Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Calculations
Date:
12/04/11
Tender
Job No:
11.203
Sheet No:
RS-01
Construction
Output
Roof Slab
One Way Spanning Continuous Slab
Loading
Gk = 0.22 x 24 + 0.5 + 0.5 = 6.28kN/m2
Qk = 5.0kN/m2
Bending Moment Check
From Analysis
Msag = 55.8kN/m2
Mhog = 66.2kN/m2
End Span
V = 61kN
Qk = 5.0kN/m2
Class C4 & C5
Dance Hall, Concert,
Pub Usage
Sagging
b = 1000mm
fcu = 30N/mm2
d = 220-20-6 = 194mm
k = 55.8x106/30x1000x1942 = 0.049
z = 0.942d = 182.7mm
As,req = 55.8x106/182.7x360/1.15 = 976mm2/m
As, prov 12 @150 c/c 754mm2/m
2
Lower Qk
3.0kN/m2
Msag = 44.1kN/m2
Mhog = 52.8kN/m2
V = 49.1kN
As, req, sag = 771mm2/m
Class C of BS6399
2.0 + 1.0 = 3.0kN/m2
capacity
OK
Hogging
d = 220-20-14/2 = 193mm
k = 52.8x106/30x1000x1932 = 0.047
z = 0.944d = 182.2mm
As, req = 52.8x106/182.2x0.87x360/1.15 = 925.2mm2/m
As, prov 14 @ 150c/c 1026mm2/m OK
Shear Check
vc = 0.79 x 5311/3 x 30/251/3/1.25 = 0.54N/mm2
v = 49.1x103/193x1000 = 0.25N/mm2 OK in Shear
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
13/06/11
Tender
Calculations
Job No:
11.203
Sheet No:
C.C-01
Construction
Output
Slabs
20mm
Beams 25mm
Columns 30mm
(15mm + 5mm)
(20 bar + h (5mm)
(24 bar + h (5mm)
Project Title:
Addis Hotel
Part of Structure:
Originator:
Checker:
Calculations Status:
Preliminary
Date:
Planning
Tender
Job No:
11.203
Sheet No:
SK-01
Construction
Calculations
6
33.6
30.3
27.0
23.7
36.7
Height
32.7
4.0
29.25
3.45
1
Roof
7th
6th
3.45
25.8
5th
3.45
22.35
20.4
4th
3.45
18.9
17.1
3rd
3.45
15.45
13.5
2nd
3.3
12.15
10.5
1st
3.0
9.15
Service
Floor
7.8
6.15
3.0
Mezzanine
4.5
2.25
3.9
Ground
0.00
-2.1
-4.2
Basement
-6.2
Section at G.L G
Project Title:
Addis Hotel
Part of Structure:
Global loads
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
12/04/11
Job No:
11.203
Sheet No:
L-03
Tender
Calculations
Output
Construction
Project Title:
Addis Hotel
Part of Structure:
Loading
Originator:
EH
Checker:
Calculations Status:
Preliminary
Calculations
kN/m2
= 6.0
= 0.5
= 0.5
7
Beam, 0.3 x (0.65 -0.25) x 24 = 2.88kN/m
Ground Floor
Gk
0.2 x 24
Ceiling & Services
Finishes
Qk
Partitions
12/04/11
Tender
11.203
Sheet No:
L-02
Construction
Output
Mezz Floor
Gk
0.25 x 24
Ceiling & Services
Finished
Qk
Partitions
Planning
Date:
Job No:
= 5.0
= 1.0
6.0
= 4.8
= 0.5
= 0.5
5.8
= 5.0
= 1.0
6.0
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
12/04/11
Tender
Job No:
11.203
Sheet No:
L-01
Construction
Calculations
Output
kN/m2
= 5.28
= 0.5
= 0.5
6.28
= 2.0
= 1.0
3.0
kN/m2
= 5.28
= 0.5
= 1.15
Screed to Falls
Asphalt
Insulation
= 2.3
= 0.2
= 0.07
9.5
Qk (and plant)
= 5.0
Terrace (Actual)
Gk
kN/m2
5.28
0.5
110
379
= 7.5kN/m2
Waffle Floor
150
Gk
[0.75 x 0.2 x 24 x 2 x 8] + [0.15 x 1.863 x 8 x 24] +
750
[0.2 x 0.45 x 24 x 1.863]
= 115.3kN 115.3/8x1.863 = 7.74kN/m2
200
1463
Project Title:
Addis Hotel
Part of Structure:
