SM WILSON.

qxd:Layout 1 1/19/09 1:47 PM Page 130

S. M. WILSON & CO. – ALTON MEMORIAL HOSPITAL

“The main lobby creates a new mod- operations managers is a must,” He says the project has been a suc-
ern image for the hospital with sensi- Goodman says. “We coordinate on a cess so far, thanks to the positive rela-
tive design details that humanize the weekly basis and sometimes on a daily tionship S. M. Wilson has with Alton
space,” adds Robert Meyer, Pratt Design basis.” Memorial Hospital, as well as the sub-
Studio project manager. “Relocation of contractors participating in the bed
the lab and pharmacy into the new build- Working in a Wet Season tower’s construction. “We maintain very
ing allows for the logical expansion of Goodman says the most challenging open and honest communications with
radiology and cardiac services into the aspect to the Alton Memorial Hospital our subcontractors, and we look to con-
vacated space, accommodating clinical bed tower replacement project has been tinue that effort throughout the rest of
expansion for anticipated patient constructing the building’s basement. the project,” Goodman says.
growth.” “We are going through what so far has
amounted to the wettest year on record,” Building Partnerships
Coordination ‘A Must’ he states. “It’s definitely been a schedule Positive relationships have fueled S. M.
S. M. Wilson is constructing the new challenge. Wilson’s growth since its inception in
tower while the existing facility contin- “The biggest thing that has happened 1921, according to the contractor. “Building
ues to operate, Goodman notes. to us with all the rain was we over-dug successful partnerships is the cornerstone
“We’re replacing two existing chillers the basement about a foot,” he contin- of our business philosophy at S. M. Wilson
with two brand new chillers,” he says. ues. “We had to bring in a foot of rock, & Co., and the critical success factor in all
“We’re constructing a new generator build- which actually paid off, because we had of our projects,” it states.
ing with two new emergency generators a rock base to work off of down in the Healthcare projects are no exception,
and installing a substation that will power basement. You may lose a day when it the company continues. “Coordination,
the whole campus.” rains, but with the rock base, at least we communication and advanced planning
This requires extensive coordination could get down there the next day and are key,” it explains. “S. M. Wilson’s suc-
with the hospital, he explains. “We have continue our work. That was probably cess with healthcare clients stems direct-
to bring that substation online by doing key to helping us maintain the sched- ly from their relationship with our pro-
a switchover of all the power in their ule, as well as setting up some good fessional project managers and field
existing facility, so coordination and drainage so that the water wouldn’t just superintendents who make each project
good communication with the facility’s sit there.” their own.” ■

130 ■ WWW.CONSTRUCTION-TODAY.COM ■ FEBRUARY 2009