INDEX of Part Numbers or Sub - Assembly Numbers Required To Make The Assembly Noted Above

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

AS/EN/SJAC 9102 Rev A First Article Inspection Form 1 : Part number Accountability 1. Part Number 65B10887-1 5.

Part Revision Level N/C + PSDL N/C 9.Manufacturing Process Reference Routing: P8000/R00 13. Detail FAI Assembly FAI

sheet 1 of _5_

2. Part Name CROSS TIE FWD 6.Drawing Number 65B10887 10. Organization Name Pranita Engg Sol Pvt Ltd

3.Serial Number #1 7. Drawing revision level "C" 11.Supplier Code 009286

4. FAI Report Number 118 8. Additional Changes

12. P.O. Number 92820-1789

14. Full Fai as per PO Partial FAI Baseline Part Number including revision level Reason for Partial FAI

a) if above part number is a detail part only. Go to Field 19 b) if above part number is an assembly , go to the " INDEX" section below.

INDEX of part numbers or sub - assembly numbers required to make the assembly noted above.
15. Part Number 16. Part Name 17. Part Serial Number 18. FAI Report Number For Trasability FAI is Identified by Tag #1

1) Signature indicates that all characteristics are accounted for ; meet drawing requirements or are properly documented for disposition

2) Also indicate if the FAI is complete per Section 5.4 : 19. signature 21. Reviewed By 23. Customer Approval

FAI Complete

FAI not Complete 20. Date : 19-5-2008 22 . Date : 19-5-2008 24 . Date : QF/QC/31/R00

AS/EN/SJAC9102 REV A First Article Inspection Form-2 Product Accountabiliy -- Raw Material, Specifications and Special Process(s), Functional Testing 1.Part Number 2. Part Name CROSS 3.Serial Number 65B10887-1 TIE-FWD BOGIE #1 5. Material or Process Name 6. Specification Number 7.Code 8.Special Process Supplier Code 9.Customer Approval Verification (Yes/No/NA)
Supplied By Ellanef

sheet 2 of _5_

4. FAI Report Number 118 10. Certificate of Conformance number 137244 Test Certificates Attached

TI-6AL-4V extrusion
BAC 1673-16

AMS 4934

SUPPLIED BY ELLANEF

11. Functional Test cedure Number

12. Acceptance report number, if applicable

13 Comments 14 Prepared By 15. Date: 19-5-2008 QF/QC/31/R00

AS/EN/SJAC9102 Rev A First Article Inspection Form 3 : Characteristic Accountability ; Verification and Compatibility Evaluation. 1. Part Number 2. Part Name 65B10887-1 CROSS TIE FWD 5. Char No. 1 2 3 4 5 6 7 8 9 10 10A 10B 10C 10D 10E 10F 10G 10H 10I 10J 10K Characteristic Accountability 6. Reference 7. 8.Requirement Location Characteristic Designator 1 B-6 PLAN 1 B-5 PLAN 1 B-5 PLAN 1 B-5 PLAN 1 A-5 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 11.14 0.01 0.15 0.01 1.20 0.01 2.40 0.01 0.15 0.01 2.00 BSC 9. Results Inspection/Test Results 10. Designed 11. NonTooling Conformance Number Vernier Vernier Vernier Vernier Vernier CMM Vernier CMM CMM Bore Gauge Bore Gauge Bore Gauge Bore Gauge Bore Gauge Bore Gauge Bore Gauge Bore Gauge Surface.R.T Surface.R.T Surface.R.T Surface.R.T

Sheet 3 of _5_ 3. Serial Number #1 14 INSTRUMENT ID 4. FAI Report 118 INSP

11.148/11.150 0.150/0.152 1.20 2.40 0.152/0.154 2.0001 0.648/0.655 9.8398 2.0000 0.3751/0.3755 0.3754/0.3755 0.3753/0.3754 0.3752/0.3754 0.3754/0.3755 0.3754/0.3755 0.3754/0.3755 0.3751/0.3754 28 28 28 28

PRES/INSP/043 PRES/INSP/043 PRES/INSP/043 PRES/INSP/043 PRES/INSP/043 QUEST PRES/INSP/043 QUEST QUEST PRES/INSP/017 PRES/INSP/017 PRES/INSP/017 PRES/INSP/017 PRES/INSP/017 PRES/INSP/017 PRES/INSP/017 PRES/INSP/017 PRES/INSP/097 PRES/INSP/097 PRES/INSP/097 PRES/INSP/097 PRES/INSP/097 13. Date :19-5-08
QF/QC/31/R00

0..65 0.01 9.84 BCS 2.00BCS 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE 0.3750-0.3755 DIA HOLE