Roof beams
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
12/04/11
Tender
Job No:
11.203
Sheet No:
RB-01
Construction
Calculations
Summary of Reinforcement
Provided
Sagging 12 @ 130
Hogging 14 @ 150
Transverse 10 @ 170
Output
mm2/m
869
1026
461
Required mm2/m
835
1019
286
Project Title:
Addis Hotel
Part of Structure:
Roof beams
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
12/04/11
Tender
Calculations
Job No:
11.203
Sheet No:
RB-01
Construction
Output
Gk = 6.28 kN/m2
ULS = 13.59kN/m2
Qk = 3.0 kN/m2
Use 13.59 x 6 = 81.55kN/m
Bending Moment Check
Msag = wl2/14 = 372.8kNm
Mhog = wl2/12.5 = 417.5kNm
V = 0.6F = 391.44kN
Sagging
b = 300mm
d = 650 - 8 - 25 - 10 = 607mm
fcu = 30N/mm2
k = 372.8x106/30x300x6072 = 0.112
z = 0.854d = 518.4mm
As, req = 372.8x106/518.4 x 0.87 x 360 = 2296mm2
As, prov = 5 x 20 = 1570mm2
- not adequate
Design as a T-Beam
MR = 0.45fcubhf(d-hf/2)
b = 0.7x 8000/10 + 300 = 860mm
hf = 220mm
MR = 1269.4kNm NA in flange
k = 372.8x106/30x560x6072 = 0.039
z = 0.95d = 576.65mm
As,req = 372.8x106/576.65x.087x360 = 2064.2mm2
Hogging
d = 650 - 25 - 10 -24/2 = 603mm
b = 300mm
k = 417.5x106/30x300x603 2 = 0.128
z = 0.828d = 499.28mm
As, req = 417.5x106/499.28x0.87x360 = 2670mm2
As,prov = 7 x 24 3166mm2
As Total Beam,
Provided
1570 + 3166 = 4736mm2
Required
4966mm2
Shear Check
100As/bd = 100x3166/300x603 = 1.75 vc = 0.76N/mm2
10 Shear Links, Asv = 157mm2
Sv = 157x0.87x360/300x(2.16-0.76) = 116.9mm
10 @ 70 c/c provided OK
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Calculations
Calculations
Planning
Date:
14/04/11
Tender
Job No:
11.203
Sheet No:
HR-03
Construction
Output
Output
Output
2
2
Lift
Analysis
Reinforcement
Waffle
Column
G
Shade
Wall
=E/3
1=
off
7.12kN/m
2/G
Rib
pressure
Basement
Slabs
Areas
InProvided
Effectn = 14.768kN/m
ULS =1.4x6040
+ 1.6x2208
Required
= 10,576kN
Fy = 360/1.15
kG
k6040kN
2
4
See
Sagging
Symmetrical
Q
L
=
Q
=
2.7m
following
2208kN
=
3.0kN/m
Steel
;
b
=
Loads,
RAM
0.2m
output
;
Short
I
=
0.328m
=
&
for
12
Braced
analysis
@
130c/c
results
N
=
0.35f
(vertical
0.7Ascfy
=313.04N/mm2
k
k
cuAc + loads)
2
2
2
2
G
Effective
+ 1.0
Under
= 8.74kN/m
Column
= 869mm
x 1.4 /m
=>
773mm
UDL
= 21.84kN/m
/m Gk Qk
Cumulative
k = 7.74Pad
Roof
1/2
2 22
2
Results
Hogging
Q
10,576x103
Punching
(6040+2208/400)
Wall
= 5.0
2, Weight
3,+Steel
at
4,
1.0
=
Column
5
0.35x35x850
&
== 6.0kN/m
6
0.3x0.65x24
=
4.54m
=
x
14
1.6
+
=
0.7xA
@
468kN/m
150c/c
x360
UDL
Gk
Qk
k Self
sc
6.28x8x6 + 3.1x8 + 3.3x0.6 x24 354
2
4
2
2
Beam
A
L
=
=
2.7m
7874mm
GL
;
3
b=0.2m
G
Disperse
=
7.12
;
I
Load
x
=
(6-0.3)
0.328m
=1026mm
@
2
+
on
4.68
1
/m
Down
=
45.26kN/m
Beams
935mm
/m
sc
k
Terrace
(48-1.75x8) x (9.5-6.28)
110
2
Msc,
Transverse
Ribs
A
Say
4.5x4.5x0.5
=@=
177kNm
1.7m
16 Q
xSteel
c/c
= 3x6
=Pad
7238mm
18.0kN/m
=
10
A
= 20.25m2
Accepted as our
sagprov
k24
p@170c/c
Imposed
5dp.
