BATTENFELD GLOUCESTER
OEM
Drive Motor
kW (HP)
AC
250 HP
or
1600
Melt Pump?
DC ?
Dia
Gearbox Ratio
16 : 1
Motor RPM
Y ____ N _____
Grooved Feed?
Y ____ N _____
Vented Barrel?
6 INCH
L/D
0 to 100 Max
360 AMP
Screen Changer?
Screw Cooling?
Y ____ N ____
Y ____ N _____
If Yes, then location from back of Feed Opening to centerline of vent hole?
_________ mm
Y ____ N _____
Feed Hole Size
Feed Mechanism
W ________ x Lth_________ or
6IN
Dia Rd
200C 1
25 : 1
200C 2
200C 3
200C 4
______Hopper _______Crammer
________Stuffer
Feed End
Discharge End
_______ Conventional
Feed Length
Feed Depth
Shank
Metering Length
Screw OAL ___________
Metering Depth
________
Rev.01
Resin Data
Application 1
Application 2
Application 3
Materials Used:
LDPE
EXCEED 1327ED
Resin Numbers**
N103X
FL 00014
1327ED
**If resin numbers are unknown please provide samples of materials to be processed. One zip loc baggie per material
sample
Manufacturer:
PETLIN, TPC
EXXONMOBIL
EXXONMOBIL
60%
20%
20%
Regrind %
Regrind Bulk
Density
921
kg / meter3
938
kg / meter3
926.7
kg / meter3
Additives %
FRs
Color*
Minerals
BLEND TOGETHER
If Color - is it,
Resin Drying?
oC /
________________Liquid? /
Hrs
Concentrate? ____________
oC /
Hrs
oC /
Hrs
@ Melt Temp?
@ Screw RPM?
@ Motor Amp?
@ Head Pressure?
800
kg/Hr
200
100
RPM
RPM
RPM
360
Amps
Amps
Amps
PSI
kg / cm2
2,000
kg/Hr
kg/Hr
C
kg / cm2
AGRICULTURE FILM
800
kg/Hr
kg/Hr
kg/Hr
Temperature
200
+/- 4 oC
+/- 4 oC
+/- 4 oC
@ Melt
@ Pressure
Stability
5,000
+/- kg / cm2
+/- PSI
What problems brought about the need for this new screw design?
+/- kg / cm2
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
How will you measure the Melt temperature?
Hand Held Melt Pyrometer _____________ Melt Probe Instrumentation _____________Are they calibrated? ___________
Where will the measurements be taken?
Before Screen Changer ______________ After the Die _________ Other __________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
What goals do you need to achieve with this new screw design?
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
Are there any Special Conditions or Requirements needed to complete the requirement?
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
Thank you for completing our Screw Design Evaluation Form.