Professional Documents
Culture Documents
Steam Turbines - Turbotech
Steam Turbines - Turbotech
Steam Turbines - Turbotech
The Problem ELECTRICITY COSTS ARE RISING RAPIDLY RAPIDLY, SQU SQUEEZING OPERATING GO G MARGINS
The Solution Sol tion MAKE THE PLANT AS ENERGY EFFICIENT AS POSSIBLE, OSS , PREFERABLY USING EXISTING RESOURCES
TurboTech Precision Engineering Private Limited
28/29 Second Main, Rajajinagar Industrial Town, Bangalore 560 044.
Current Scenario
16 Kg/cmg/Sat 12 TPH
PRDS
NO POWER GENERATED
TurboTech Precision Engineering Private Limited
28/29 Second Main, Rajajinagar Industrial Town, Bangalore 560 044.
TurboTech Solution
16 Kg/cmg/Sat
12 TPH
PRV
~
300 KWe Generator TurboTech Precision Engineering Private Limited
28/29 Second Main, Rajajinagar Industrial Town, Bangalore 560 044.
TurboTech Solution
Description of ECT
Impulse/ Curtis Stage turbine, directly turbine coupled to Step-Down Gearbox, driving an Generator Power Rating: 75 to 500 kW All steam-wetted parts are Stainless Steel for long corrosion-free life l i f lif Turbine is machined from a solid Hardened Stainless Steel forging for maximum life in any Steam service Precision CNC milled aerodynamic blading y g
TurboTech Precision Engineering Private Limited
28/29 Second Main, Rajajinagar Industrial Town, Bangalore 560 044.
Description (contd.)
80% Depreciation allowed in First Year according to current IT Rules Payback : 9 Months 2 Years
TurboTech Precision Engineering Private Limited
28/29 Second Main, Rajajinagar Industrial Town, Bangalore 560 044.
Project Cost
300 Kwe Installation
Turbine basic cost E.D(16.32%) C.S.T(4%) Supervision of Erection Freight Expansion Bellows Turbine Erection Electric Cabling Steam Piping etc. Civil Ci il Work Miscellaneous Less modvat TOTAL INVESTMENT 39 6.36 1.81 3 0.2 0.6 1 1 2 0.5 05 1 6.36 50.11
Rs.in Rs in lakhs
Payback
6 months
Why Sat. Steam Turbine and not Super Heated Turbine S per T rbine
Super heated(SH) turbine requires a superheater in the boiler. Hence Cost SH turbine requires a desuperheater down q p stream as all processes use sat steam. Involves investment and running cost SH b il requires d boiler i de-min water. Again i t A i investment and running cost Lastly and not least INCREASE IN FUEL CONSUMPTION in SH steam boiler ( approx. 15-22% increase)
TurboTech Precision Engineering Private Limited
28/29 Second Main, Rajajinagar Industrial Town, Bangalore 560 044.
4943.426139 12.48739496 1359.722341 1359 722341 850 1.599673343 245 5.549887108 5 549887108
10 9.2 0.92 0.8 4137.007494 15.20661157 446.6963038 446 6963038 605 0.738340998