x 48
240
2
MthhogFloor
Perimeter
Area
Columns
=Panel
119kNm
=n=0.85x4
=A1.4
48m
+17.12
4x(1+1+0.5)
= +461.7mm
1.6 x 3==213.4m
/m
14.77kN/m2
286mm2/m
3985
loads higher
1680
than
B =x
7
2
2
V = 153kN
Moment
However
Grids
1 &=rebar
4wl2/8drgs
=6.28x8x6
21.84x1.7x12
say 800x800
/8Col.
668.3kNm
those used in MGM
+ 3.1x8
+= 3.3x0.6
x24
354
Asses
Shear
A
d
Assume
=Consider
500-50-16-10
==
Effect
12,486mm
21.84x1.7x0.5x8
equal
Slab
ofstorey
Centre
Loads
=2 424mm
heights
Span
on= Beam
148.5kN
Opes
& 550x550
as
- 1250mm
2-Way
average
Spanning
widedimensions
design
sc,
req
3x48
144
AB3.15 = 7.33N/mm2
3
th
vBending
BS
=
10576x10
8110
Moment
Table
/850x4x424
Check
6col Floor
B
3
b==0.55x0.55
Bending
ILinks
300mm
Moment
/12As
xCheck
9Above
= 0.0686m4 Not permitted
354
p/2
d sag
M
b
24/4
=Consider
Col
650-25-10-24/2
200+1500
== 25.4kN/m
+
6 Dispersal
Beam
= 1700mm
Links
through
= 603mm
Provided
3 Beams
= 8 @ 200c/c
AsGL
Above
144
p/2
f5cuth==
b
d=
12
Grids
Load
900-25-8-24-12
1000-1250/2
=
30N/mm
2288
&from
3 2Slab= 4B
375mm
= 831mm
D3
Adequate
Floor
66 63
22 2
vk =
Say
177x10
25.4x10
668.3x10
10576x10
600x600
L
/30x300x603
=
/30x1700x831
average
/13400x424
6m
3.33
=0.054
0.060
1.86N/mm
= size
0.019 2
x/30x375x194
y/Lcolumn
x ==
As LAbove
354
z = 0.95d
0.936d=L=789.45mm
0.928d
564.41mm
= 20m
OK
y 180.0mm
W8
AsAAbove
144
p
3
6
4
2
Ath=s,=req
ITotal
0.6x0.6
=Load
177x10
=
/12
10,576kN
x=/0.87x360x564.41
90.25m
= 0.097m
ULS
L
6.350m
;b
; I = 5.33m=4 1001.92mm
4
Floor
6
2
As,req
At
top
Edges
==5of
668.3x10
25.4x10
x 500
20
Discontinuous
dp.
6/180x0.87x360
1571mm
/789.45x0.87x360
Slab
450.5mm
= 2703mm
edge2 2
s, 3
prov
req
As
Above One= Long
354
2
2
2
A
p/2
Find
=
Centre
10576/20.45+48
12
6
x
24
@
of
150c/c
=
Twist
0.63
2714mm
=
Continuous
754mm
154.9kN/m
/m
Edge
6040
2208
s, prov
sx
W9
As Above
144
2 4
rdhog
M
Perimeter
Lift
Moment
J/4
=
119kNm
=
V
on
0.85x4
=
Beam
0.63x14.77x6
+4x(0.75x2+0.5)
B1
=
wL
/24
=
55.83kN/m
+WL/16
=
11.4m
over
0.75
span
sx
L
5.8m ; b = 0.2m : I = 3.25m
3 =Floor
2
2
As, prov
Shear
Opes
7Check
x Adequately
24 As
3166mm
Provided
> 1001mm
for by adjacent
(M = 177kNm)
strips in
terms
Hogging
of strength
Reinforcement
Above
354
32
22
vV ==Slab
10576x10
148.5x103/200x831
Panel B3
/11400x424
to
I2
=
0.894N/mm
=
2.19N/mm
Adequate
154.9x4.5x1.5
/24
+
154.9x1.5x0.5x1.5/16
=
76.24kNm
W10
As Above
144
nd
100A
=L100x2714/200x831
6m Lwidth
/Lx =resisting
10
=
1.63
OK
Full
slab
wide
shear
s/bd1000
x =
y1.1m
L
= Floor
5.8m
less
doors,
W x 2.3m
H
2
2
3
2
vShear
0.74N/mm
Check
Ly =on
60m
acceptable
2000
Beam
c==
I
3.25
2(0.2x1.1
/12dp.
