Professional Documents
Culture Documents
Rd-011 Future Process Model
Rd-011 Future Process Model
Author:
<Author>
Creation Date:
Last Updated:
Document Ref:
Version:
DRAFT 1A
Approvals:
<Approver 1>
<Approver 2>
DOCUMENT CONTROL
1.1
Change Record
2
Date
Author
Version
Change Reference
22-Nov-10
<Author>
Draft 1a
No Previous Document
1.2
Reviewers
Name
<Subject>
File Ref: 114999157.doc
Position
8 of 10
Contents
1 Document Control......................................................................................................................ii
1.1 Change Record..........................................................................................................................ii
1.2 Reviewers..................................................................................................................................ii
2 Introduction.................................................................................................................................1
3 Event Catalog for <Business Area Name>................................................................................2
4 Business Actors for <Business Area Name>............................................................................3
5 Process Descriptions for <Business Area Name>....................................................................4
5.1 Process Step Catalog for <Process Title>..................................................................................4
6 Process Flow Diagram for <Business Area Name>..................................................................5
7 Open and Closed Issues............................................................................................................6
7.1 Open Issues..............................................................................................................................6
7.2 Closed Issues............................................................................................................................6
<Subject>
File Ref: 114999157.doc
8 of 10
Doc Ref:
INTRODUCTION
This document presents the Future Process Model constructed for the <Application Name> system.
The Future Process Model documents the triggering events that drive the business areas that are to be
automated and describes the future business process that the business executes in response to each
of those events as a set of one or more activities.
(v. )
8 of 10
Doc Ref:
Name
Type
Description
Frequency
Type
Description
Frequency
Type
Description
Frequency
Type
Description
Frequency
Event
ID
Title
Responding
Process
ID
Name
Event
ID
Title
Responding
Process
ID
Name
Event
ID
Title
Responding
Process
ID
Name
Event
ID
Title
Responding
Process
(v. )
8 of 10
Doc Ref:
(v. )
8 of 10
Doc Ref:
Title
Frequency
Notes
Automation
Output ID
Title
Type
ID
Title
Frequency
Notes
Automation
Output ID
Title
Type
ID
Title
Frequency
Notes
Automation
Output ID
Title
Type
ID
Title
Frequency
Notes
Output ID
Automation
Title
Type
(v. )
8 of 10
Doc Ref:
(v. )
8 of 10
Doc Ref:
7.1
ID
Issue
Resolution
7.2
ID
Open Issues
Responsibility
Target Date
Impact Date
Responsibility
Target Date
Impact Date
Closed Issues
Issue
Resolution
(v. )
8 of 10