Professional Documents
Culture Documents
Devapur Proposals 26.nov.2011
Devapur Proposals 26.nov.2011
Devapur
Description
Units
Savings
Compl. Time Project Cost Pay back in Months (Rs. Lacs) period (Yrs.) (After sanction is available)
1.30 2156.00 36.00 0.77 250.00 555.00 720.00 620.00 988.00 235.00 1325.00 509.00 933.00 8291.00 3.51 18 4 to 18 12 to 18 6 to 18 3 to 12 6 to 12 6 to 8 6 to 12 3 to 12 4.31 6 to 12
2 3 4 5 6 7 8 9
Obsolete items Replacement items Spares items Capex Safety & Environment Quality improvement & Material handling Civil works in Plant- Development & Renovation Civil works in Township area Total
Jalgaon 1 2 3 4 5 Energy savings Reliability Safety & Environment Quality improvement Civil works Total kWh/MT cement 0.75 52.50 153.80 210.50 38.00 392.00 846.80 0.50 8 6 to 12 3 to 6 3 to 8 6 to 12
Project Cost (Rs. Lacs) Devapur Jalgaon P1 3464.00 604.80 P2 4827.00 242.00 Total 8291.00 846.80
Total
4068.80
5069.00
9137.80
S.No
Section
Proposal Description
Kiln-1
1.50
26
1800.00
6.00
12
Apart from thermal saving there will be reduction in clinker temp. & hence improved life of belt conveyors (Needs 45 days of Kiln stoppage) Apart from thermal saving, improved clinker quality Power saving & improved process control Power savings & better process control Power savings & process control Power saving & improved process control Power saving Power savings
2 3 4
200.00 60.00 10.00 2070.00 8.00 28.00 8.00 18.00 Total 62.00 24.00 Total 24.00 250.00
12 12 12
5 6 7 8
9 6 6 12
Kiln-3
0.21
2.22
12
10
Replacement of FK pump by Cement providing mechanical transport mill-1 system to feed Cement silo no 5
1.67 Total
3.51
18
2406.00
Priority (P1/P2)
P2
P1 P1 P1
P1 P1 P1 P1
P2
P2
S.No Section
Proposal Description
Priority (P1/P2)
Obsolete 1 Raw mill-2 2 3 4 5 6 7 8 Inst. Inst. Inst. Inst. Inst. Electrical Electrical
Mill discharge bucket elevator chain Kiln-1 Main Drive upgrade to DCS800 system ESP controller upgrade for Cooler-1 &2 Packer-3& 4 upgrade Kiln-2 PLC I/O upgrade Integration of SCADA,s on one platform with MIS option Replacement of MCC in Packing Plant-2Nos,Kiln1,Additive Crusher & CM-1 (Total-5Nos.) Main PDB Replacement -- Kiln-1 , CM-2 & Colony Total
200 25 25 50 30 90 60 75 555
18 6 6 6 6 8 6 4
Obsolete Design , spares not available System is obsolete and spares of DCS 500 are not available . Obsolete and efficiency of ESP will be improved Obsolete and accuracy not up to mark. Obsolete and spares not available Obsolete and MIS Report option is not available. Modification & upgrade cumbersome. Fault finding is not easy. Obsolete & Spares are not available Obsolete & Spares are not available
P1 P2 P1 P1 P1 P2 P2 P2
Replacement Items Cooler hammer mill upgradation (If total cooler modification is done this is not required) To avoid kiln stoppage due to hammer mill mouth jamming with clinker lumps, due to hammer mill inadequate capacity (Kiln running hrs. lost -Approx. 36 hrs annually) At present running above capacity, No margin available May be defered for 2 years (under observation) Present system is undersize creating repeated spillage To replace present Duoflex burner for better reliability
Kiln-1
100
12
P2
10 11 12 13
PC pre-heater bucket elevator capacity upgradation KILN-1 outlet cowl shell replacement. Kiln-1 1st tyre shell with floated chair pads replacement. Kiln-2 dust transport FK pump & screw conveyor capacity upgradation Burner pipe (Pyro jet) Total
18 12 12 12
P2 P2 P1 P1
Spares 14 15 Raw mill-1 Raw mill-1 Spare gear box for roller press (1 nos.) Polycom roller sleeve (2 nos.) 18 12 Common for Devapur & Jalgaon Increase in production by 5 MT P2 P2
S.No Section
Proposal Description
Priority (P1/P2)
16 17 18 19 20 21 22 23
Raw mill-3 Raw mill-3 Kiln-3 Kiln-3 Kiln-3 Kiln-3 Cement mill1&2 Inst.
SKS fan impeller RP fluid coupling unit (1 No.) VRM coal mill roller complete assembly with yoke Primary air fan complete assembly as a stand by equipment (for all 3 kilns) Pre-heater fan impeller with shaft assembly Standby panel for kiln-3 main drive RP fluid coupling unit (1 No.) Common standby panel for kiln-3 PH Fan & Bag house fan with bypass & switching arrangement HT Spare Motor-- L-1-PC Fan,CM-2-SKS Fan,LSC , RM-2 Vent Fan ----1000KW,1000RPM
15 25 80 25 40 30 25 90
P2 P1 P1 P1 P2 P1 P1 P1
24
Electrical
25
P2
25
Electrical
35
P1
26
Electrical
Spare Transformer for L-3 Kiln Main Drive VFD Applicaton Power Cable for Packing Plant - Trx & CM-2 Clinker feeding MCC HT Spare Motor -- RM-3 SKS Fan, Total
15
P2
27
Electrical
20
P2
28
Electrical
40 620 50 25
P1
Capex 29 30 Raw mill-1 Raw mill-3 ESP dust transportation to CM Automatic welding machine 12 3 Product cost reduction proposal To reduce build up time insitu P1 P1
S.No Section
Proposal Description
Priority (P1/P2)
31 32 33 34 35 36 37 38 39 40 41 42 43 44
Cement mill1&2 Electrical PBSR Cement mill1&2 Cement mill-1 Inst. Inst. Inst. Inst. Inst. Inst. Inst. Inst. Inst.