+ 0.2x1.1x1.4
) = 2.34m4
As
Above
354
V =Shear
153kNok, seeAs
previous
Above TEDDS sheets
144
3
v st=2Floor
Min
153x10
Short
Links
Edges
/300x603
Discontinuous
= 0.847N/mm2 < 0.8fcu = 4.38N/mm2
W11
1
2 =
3
4
100A
100x628/300x603
0.54
= 0.347
s/bd /12
sx=0.2x1.1
I =
0.2x3
/12 = 0.43m
As Above
354
1/3
1/3
2
vcsv==
A
Lift
3/J
0.79x0.347
0.4x200x110/0.87x360
V
=
0.54x14.77x6
x(30/25)
/1.25
=
=
28.01mm
47.85kN/m
=
0.472N/mm
sx
REF
I 2
y
Iy
Iy2
AsI Above
144
Assumed
Dimensions
W12W1
0.328
1.05
0.344
-2.61
-0.856
2.234
4 UDL
vService
Links
vW2
+ 0.4
OK
Provide
on Beam
min=links
55.83
= 103.68kN/m
c Total
I
=<
0.45m
0.328
1.05+ 47.85 0.344
-0.01
-0.003
0.00
Asv =W3
100.5mm 0.328
2 legs of 8 +1.05
0.344
2.59
0.850
2.20
(3.02+1)x48
2.7x0.852x(/4)x24
230
See
Spreadsheet33.25
W13
W4Attached 0.328
10.91
-5.36
-1.758
9.42
30x48
144
4A
Sv=Location
=4.35m
100.5x(300/1.15)/300x0.4
= 218.6mm
As, prov
s, req 10.91
L
; b = 0.250m
W5
0.328 ; I = 1.71m
33.25
-2.76
-0.905
2.50
Mezz
Sv, maxW6
= 0.75x603
= 452mm
Moment
0.328
34.75
11.40
3.24
1.060
3.44 Use more
7x48
+ 8x2x2.88
2
2
Grid
3558mm
3166mm
W14
W7C
0.328 +3.3x0.85
34.752x(/4)x24
11.40
5.84
1.920
11.19detailed analysis
427
4 542kNm
Shear
Links
Provided
I = 0.43m
C1
0.274
0 Adequate
0
15.09
4.130
62.39
6x48 8 @ 150c/c
288
2
B
to
C
1570mm2 22.64on RAM
C2
0.274
0 3704mm0
9.09
2.490
Ground
Deflection
W14
C3 829kNm
0.274
0
0
3.09
0.847
2.616
5.3x48 + 16x2.88
4
800/603
= 13.26
OK
Il/d
==
0.45m
C4
0.274< 26
0 2x(/4)x240
-2.91
-0.80
2.32
+4.5x0.85
386
6x48
288
Total
2.57
45.65
120.95
Shear
Wall GL A
Basement
REF
I
I Shear Wall GL
y J
Iy
Iy2
Col.
0.85x0.85x4.2x24
73 48.9
W8/ I Total = 45.65/2.57
5.33 = 17.76m9.175
-0.085
-0.45
0.04
= Iy Total
BeamsW9
2x0.5x16x24
384
3.25
8.9
28.93
0.19
0.62
0.12
?
1.1x48x19
1003
W10
2.34
8.9
20.83
0.19
0.44
0.08
100 dp. Slab
0.1x48x24
115
1575
0.43
13.5
5.81
-4.41
-1.90
8.36
Qk 48W11
x5
W12
0.45
13.5
6.08
-4.41
8.75
240-1.98
W13
1.71
9.5
16.25
-0.41
-7.54
0.29
500 dp.
