Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

1. 2. 3. 4.

Name of Staff Date of Birth CNIC No. Education Degree

Muhammad Umer Azeem : : : Major / Minor Institution Center of Excellence in Water Resources Engineering, UET, Lahore University of Agriculture, Faisalabad Date (MM/YYYY) June 21, 1983 31304-2094948-5 Nationality: Pakistani

M.Sc. Engineering

Water Resources Engineering

June, 2009

B.Sc. Engineering

Agricultural Engineering

July, 2006

5.

Member in Professional Associations:

6.

Registration with Pakistan Engineering Council (PEC) as Registered Engineer(RE) Registration No. AGRI / 2596

Other Trainings: Three months training under National Program for Improvement of Watercourses (NPIW)

7.

Languages: English Urdu Speaking Fair Good Reading Good Good Writing Good Good

8.

Employment Record: Employer Position Senior Engineer Senior Engineer Junior Engineer From (MM/YYYY) August, 2012 November, 2010 April, 2008 To (MM/YYYY) To Date July, 2012 October, 2010

AGES Consultants, Peshawar FHC Consulting Engineers, Lahore FHC Consulting Engineers, Lahore

9.

Work Undertaken that Best Illustrates Capacity to Handle the Task assigned

Name of Assignment or Project: Feasibility Study of Koragh Paraith Hydropower Project. Year: 2012 - 2014 Location: Peshawar Client: Sarhad Hydel Development Organization, SHYDO. Main Project Features: Installed Capacity=223 MW, Gross Head=145m, Annual Energy=963.5 GWh, Plant Factor=49.4%, Design Discharge=240 m3/s, Length & Dia of Penstock=22000 m & 10 m, Vertical Francis 3x74.3 MW Position held: Senior Engineer - Hydropower Activities to be Performed: Layout Planning Hydraulic design of project components Hydrological and sedimentation studies Project documentation and reports Project drawings

Name of Assignment or Project: Detailed Engineering Design, Tender Documents & PC-I for Phandar Hydropower Project in Gilgit-Baltistan. Year: 2010 - 2012 Location: Lahore Client: Hydro Planning Organization, WAPDA. Main Project Features: Installed Capacity=80 MW, Gross Head=243m, Annual Energy=374.9 GWh, Plant Factor=53.5%, Design Discharge=40 m3/s, Length & Dia of Penstock=408m & 2.2m, Vertical Pelton 4x20 MW Position held: Senior Hydraulic Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Project documentation and reports Project drawings Review / Updating the Feasibility Report of Basho Hydropower Project in Gilgit-

Name of Assignment or Project: Baltistan. Year: 2011 Location: Lahore

Client: French Development Agency - AFD. Main Project Features: Installed Capacity=40 MW, Gross Head=974m, Annual Energy=145.6 GWh, Plant Factor=41.55%, Design Discharge=5 m3/s, Length & Dia of Penstock=5150m & 1.2m, Vertical Pelton 4x10 MW Position held: Senior Hydraulic Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study of Azad Pattan Hydropower Project in AJ&K. Year: 2008 - 2012 Location: Lahore Client: M/s Alamgir Power Pvt. Limited. Main Project Features: Installed Capacity=640 MW, Gross Head=65m, Annual Energy=3075 GWh, Design Discharge=1200 m3/s, Headrace Tunnel Length and Dia.=80-180 m & 8m, Francis 4x160 MW Position held: Senior Engineer Activities Performed: Hydrological and sedimentation studies Project documentation and reports Project drawings

Name of Assignment or Project: Engineering Design of Jagran-II Hydropower Project in Neelum Valley, AJ&K. Year: 2010 - 2011 Location: Lahore Client: French Development Agency - AFD. Main Project Features: Installed Capacity=48 MW, Gross Head=233m, Annual Energy=212.50 GWh, Plant Factor=50.50%, Design Discharge=26 m3/s, Headrace Tunnel Length and Dia.=3850 m & 4m, Penstock Length & Dia.= 599m & 2.5m, Vertical Pelton 4x12 MW Position held: Senior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Environmental Impact Assessment Project documentation and reports Project drawings

Name of Assignment or Project: Updation of Feasibility Study of Jhing Hydropower Project in Neelum Valley, AJ&K. Year: 2010 - 2011 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=15 MW, Gross Head=434m, Annual Energy=76.28 GWh, Plant Factor=58.63%, Design Discharge=4.2 m3/s, Headrace Channel Length=6096 m, Penstock Length & Dia.= 890m & 1.35m, Pelton 3x5 MW Position held: Senior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Nagdar Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore

Client: HEB, AJ&K. Main Project Features: Installed Capacity=35 MW, Gross Head=470m, Annual Energy=146 GWh, Plant Factor=47.64%, Design Discharge=9 m3/s, Pressure Shaft Length & Dia =680m & 2.1m, Horizontal Pelton 4x8.75 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings Feasibility Study and Detailed Engineering Design of Luat Hydropower Project in

Name of Assignment or Project: Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K.

