WBS for SEITZ Corporations Huntsville Plant construction project

1. Huntsville Plant Construction 1.1. Pre-Production Plan 1.1.1. Pre-Production Plan creation 1.1.2. Review and approve Pre-Production Plan 1.2. Recruit and Train Managers 1.2.1. Recruit the suitable candidates 1.2.2. Identify training needs 1.2.3. Schedule and conduct the training. 1.3. Production Plan 1.3.1. Creation of production plan 1.3.2. Review and approval of production plan. 1.4. Selection of Development Team 1.4.1. Select Real Estate Consultant 1.4.2. Select Architect 1.4.3. Select General Contractor 1.5. Building Concept and Design 1.5.1. Develop building concept and design. 1.5.2. Review and approve building Concept and design 1.6. Procure Building site 1.7. Obtain permits and approvals 1.8. Building construction 1.8.1. Prepare Site for construction. 1.8.2. Construct the building. 1.9. Land Scape 1.9.1. Design and review land scape proposal. 1.9.2. Install landscape.

1.10.Procurement of Hard Materials 1.10.1. Select Vendors from Approved List 1.10.2. Get approvals from Management 1.10.3. Procure Raw Materials 1.10.4. Procure Truck Fleet 1.10.5. Procure equipment 1.10 Install Equipment 1.11 Recruit Plant Personnel 1.11.1 . Work with HR to create job description 1.11.2 . Post job postings in media sources 1.11.3 . Hire Internal and External candidates 1.11.4 . Train according to matrix developed 1.12 Implement Product Distribution Plan 1.13 Perform Pre Production Run 1.13.1 . Make sure Inventory is current and present 1.13.2 . Employees know their responsibilities and work stations 1.13.3 . Perform a test run of the production process 1.14.4. Have an evaluation and feedback period 1.14 Perform Production Run 1.15 Begin Distribution

You might also like