LARSEN & TOUBRO LIMITED

ECC Division - EDRC


PROJECT:

DOCUMENT NO

CHHTRAPATI SHIVAJI INTERNATIONAL AIR PORT PVT LTD

DATE
10.12.2009

1-H-T-N36A-PL-DC-010
Calculations of flow and head loss based on cumulative fixture unit
TITLE:

Main dia in shaft and external (Domestic)

DESIGNED

CHECKED

SVD

AVBC

APPROVED

SHEET

SVn

The cumulative F.U through each pipe is worked out and corresponding flow through the pipe is arrived.The head loss through each pipe section will be
worked out based on flow rate through that pipe stretch.

Sl.No.

Pipe reference
From

Fixture Unit Cumulative


in each pipe Fixture Unit
FU
FU

To

Flow
through
Q

AssumedPipe
Pipe
Level at Length of
Velocity
Dia.
roughn
Input
Pipe
D
C
V
Elevation
L

Equivalent
length
Le = 1.25 L

Frictional
loss

hf

Lps

mm

PPR

m/s

Cumulative
Total Head
Frictional
hf
H
m
m

Residual
head
P
m

Available
head after
PRV

Available
Residual
head after
PRV

lvl-0
lvl-1
lvl-1
lvl-2
lvl-1 to 2
lvl-2

1
2
3
4
3
5

2
3
4
A
5
B

40
23.5
7
7
7
7

45
45
27.5
16
4.5

2.97
2.29
1.7
1.7
1.7
1.7

65
45.6
36.2
36.2
36.2
36.2

120
120
120
120
120
120

0.895
1.403
1.653
1.653
1.653
1.653

-1
3.2
3.2
3.2
12.4
12.4

67.1
17.1
1.5
1.5
8.15
1.5

83.875
21.375
1.875
1.875
10.1875
1.875

1.59
1.41
0.22
0.22
1.19
0.22

1.59
3
3.22
3.44
4.19
4.41

105
105
105
105
105
105

104.41
98.8
98.58
98.36
88.41
88.19

55
55
55
55
55

48.8
48.58
48.36
38.41
38.19

lvl-1
lvl-1
lvl-1
lvl-1 to 2
lvl-2
lvl-2 to 3
lvl-3

3
6
7
6
8
8
9

6
7
C
8
D
9
E

9.5
2.5
2.5
7
2.5
4.5
4.5

45
17.5
9.5
7

1.7
1.7
1.7
1.7
1.7
1.7
1.7

36.2
36.2
36.2
36.2
36.2
36.2
36.2

120
120
120
120
120
120
120

1.653
1.653
1.653
1.653
1.653
1.653
1.653

3.2
3.2
3.2
12.4
12.4
16.6
16.6

4.5
1.5
1.5
8.15
1.5
4.2
1.5

5.625
1.875
1.875
10.1875
1.875
5.25
1.875

0.66
0.22
0.22
1.19
0.22
0.61
0.22

3.66
3.88
4.1
4.85
5.07
5.46
5.68

105
105
105
105
105
105
105

98.14
97.92
97.7
87.75
87.53
82.94
82.72

55
55
55
55
55
55
55

48.14
47.92
47.7
37.75
37.53
32.94
32.72

lvl-1 to 18
lvl-18
lvl-1
lvl-19
lvl-19 to 21
lvl-21

2
10
10
11
11
12

10
F
11
G
12
H

16.5
7.5
9
4.5
4.5
4.5

45

2.03
1.7
1.7
1.7
1.7
1.7

54.2
45.6
45.6
45.6
45.6
45.6

120
120
120
120
120
120

0.880
1.041
1.041
1.041
1.041
1.041

69.95
69.95
73.95
73.95
81.85
81.85

65.7
1.5
4
1.5
7.9
1.5

82.125
1.875
5
1.875
9.875
1.875

1.87
0.07
0.19
0.07
0.38
0.07

3.46
3.53
3.65
3.72
4.03
4.1

105
105
105
105
105
105

31.59
31.52
27.4
27.33
19.12
19.05

17.5
4.5

Remarks

LARSEN & TOUBRO LIMITED


ECC Division - EDRC
PROJECT:

