Case Study: APM Tunnel/GSE Road

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Case study

Philips lighting Middle East P.O. Box 7785, Dubai Gulf Tower Building, 5th floor United Arab Emirates www.lighting.philips.com
2009 Koninklijke Philips Electronics N.V. All rights reserved. Reproduction in whole or in part is prohibited without the prior written consent of the copyright owner. The information presented in this document does not form part of any quotation or contract, is believed to be accurate and reliable and may be changed without notice. No liability will be accepted by the publisher for any consequence of its use. Publication thereof does not convey nor imply any license under patent- or other industrial or intellectual property rights.

APM Tunnel/GSE Road:


Location Philips Lighting Dubai INternational Airport, Concourse 2 - Terminal 3 CRX200 - Master TL-D Super 80 (customized solution)

07/09

Tunnel vision to aid aesthetics & cost efficiencies


Fast facts
Client Department of Civil Aviation (DCA) Project APM Tunnel/GSE Road: Concourse 2-Terminal 3 Location Dubai Luminaires and controls CRX200 (customized solution) Lamp Lamp: Master TL-D Super 80 (customized solution) Lighting Support Philips Middle East

The Challenge
- The need to create an integrated luminaries system to the APM Tunnel (all power cables were mounted on that system). - The optical system has to provide glass free uniform illumination in both GSE Road & APM Tunnel. - The need to mount luminaries in certain sections at a height of 1 meter from the road level. - The optical system has to enable optimum lighting level on the road.

The Solution
Designing a customized solution that integrates a lighting system with luminaries keeping in view of the following: - Conforming to high aesthetic standards. - Continuous mounting. - Luminaries maintenance without tools. - Meeting the lighting regulation both qualitatively & quantitatively. - Easy installation with a capacity to hold & conceal all power cables with a loop in, loop out arrangement. - Integrated solutions that keeps in cognizance energy efficiency & electronic ballast and glaze free asymmetric light distribution. - Energy & maintenance cost sensitive - achieved saving 10% to 12%

Case study
Philips lighting Middle East P.O. Box 7785, Dubai Gulf Tower Building, 5th floor United Arab Emirates www.lighting.philips.com
2009 Koninklijke Philips Electronics N.V. All rights reserved. Reproduction in whole or in part is prohibited without the prior written consent of the copyright owner. The information presented in this document does not form part of any quotation or contract, is believed to be accurate and reliable and may be changed without notice. No liability will be accepted by the publisher for any consequence of its use. Publication thereof does not convey nor imply any license under patent- or other industrial or intellectual property rights.

APM Tunnel/GSE Road:


Location Philips Lighting Dubai INternational Airport, Concourse 2 - Terminal 3 CRX200 - Master TL-D Super 80 (customized solution)

07/09

You might also like