defined in the bus fault section, Fault Distance Define fault distance in % from the From-Bus. Select the Run button to run SC calculation. After the run, you will be presented with the following result summary screen:
17 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
SC results also will be annotated on to the One-line diagram after a SC calculation run.
18 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Run ANSI Multi-Point SC When the ANSI standard is selected in the project data panel, you can define up to five SC points. Different generator/motor SC impedance could be specified for different SC points to perform multiple-point SC calculation. The following is a sample output of a Multi-Point SC run.
Loadflow Report
Currently, you can create Loadflow analysis report in two formats: 1) Summary format and 2) the IEEE Bus Style format. Last reports are saved under the parent project, as shown in the following diagram.
19 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
20 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
SC Report
The following is a sample SC report.
Please note : InterPSS report is template driven. You can create your own report template and plug into InterPSS to create your own custom report. Please see How to Customize InterPSS Report for details.
In the InterPSS release distribution, there is a distribution system sample project folder : Distribution, in the Sample Workspace, where you can find distribution system samples. You can run these samples to explore InterPSS distribution system analysis capabilities.
21 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
PDCBook_2-11.ipss - Sample from Book "Electric Power System Protection and Coordination" by Michael Anthony, Figure 2.11, page 73 PDCBook_2-12.ipss - Sample from Book "Electric Power System Protection and Coordination" by Michael Anthony, Figure 2.12, page 75 PDCBook_2-11_MPoints.ipss - Same as PDCBook_2-11, with three SC points PDCBook_2-11_LoadProfile.ipss - Same as PDCBook_2-11, with 24 load points. Retrieved from "http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_Guide:_Distribution_System "
This page was last modified 20:39, 14 September 2007. Content is available under GNU Free Documentation License 1.2.
22 of 22
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Links
Contents
1 Introduction 2 Background Information 2.1 Grid Computing Concept 2.2 Split/Aggregate (Map/Reduce) 2.3 Gridgain 2.4 Terminology 2.5 Computation Job Creation 3 Setup InterPSS Grid Computing Environment 3.1 Install InterPSS 3.2 Configure InterPSS Grid Computing solution 4 Run InterPSS Grid Loadflow 4.1 Start Grid Node 4.2 Start GEditor 4.3 Run Grid Loadflow 4.4 Loadflow Reuslts 5 Run InterPSS Grid Transient Stability Simulation 6 Future Direction 6.1 Source Code
InterPSS User Guide InterPSS Project Overview InterPSS Installation and Administration Guide InterPSS Graphic Editor User Guide InterPSS Loadflow User Guide InterPSS Short Circuit User Guide InterPSS Transient Stability User Guide InterPSS Distribution System User Guide InterPSS Grid Computing Solution InterPSS Power Market Solution
Introduction
Latest News - The InterPSS development team is currently working on a parallel transient stability simulation approach using InterPSS Grid Computing solution. In a nutshell, one can freely distributes a or a set of transient stability simulation cases to any computation grid node in an InterPSS gird computing environment to perform transient stability simulaiton. The technology will be soon available, as always, as an open-source solution.
Until recently, mainstream understanding of computer simulation is running a computer simulation program, such as a Loadflow, Transient Stability or Voltage Stability program, or a combination of such programs on a computer. Recent advance on network technology and software development concept/tools has made it possible to perform "cloud" computing, where a set of connected computers, forming a computational grid, could be used to solve certain category of
1 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
computationally intensive problems. "It is no longer enough to program one machine well, to tackle tomorrow's challenges, we need to be able to program thousands of machines to manage massive amounts of data in the blink of an eye," by a senior Google software engineer. InterPSS, from the beginning, has distributed grid computing in mind. InterPSS is completely implemented in Java - a network ready language. In a nutshell, InterPSS core simulation engine, implemented in Java current with a size about 1M, could be automatically distributed over the network and installed/deployed to any gird node without human intervention with minimum administration overhead. InterPSS object model, a full object-oriented power system simulation model, could be serialized to an XML document and distributed over the network to any grid node. Then the XML document could be de-serialized at the remote grid mode into the original object model and becomes ready for power system simulation. InterPSS has an open architecture, which allows any interesting party to implement their own grid computing algorithm on top of InterPSS grid computing foundation to offer customized solution.
