Live Well Completions Applications Mechanics of Hydraulic Workover M h i f H d li W k Stripping Procedures Engineering and Well Planning HWO Live Well Completions Case Histories p
Tubing is snubbed until tool joint/connection is between BOP #1 rams and BOP#2 rams
10
11
12
13
ENGINEERING
14
15
Critical Buckling
16
Combined Stresses
17
18
19
Description: MU 3-3/4 Mill, Hyd-disconnect, 1jt. Tbg. & 1.875 X-Nipple. TIH live, to top of CIBP @ 15,190, mill up plug and wash down to PBTD @ 16,330. Drop 1-1/4 ball, pressure up tbg. w/ N2 & disconnect mill. POOH to 12,570. Space out and MU extended neck hanger so that when hanger lands, BOT is @ approx. 12,570. ND snubbing unit and BOPs. BOP
20
Description: Repair Xmas Tree, R/U BOPs & Unit, Test, MU Mill, BPVs, Nipple on 1-1/4 workstring. TIH to bridge at 2,472, wash & mill to 4,800, circ out. TIH to 10,100, tag bridge, wash & mill to 10,200 circ out . Bullhead into well POOH Run W/L gauge. Cmt perfs. Perforate new zone. 10 200 well. POOH. gauge perfs zone R/D snubbing unit and BOPs, turn well over to production.
21
p17
Stand Pipe
e1 e2
e-2 e-1
Equalizing Pump Bleed Off Pump Line ( routed to GBor safe area)
e3 e4
p9 p10
Pump Bleed Off (routed to GBor safe area)
1)p-1,p-3,p-9,p-7 1) 1 3 9 7 CUDD 2)p-4,p-2,p-8,p-10 3)p-16 Circulation Drawing for 4)p-15 High Pressure H2S Wash Out 5)p-6,p-5,p-11 6)p-12,p-13,p-14 Operation # 3 Well Mobile 903 7)Remove check k-3,#5 Blind ram,c-2,c-3, Rental crown valve, 26 April; 2002 8) #5 Blind ram,c-1,c-5,c-4,Rental Master ) 9) P/U 1-1/4''tbg.,#9 1-1/4'' safety,p-17 circdrawing.dsf 10) #8 1-1/4'' safety No scale 11) #4 1-1/4''safety,c-6,k-1 12) #2 1-1/4 stripper,e-4,e-5,c-7,c-22,c-21 15) #2 1-1/4''stripper,e-2,c-18,c-10 c-24,k-2 16) #1 1-1/4''stripper,b-1,c-11,c-12,c-17,c-16 13) M/U check k-3,#2 1-1/4'' stripper,e-3,e-6, 17) #1 1-1/4''stripper,b-2,c-13,c-15,c-14 c-20,c-8,c-23,c-25 18) hydril,d-1,note 10m, L/D 1-1/4''tbg. 14) #2 1-1/4'' stripper,e-1,c-18,c-9 19) P/U 1-1/2''tbg.,#7 1-1/2'' safety ram Diverter line to rig manifold or flare stack 20) kill line,stabbing valve(t.i.w.),b.p.v. line stabbing valve(t i w ) b p v d-1 d1 21) 1-13/16''20m csg. valve 22) 2'' 1502 stabbing valve b-1 b-2 23) 2'' 1502 stabbing valve #1 1 1/4 stripper ram 24) 1-1/4'' b.p.v. 25) 1-1/4'' b.p.v. e5 e6 #2 1 1/4 stripper ram Bleed Off Line to rig manifold or flare stack #3 1 1/4 slip ram choke manifold 15m
Choke #4 1 1/4 safety ram Line c-6
c-9 c-8
c-10
c-11
p7p8
Choke Line
c-1
c-2
c-3
c-5
#5 blind ram
Mud/Gas Separator
#6
sh ea r ram
p1
p-2
p13 p14
k-1k-2
k-3
c-18
c-17
22
4-1/16"15m X 3-1/16''20mBOP Stack 2-9/16''I.D.X4''O.D.Guide to Bottom of Jack and Top of Hydrill 4-1/16''15mX4-1/16''10m Adapter Spool 4-1/16''10mX4-1/16''10m Swivel Spool 4-1/16''10m Hydril 4-1/16''10x4-1/16''15m D.S.A. 4-1/16''15m Diverted Line 4-1/16''15m Helical Adapter W/2-9/16'' Guide to Top of # 1- Stripper # 1-1-1/4''Stripper Ram 4-1/16''15m 4-1/16''15mSpool w/ 2-9/16''I.D. # 2 1 1/4''Stripper Ram 4 1/16''15m 2-1-1/4 Stripper 4-1/16 15m
2'';1502
12'' 53'' 25.25'' 6.0'' 17.75'' 6.25'' 29.25'' 24'' 29.25 29 25'' 29.25'' 11'' 32'' 32'' 16''
2'';1502 2'';1502 10m
2'';1502 10m
Choke Line
2'';2202
2'';1502
Kill Line
2'';1502
Rig floor
Rig floor
Spool 2-9/16''20m 33' 2-9/16'' 20m Crown Valve 2-9/16'' 20m Master Valve
23
24
Description: Preset plug in 5-1/2, Remove Xmas Tree, R/U Snub Unit & BOPs, T t S b t 5 1/2 Casing d lay down, Ri D BOP Test, Snub out 5-1/2 C i and l d Rig Down S b U it Snub Unit
25
26
27
Gas Storage Wells Typical Uses of S bbi T i lU f Snubbing Snub out injection/wash strings (up to 7) p g g Remove and replace Tubing/Casing/Packer Reposition tubing/casing within cavern ( g g) Washout Obstructions (through tubing)
28
Description:
MU 4-1/2 Mill, Pump through-Pump off Bit Sub, 1jt. Tbg. & 1.875 XNipple. TIH live, to 3150 m tag sand and clean out with water and well gas to 10 meters below perfs @ 3250 m. Pull up to 3140 m (10 meters above perfs). Make up and land t bi h f ) M k d l d tubing hanger. Ri d Rig down snubbing unit and bbi it d BOPs, Nipple up production tree. Drop 7/8 ball in tubing and pressure up with water to release bit. Turn well over to production.
29
Live well clean out and drill out bridge plug 10 March, 2005 Jiao 61-1B Burlington Resources China 225K 41.7 MPa (6000 psi) shut in; 3.4 MPa (500 psi) well flowing 2-7/8 6.5# P-110 8RD 3310 m (10859) 6 days (daylight)
31