Main Project Features: Installed Capacity=49 MW, Gross Head=618m, Annual Energy=214.13 GWh, Plant Factor=49.9%, Design Discharge=9.6 m3/s, Pressure Shaft Length & Dia =904m & 2.4m, Horizontal Pelton 4x12.25 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Dowarian Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=40 MW, Gross Head=510m, Annual Energy=170.83 GWh, Plant Factor=48.77%, Design Discharge=9.6 m3/s, Penstock Length & Dia =1180m & 1.7m, Horizontal Pelton 4x10 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Janawahi Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=12 MW, Gross Head=400m, Annual Energy=52.47GWh, Plant Factor=49.9%, Design Discharge=3.6 m3/s, Penstock Length & Dia =970m & 1.2m, Horizontal Pelton 3x4 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Shounter Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=48 MW, Gross Head=133m, Annual Energy=222.49 GWh, Plant Factor=52.93%, Design Discharge=45 m3/s, Pressure Shaft Length & Dia =350m & 3.4m, Vertical Francis 6x8 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Taobut Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=10 MW, Gross Head=66m, Annual Energy=47.68 GWh, Plant Factor=52.8%, Design Discharge=20 m3/s, Penstock Length & Dia =115m & 2.4m, Francis 4x2.5 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports

Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Jagran-III Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: M/s SJS (Pvt.) Limited. Main Project Features: Installed Capacity=35 MW, Gross Head=141m, Annual Energy=162.88 GWh, Plant Factor=53.1%, Design Discharge=32 m3/s, Pressure Shaft Length & Dia =490m & 2.8m, Vertical Francis 4x8.75 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Jagran-IV Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=22 MW, Gross Head=156m, Annual Energy=98.20 GWh, Plant Factor=52.8%, Design Discharge=18 m3/s, Penstock Length & Dia =180m & 2.5m, Vertical Francis 3x6 & 1x4 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Changan Hydropower Project in Neelum Valley, AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=9 MW, Gross Head=360m, Annual Energy=38.46 GWh, Plant Factor=48.9%, Design Discharge=3 m3/s, Penstock Length & Dia =612m & 1.2m, Horizontal Pelton 3x3 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports

Project drawings

Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Hariyola - Zaminabad Hydropower Project in AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=14 MW, Gross Head=336m, Annual Energy=75.48 GWh, Plant Factor=61.6%, Design Discharge=5.2 m3/s, Penstock Length & Dia =1390m & 1.45m, Horizontal Pelton 4x3.5 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Hydrological and sedimentation studies Installation of gauging station, flow measurement and sediment sampling Project documentation and reports Project drawings

Name of Assignment or Project: Detailed Engineering Design of Qadirabad Hydropower Project in AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=3 MW, Gross Head=222m, Annual Energy=18.26 GWh, Plant Factor=68.4%, Design Discharge=1.7 m3/s, Penstock Length & Dia =515m & 1.0m, Horizontal Pelton 2x1.5 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Project drawings Project documentation and reports

Name of Assignment or Project: Detailed Engineering Design of Rerah Hydropower Project in AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=3.2 MW, Gross Head=201m, Annual Energy=18.86 GWh, Plant Factor=66.7%, Design Discharge=2 m3/s, Penstock Length & Dia =378m & 1.0m, Horizontal Pelton 2x1.6 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Project drawings Project documentation and reports

Name of Assignment or Project: Detailed Engineering Design of Hajira Hydropower Project in AJ&K. Year: 2009 - 2010 Location: Lahore Client: HEB, AJ&K. Main Project Features: Installed Capacity=3 MW, Gross Head=203m, Annual Energy=18.68 GWh, Plant Factor=70.37%,

Design Discharge=1.8 m3/s, Penstock Length & Dia =393m & 1.0m, Horizontal Pelton 2x1.5 MW Position held: Junior Engineer Activities Performed: Hydraulic design of project components Project drawings Project documentation and reports

Name of Assignment or Project: Feasibility Study of 9 MW TP Link Tail Hydropower Project. Year: 2008 2010 Location: Muzaffargarh Client: New Park Energy Ltd Main Project Features: Installed Capacity=9 MW, Gross Head=4.5m, Annual Energy=34.1 GWh, Design Discharge=260 m3/s, Pit Kaplan 3x3 MW Position held: Junior Engineer Activities Performed: Hydrological and sedimentation studies Project documentation and reports

Name of Assignment or Project: Feasibility Study of 9 MW BS Link Tail Hydropower Project. Year: 2008 2010 Location: Okara Client: New Park Energy Ltd Main Project Features: Installed Capacity=9 MW, Gross Head=3.5m, Annual Energy=40.5 GWh, Design Discharge=340 m3/s, Pit Kaplan 3x3 MW Position held: Junior Engineer Activities Performed: Hydrological and sedimentation studies Project documentation and reports

10. CERTIFICATION: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein my lead to my disqualification or dismissal, if engaged.

_________________________________________________ (Signature of staff member or authorized Representative of the staff) Full name of authorized representative: _____________________

Date: 12.07.2012 Day/Month/Year