Background Information
Grid Computing Concept
Grid computing was started to share unused CUP power over the Internet. However, the concept has been expanded recently to include high performance distributed parallel computing using a set of connected computers. If we look up Grid in Wikipedia there's no simple answer, it starts... "Grid computing is a phrase in distributed computing which can have several meanings". it goes on to describe a number of meanings. While something like SETI@home is technically a grid implementation, it's not the issue InterPSS grid computing solution is trying to address. Our goal is to create a software system to perform complex power system simulation in the distributed parallel way. Our targeted environment is a network of servers in one or a few local subnets with high speed network connection (100Md/s or 1Gb/s). Our targeted applications include real-time transient stability simulation and power system operation optimization.
Split/Aggregate (Map/Reduce)
The trademark of computational grids is ability to split process into a set of sub-processes, execute them in parallel, and aggregate sub-results into the one final result. Please note that split can and often does occur recursively. Split and aggregate (a.k.a Map/Reduce) design allows to parallelize the process of task execution gaining performance and/or scalability. For example, with simple and inexpensive 10-nodes grid you can achieve "an order of magnitude" performance increase for your applications, assuming your application is computation intensive and could be split into independent sub-processes. For more in depth discussion of this concept, please refer to a Google article : MapReduce: Simplified Data Processing on Large Clusters (http://labs.google.com/papers/mapreduce.html)
Gridgain (http://www.gridgain.com )
GridGain is an open-source computational grid platform. Its goal is to improve general performance of processing intensive applications by splitting and parallelizing the workload. In many cases GridGain is used to achieve better overall throughput, better scalability or availability of services. To get a high-level view of the approach, we recommend watch the 15-min Gridgain introduction screen cast (http://www.gridgain.com/screencast/screencast.html) InterPSS grid computing solution currently is based on Gridgain. However, the relationship between InterPSS and Gridgain is loosely coupled, which allows us to relative easily move InterPSS grid computing solution to other grid computational grid platform in the future, if there is such a need.
Terminology
2 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
InterPSS Gird Node - A Gridgain agent instance, running on a physical computer, where compiled InterPSS simulation code could be deployed from the Master node remotely and automatically through the network to perform certain simulation job. One or more grid node(s) could be hosted on a physical computer. InterPSS Master Node - A computer with InterPSS installation. You can also have multiple master nodes in your computing grid. Also, you can run one or more grid node(s) on a master node. InterPSS Grid - At least one master node and one or more grid node(s) form an InterPSS computating grid. InterPSS Grid Job - A unit of simulation work, which could be distributed to any grid node to run independently. InterPSS Grid Task Representing a simulation problem, which could be broken into a set of grid jobs and distributed to grid node(s). A typical grid task consists of many grid jobs. Grid task is responsible to split itself into grid jobs, distribute them to grid nodes, and aggregate simulation sub-results from grid nodes. Also, grid task should be implemented in such a way that the compiled implementation code (Java bytecode) could be remotely deployed to any grid node.
Master Node Job Creation - Units of computation work are created by the Master node and distributed to grid nodes. Distributed Job Creation - Copies of the MultiStudyCase object are sent to distributed grid nodes to create computation jobs. MultiStudyCase (JavaAPI (http://home.interpss.org:81/api/interpss/core/com/interpss/core/ms_case/MultiStudyCase.html ) ) is a generic InterPSS concept for multiple study case implementation.
3 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You can easily set up InterPSS grid computing solution in a typical office environment where there are network-connected PC and/or laptops or at your home with a router, as shown in the above diagram. All computers, participating in the grid computing, should be located in the same subnetwork. Different operating systems, such as Windows, Linux, McOS, could be used, as far as there is Java Runtime (Java 6.0) installed on each machine.
Install InterPSS
InterPSS Grid Computing solution has been included in a recent InterPSS release 1.3. You can Download InterPSS from SourceForge (https://sourceforge.net/project/showfiles.php?group_id=165109 ) Step-1 - Select a PC as the Master Grid Node. Install InterPSS on this master node machine. See InterPSS Installation and Administration Guide for details regarding InterPSS installation. Step-2 - Download (http://www.gridgain.com/downloads.html) and then install Gridgain agent 1.6.0 on all grid nodes. Gridgain installation instructions could be found Here (http://216.93.179.140:8080/wiki/display/GG15UG/Installation+Instructions ) . You can also install Gridgain on the master node machine. Please Note: You need to use the exact same Gridgain version as the InterPSS Release. For InterPSS Release 1.3, Gridgain 1.6.0 is used.