10l 1 A-6 PLAN 28 Surface.R.T The signature indicates that all characteristics are accounted for; meet drawing requirement or are properly documented for disposition. 12. Prepared By: Approved By

AS/EN/SJAC9102 Rev A First Article Inspection Sheet 4 of _5_ Form 3 : Characteristic Accountability ; Verification and Compatibility Evaluation. 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report 65B10887-1 CROSS TIE FWD #1 118 Characteristic Accountability Inspection/Test Results 5. 6. Reference 7. 8.Requirement 10. Designed 11. Non14 INSTRUMENT ID 9. Results INSP Char Location Characteristic Tooling Conformance 10m 10n 10p 11 11a 11b 11C 11D 11E 11F 12 13 14 15 16 17 18 19 20 21 22 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 B-6 PLAN 1 B-6 PLAN 1 B-6 SIDE 1 B-6 SIDE 1 B-6 SIDE 1 B-6 END 1.14 0.63 0.1 BSC (TYP) 28 28 28 0.0004 0.0003 0.0005 0.0007 0.0005 0.0004 0.0005 0.630/0.631 1.1403/1.1402 1.203/1.207 0.108/0.110 0.300/0.307 60 (TYP) 0.115 Surface.R.T Surface.R.T Surface.R.T CMM CMM CMM CMM CMM CMM CMM Vernier CMM Vernier Vernier Vernier Bevel Protec RadiusGauge PRES/INSP/097 PRES/INSP/097 PRES/INSP/097 QUEST QUEST QUEST QUEST QUEST QUEST QUEST QUEST QUEST PRES/INSP/043 PRES/INSP/043 PRES/INSP/043 PRES/INSP/37 PRES/INSP/095

1.20 0.01 0.10 0.01 0.30 0.01 (TYP) 60 1 R 0.10-0.14

DIFFERENT CONFIGURATION DIFFERENT CONFIGURATION DIFFERENT CONFIGURATION DIFFERENT CONFIGURATION

23 DIFFERENT CONFIGURATION The signature indicates that all characteristics are accounted for; meet drawing requirement or are properly documented for disposition. 12. Prepared By: Approved By

13. Date :19-5-08


QF/QC/31/R00

AS/EN/SJAC9102 Rev A First Article Inspection Sheet 5 of _5_ Form 3 : Characteristic Accountability ; Verification and Compatibility Evaluation. 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report 65B10887-1 CROSS TIE FWD #1 118 Characteristic Accountability Inspection/Test Results 5. 6. Reference 7. 8.Requirement 10. Designed 11. Non14 INSTRUMENT ID 9. Results INSP Char Location Characteristic Tooling Conformance 24 25 26 27 28 29 30 30A 30B 30C 31 32 33 34 35 36 37 38 39 1 C-6 SIDE
DIFFERENT CONFIGURATION DIFFERENT CONFIGURATION DIFFERENT CONFIGURATION DIFFERENT CONFIGURATION BREAK SHARP EDGES THIS HOLE ONLY. (UPPER SIDE) BREAK SHARP EDGES THIS HOLE ONLY. (LOWER SIDE) 0.193- 0.197 DIA HOLE 0.193- 0.197 DIA HOLE 0.193- 0.197 DIA HOLE 0.193- 0.197 DIA HOLE 0.400.01 (typ) 0.610.01 (typ) 5.570.01 0.750.01 DIA HOLE

DONE DONE 0.196/0.197 0.196/0.197 0.196/0.197 0.196/0.197 0.396 0.613 5.577 0.75 DONE

Visual Visual Vernier Vernier Vernier Vernier HeightGauge HeightGauge Vernier Vernier PRES/INSP/043 PRES/INSP/043 PRES/INSP/043 PRES/INSP/043 PRES/INSP/028 PRES/INSP/028 PRES/INSP/043 PRES/INSP/043

1 C-6 SIDE 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 A-6 PLAN 1 B-6 PLAN 1 B-6 PLAN 1 B-6 SIDE 1 B-6 SIDE 1 A-4 SIDE P/L P/L P/L P/L FL 00 FL 6 GN 1 GN2

0.5 MIN (TYP)


LIMITED SEE ASSEMBLY BREAKDOWN LIST FOR RELEASE OPTIONAL MATERIAL: 6AL-6V-2SN TYPE 111 COMP -C- PER MIL-T- 9047

PRES/INSP/068 13. Date :19-5-08


QF/QC/31/R00

MACHINE PER BACC5492, CLASS 2 PENETRANT INSPECT PER BAC5423.

40 Weight 0.444 Weight/MC The signature indicates that all characteristics are accounted for; meet drawing requirement or are properly documented for disposition. 12. Prepared By: Approved By

You might also like