Lift arrangement in Cement mill for RP-I & RP-II Transformer Oil Filter M/C Extension of reclaimer travel rail length about 30 mtrs.towards west side. Automation of Cement silo change over valves. CM-I, silo elevator capacity to be increased to 200 TPH CCTV cameras in Kiln-1&2 Online bag weight adjustment system for Packer1,2,3,4,5&6 Automation for bulk loading system with connectivity to main server PLC control system for packer-1,2,3,4&5 SLC Input/Output module upgrade to control logix C) Cement Mill-1 A) Raw Mill-1 B) Kiln-1 Kiln-2 (kiln feed) & Kiln-3 (coal and kiln feed) SFF upgradation Transformer--2MVA--- Packing Plant Power Distribution
80 8 70 20 125 30 10 15 40 20 40 50 75
P2 P2 P1 P1 P1 P1 P1 P2 P2 P2 P2 P2 P2
45
Electrical
20
P1
46
Electrical
25
P1
47
250.00
12
P1
S.No Section
Proposal Description
Priority (P1/P2)
48 49
Workshop Workshop
15 20 988
P2 P2
2883
Kiln-1
Separate CO2 purging Automatic control system for fire extingushing in Dust collectors of VRM Coal Mill-1 Present CO2 purging Automatic control system for fire extingushing in Dust collectors of Coal Mill-1 CSP top dust collector
20.00
Kiln-1
20.00
12
Kiln-1
25.00
12
Undersize, creating environment issue To avoid pressurization problem & dusty atmosphere Existing one is project time lift and not suitable for plant running. Environment Friendly.
Kiln-2
50.00
12
Additional lift for pyro-system of line-3 Installation of higher capacity of dust collector on Jalgaon Clinker Silo top Total
100.00
18
20.00 235.00
Priority (P1/P2)
P1
P1
P1
P1
P2
P1
Kiln-2
Kiln rpm to be increased, as present kiln degree of filling is high Particle size Disrtibution Analyzer
To improve clinker quality higher RPM is required (up to 5 RPM as against present 3.8 RPM) 30 8 For Mills Optimisation.Increase in productivity,optimum usage of Fly ash and consistent quality product. Present Storage capacity is sufficient for 40days consumption.To increase storage capacity (approx. 8000 MT, 8 Days ) and avoid Hopper/Crusher jamming ,inconsistent product quality,mill stoppages and Additive Push Feeder breakdowns during mansoon. During monsoon movement of trucks , unloading and dozing/stacking of Gypsum is very difficult due to wet material and jamming of trucks in front of Sheds.To avoid these problems and to increase storage capacity (approx.6000MT) , Sheds extension is required. Present Storage capacity is sufficient for 21 days consumption.To increase storage capacity (approx.16000MT, 9 Days)and avoid crusher jamming/Process problems ,Quality and production loss during mansoon
P2
Quality control
P1
Material handling
25
P2
Material handling
30.00
P2
Material handling
40.00
P2
Material handling
P Total
1200.00 1325.00
P2
Orient Cement : Devapur Infrastructure Development in Plant Area Amount Rs. in Lacs Compl. Time in Months (After sanction is available)
6 6 12 12 12 6 Priority (P1/P2)
S.No.
Job Description
Development Works 1 2 3 4 5 6 Development work in mines office, mines roads & Missamma sagar area Development of garden in plant & beautification Renovation of plant main gates-1&2 Renovation of CCR building (Front elevation,staircase,and wall panelling) Construction of first floor at Administration office building Construction of Refractory brick godown at line -3 Total 10 13 14 Making of RCC approach road from main road to laterite shed Extension of track to accommodate full rake with MU power and 8 wheeler brake van (100 mtrs). Laying of addition line (no.2) for fresh empty clinker rake placement Total TOTAL : 6.00 20.00 50.00 40.00 25.00 8.00 149.00 15.00 140.00 205.00 360.00 509.00 3 12 12 P1 P1 P1 P1 P1 P1 P1 P1 P1
Orient Cement : Devapur Infrastructure Development in Town ship area Amount in Rs. Lacs
6.00 10.00 12.00 12.00 16.00 22.00 25.00 25.00 30.00 50.00 50.00 60.00 125.00 75.00 100.00 150.00 165.00 TOTAL : 933.00
S.No.
Job Description
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Providing and fixing of granite slabs, tiles and wooden cupboards in "C" type quarter kitchen area -24 nos Drain repair work Height increase of boundary wall at Maddimada village side Making RCC Road community hall to old library Providing and fixing of granite slabs, tiles and wooden cupboards in "D" type quarter kitchen area -50 nos Making RCC Road in "F" type quarters Area 500 RMT Development of gardens and beautification work, green house, nursery, STP pump house Water pond development near J type quarter Renovation of Guest House Widening of roads in colony - B type quarter to main gate, C type quarter to D type quarter, Main gate to Temple 5.0 Km Replacement of all PDB's and tower lights Construction of contractor workmen quarters near " J " type quarter - 40 nos Renovation of community hall and Construction of club building, Gym and Library Construction of Shopping complex in Town ship Making stadium view in football ground with seating arrangement with portal crip shed, sports arena Construction of school building E/M and T/M Extention of one bed room & one toilet in " E " type quarters - 110 nos
Priority (P1/P2)
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1