Winter Project Synopsis

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

WINTER PROJECT SYNOPSIS ON THE SUCCESS STORY OF NATIONAL THERMAL POWER CORPORATION

SUBMITTED TO: DR. ASHUTOSH KUMAR

PREPARED BY: ASHUTOSH VATS 2K11B41 PGDM GEN

THE SUCCESS STORY OF NATIONAL THERMAL POWER CORPORATION

Introduction:
NTPC is Indias largest power utility with an installed capacity of 39,174 MW through 16 coal based, 7 gas / liquid fuel and 7 Joint Venture power stations. Presently, NTPC is generating much of its electricity through coal and gas. It is also diversifying into hydroelectric generation and wind power. According to the Corporate Plan of NTPC, the power utility major will have a total generation capacity of 128,000 MW by 2032. As much as 28 per cent of this capacity will be based on non-fossil sources. They are: 11 per cent nuclear, 8 per cent hydro, 6 per cent wind and 3 per cent solar.

Need & Relevance


NTPC is committed to introducing and expanding the use of renewable energy and plans to add 1000 MW capacity addition through Renewable Energy sources by 2017. The company plans to participate in the national objective of developing and promoting clean energy technologies through the National Clean Energy Fund (NCEF) set up by the Government of India in 2010-11. It is planning to begin with three projects, including one solar thermal hybrid plant, with the help of the fund. Hydro capacity of 1,328 MW is under construction at Koldam (800 MW) in Himachal Pradesh, Tapovan Vishnugad (520 MW) in Uttarakhand and Singrauli (8 MW) in Uttar Pradesh. In addition to this, 291 MW capacity is being taken up at Lata Tapovan (171 MW) and Rammam (120 MW) in West Bengal. Since 1975, its year of establishment, it has been a pioneer in the power generation sector of our country with domestic as well as global presence in field power engineering and associated research. Today it is among the Maharatna Company of our nation.

Objectives
To study the success story and develop a case study against it. To understand the reason of success and sustainability. Current market position and future prospects.

Action Plan
Study the online journals to have an overview of the organisation. Get in touch with the senior officials of the company and understand their till date journey in the company and their involvement in this success. The reason and their strategies towards it.

Expected outcome
A wonderful case describing the complete success story and how the things have rolled out till date. This case will tell how National Thermal Power Corporation is different from other public sectors in our country and the reason for such an explosive growth.

Webliography
http://egov.eletsonline.com/2012/09/ntpc-great-success-story-of-our-times/ http://en.wikipedia.org/wiki/NTPC_Limited www.economictimes.indiatimes.com www.ncpedp.org/employ/em-sucs01.htm www.ntpc.co.in/index.php?option=com_content&view

You might also like