Use the <InterPSS Install>/runGrid.bat batch file to start GEditor in Grid Computing mode. You may need to make changes to reflect your Java and/or Gridgain installation location in the runGrid.bat file, as follows:
set GRIDGAIN_HOME=<GridGain installation location> "C:\Program Files\Java\jre1.6.0\bin\java" -> your Java installation location
4 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
followed the above steps and have your grid environment set up properly, follow the following steps to run:
Start GEditor
Then start GEditor in Grid Computing mode on the master node in Grid Computing mode, by running the runGrid.bat under your InterPSS installation root directory. You may need to make the following changes to the runGrid.bat file:
- Change the first line c: to g: if you installed InterPSS on your G: drive. - Change cd c:\eclipse\geditor to cd <your installation location> - Change the Java command path <c:\jdk1.6.0\bin\java ...> to your Java installation location.
Please note: There is a bug in the runGrid.bat file in the current release (v1.3.03) of InterPSS. The following line
set LIB_PATH=lib/ipss_editor.jar;lib/java/swing-layout-1.0.jar;lib/java/tools.jar;lib/apache/commons-math.jar
Select any Loadflow sample project, for example, the IEEE-14Bus system from InterPSS sample workspace. After stating GEditor and one or more Gridgain agents, you can check if your grid computing environment is set up properly by selecting the Tools/Debug/Test Grid Environment.
5 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
You may get the following message, if the environment is not set up properly or there is no grid node running in the environment.
Please note: You have to run the same version GridGain across all nodes (Master and Remote). Otherwise you might get the following error message:
Remote node has different: build version Local node: 1.6.0-16102007 Remote node: 1.5.1-13082007
6 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
Click the Run button to run InterPSS grid computing. If you are running the grid job on a particular grid node the first time, after starting the environment, it may take a while to get Loadflow calculation results back. The reason is that the compiled InterPSS grid task code (Java bytecode) has to be deployed through the network to the grid node. Click the Refresh button to discover new grid node(s) and refresh the available grid node list. Please note: The Enable Grid Computing checkbox is only enabled if your grid environment is set properly and there is at least one grid node running. During the installation process, InterPSS is only required to be installed on the master node, not on the other grid node. When a grid job is distributed to a grid node the first time, the Grid Computing environment discovers that no code for running the grid job is available on the grid node. It will perform an automatic deployment of InterPSS grid computing code to the grid node. Then after the first time, if you run another grid job on the grid node again, the response time will be very fast, since there is no need to do the deployment. No noticeable difference from running grid job on local machine should be noticed, unless your network is very slow or busy. InterPSS core engine library could also be installed on all grid nodes and loaded into memory when starting the grid node. In this way, there wont be any delay of the response event at the first time, since there is no need to remotely deploy InterPSS grid code. This way, however, will increase InterPSS grid computing solution administration overhead.
Loadflow Reuslts
7 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
The Loadflow result indicates that the computation was performed at the Remote Logical Node 1. Also, you will see Loadflow logging information printed out in the remote Gridgain agent output console, as follows:
Future Direction
One might ask what is the point to perform a Loadflow calculation on a remote grid node, since running the calculation at a local machine is much more efficient. InterPSS loadflow calculation consists of multiple power network solution steps
8 of 9
12/11/2007 6:09 AM
http://home.interpss.org:81/wiki/index.php?title=Main:InterPSS_User_G...
using the sparse technique. This relative simple implementation demonstrated that InterPSS can distribute power network solution to any remote grid node in a quite easy and efficient way. Power network solution using the sparse technique is the foundation of all most all power system simulation. Gartner Group (http://www.gartner.com/it/products/research/research_services.jsp ) thinks that future of computing will be Computing "fabrics". The fabric based computing environment of the future will treat memory, processors and I/O cards as components in a pool, combining and recombining them into particular arrangements to suit certain applications needs. That is, a large server can be created by combining, for example, 32 processors and a number of memory modules from the pool, operating together over the fabric to appear to an operating system as a single fixed server. InterPSS Grid Computing solution is targeted for such computing environments. This is our first step in attempting to "Gridify" power system simulation. We intend to further develop the technology to solve more realistic power system simulation problems, such as real-time transient stability assessment. We welcome interested user to participate in our pursuing of cloud computing for power system simulation .