Slab 0.5x(48-16x0.5)x24
480
W14
0.43
4.5
1.94
4.59
1.97
9.06
W15
0.45
4.5
2.03
4.59
2.07
9.48
Total
14.39
130.77
36.18
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
14/04/11
Tender
Calculations
Job No:
11.203
Sheet No:
HR-04
Construction
Output
Eccentricity
Width = 18m
= 9.09m North of Grid Line 2
Eccentricity = (9.09+6) 18/2 = 6.09m
Parallel to
Walls
Perpendicular
to Walls
Parallel to
Walls
Moment on walls
Mwall = Mexternal x {EIwall/EIwall + MeccxEIwall/EIy2+EIy2}
Perpendicular
to Walls
= 0.328/2.57 6.09x0.856/120.95+36.18
= 0.094
W2
= 0.328/2.57 6.09x0.003/157.13
= 0.128
W3
= 0.328/2.57 + 6.09x0.85/157.13
= 0.161
W4
= 0.328/2.57 6.09x1.758/157.13
= 0.059
W5
= 0.328/2.57 6.09x0.905/157.13
= 0.093
W6
= 0.328/2.57 + 6.09x1.06/157.13
= 0.169
W7
= 0.328/2.57 + 6.09x1.92/157.13
= 0.202
C1
= 0.274/2.57 + 6.09x4.13/157.13
= 0.267
C2
= 0.274/2.57 + 6.09x2.49/157.13
= 0.203
C3
= 0.274/2.57 + 6.09x0.847/157.13
C4
= 0.274/2.57 6.09x0.80/157.13
= 0.033
= 0.076
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Date:
Planning
14/04/11
Tender
Job No:
11.203
Sheet No:
SW-01
Construction
Calculations
Output
Check Wall W7
FH = 20.2%
Moment at Ground Level
M = 68x40.9 + 136x(39.6+33.45+30+26.55+23.1+19.65+16.2)
+ 136x(12.9+8.7+4.2)
M = 31565.6kNm
Moment in Wall at Ground
= 31565.6 x 0.202 = 6376.25kNm
Axial Load
Self Weight = 0.75 + 2.7/2 x 0.2 x 24 x 36.7 = 370kN
In Basement
?
Slab
Beams
?
Hardcore
Screed
Return Wall
Ground Slab
0.25x24x2.7x3
0.5x3.6x1.8x24
1.5x3.6x2x0.5x24
3.6x1.8x19x1.1
3.6x1.8x0.3x20
0.1x24x3.6x1.8
3.6x2.3x0.25x24
N/A
= 48.6kN
= 77.76kN
= 129.6kN
= 135.43kN
= 38.8kN
= 15.5kN
= 49.68kN
495.4kN
Total
865.25kN
Project Title:
Addis Hotel
Part of Structure:
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Calculations
Date:
14/04/11
Tender
Job No:
11.203
Sheet No:
SW-02
Construction
Output
Rebar in Wall
d = 2700-20-10-20/2 = 2660mm
b = 200+0.7x3450/10 = 441.5mm
fcu = 35N/mm2
k = 63576.25x106/441.5x35x26602 = 0.0583
z = 0.93d = 2473.8mm
As, req = 6376.25x106/0.87x360x2473.8 = 8229.6mm2
Legs
370x103/0.87x360 = 1181mm2
As, net = 8229.6 1181 = 7048.2 mm2
As, prov = 16 x 20 = 5026.5mm2
Column Moments
Say equal storey heights & stiffness on cross section
C1 grid takes 26.7%
Total load
136x10 + 68 = 1428kN
Conservative hand
calculation,
computer model
would yield more
accurate results
Project Title:
Addis Hotel
Part of Structure:
Column design
Originator:
EH
Checker:
Calculations Status:
Preliminary
Planning
Date:
14/04/11
Tender
Job No:
11.203
Sheet No:
SW-03
Construction
Calculations
Gk = 3985x0.8 = 3188kN
Qk = 1680x0.8 = 1344kN
N ULS = 1.2x3188 + 1.2x1344x0.6 = 4793kN
600x600 Col at Gnd
d = 600-30-8-24/2 = 550
d/h = 0.92
N/bhfcu = 4793x103/6002x35 = 0.38 ; M/bh2fcu = 1.2x100x106/600x6002x35 = 0.0159
From Design Charts
P = 0%
Use axial load formula
N = 0.4fcuAc + 0.8Ascfy
4793x103 = 0.4x35x6002 + 0.8x360xAsc
Asc = 807mm2 => min steel
Asc, prov =16 x 24 7238mm2 Column Rebar OK
Output