DOCUMENT NO

CHHTRAPATI SHIVAJI INTERNATIONAL AIR PORT PVT LTD

DATE
10.12.2009

1-H-T-N36A-PL-DC-010
Calculations of flow and head loss based on cumulative fixture unit
TITLE:

Main dia in shaft and external (Flushing)

DESIGNED

CHECKED

SVD

AVBC

APPROVED

SHEET

SVn

Pipe reference
Sl.No.
From

Fixture Unit
Flow
in each pipe through
FU
Q

To

AssumedPipe
Pipe
Level at Length of
Velocity
Dia.
roughn
Input
Pipe
D
C
V
Elevation
L

Equivalent
length
Le = 1.25 L

Frictional
loss

hf

Cumulative
Total Head
Frictional
hf
H

Lps

mm

PPR

m/s

Residual
head
P
m

Available
head after
PRV

Available
Residual
head after
PRV

lvl-0
lvl-1
lvl-1
lvl-2
lvl-1 to 2
lvl-2

1
2
3
4
3
5

2
3
4
A
5
B

120
88
8
28
28
28

4.6
4.06
2.51
2.51
2.51
2.51

79.6
54.2
45.6
45.6
45.6
45.6

140
140
140
140
140
140

0.925
1.761
1.538
1.538
1.538
1.538

-1
3.2
3.2
3.2
12.4
12.4

67.1
17.1
1.5
1.5
8.15
1.5

83.875
21.375
1.875
1.875
10.1875
1.875

1
1.32
0.11
0.11
0.6
0.11

1
2.32
2.43
2.54
2.92
3.03

105
105
105
105
105
105

105
99.48
99.37
99.26
89.68
89.57

55
55
55
55
55

49.48
49.37
49.26
39.68
39.57

lvl-1
lvl-1
lvl-1
lvl-1 to 2
lvl-2
lvl-2 to 3
lvl-3

3
6
7
6
8
8
9

6
7
C
8
D
9
E

32
8
8
24
8
16
16

2.66
1.7
1.7
2.3
1.7
2.016
2.016

45.6
45.6
45.6
45.6
45.6
45.6
45.6

140
140
140
140
140
140
140

1.630
1.041
1.041
1.409
1.041
1.235
1.235

3.2
3.2
3.2
12.4
12.4
16.6
16.6

4.5
1.5
1.5
8.15
1.5
4.2
1.5

5.625
1.875
1.875
10.1875
1.875
5.25
1.875

0.37
0.05
0.05
0.51
0.05
0.21
0.07

2.69
2.74
2.79
3.2
3.25
3.41
3.48

105
105
105
105
105
105
105

99.11
99.06
99.01
89.4
89.35
84.99
84.92

55
55
55
55
55
55
55

49.11
49.06
49.01
39.4
39.35
34.99
34.92

lvl-1 to 18
lvl-18
lvl-1
lvl-19
lvl-19 to 21
lvl-21

2
10
10
11
11
12

10
F
11
G
12
H

32
16
16
8
8
8

2.66
2.016
2.016
1.7
1.7
1.7

54.2
45.6
45.6
45.6
45.6
45.6

140
140
140
140
140
140

1.153
1.235
1.235
1.041
1.041
1.041

69.95
69.95
73.95
73.95
81.85
81.85

65.7
1.5
4
1.5
7.9
1.5

82.125
1.875
5
1.875
9.875
1.875

2.32
0.07
0.2
0.05
0.28
0.05

3.32
3.39
3.52
3.57
3.8
3.85

105
105
105
105
105
105

31.73
31.66
27.53
27.48
19.35
19.3

Remarks

The cumulative F.U through each pipe is worked out and corresponding flow through the pipe is arrived.The head loss through each pipe section will be
worked out based on flow rate through that pipe stretch.