4.323-Pre Start Up Safety Review (PSUSR)
4.323-Pre Start Up Safety Review (PSUSR)
4.323-Pre Start Up Safety Review (PSUSR)
17.
18. 19.
20.
Structure / Supports/ Clamping / Grouting/flange joints Load test requirement? Inspection / Testing Documents available Insulation requirement for hot/cold and personal protection. Machine Guards. Access/work platforms: Stairs / ladders,Railings / toe guards,etc. Electrical System: Earthing / Cable dressing Selection of Electrical/ instrument equipment as per hazardous area classification. Control of static electricity Hazards. Drainage system:Floor gradient/ trenches Fire protection system: MCP/Hydrants/Fire extinguishers Sprinkler / Deluge/ detectors/foam system Statutory Compliance Status (if applicable)Factories act, DPR environment regulations). Third Party Certification? Safety Signs/Boards: Safety signs ? Safety Instruction Boards? Colour coding of pipe lines ? Equipment tag No./name Painted? Others (specify)
A A A A A A A A
A B A
A B B B B B
1-HOF-HSE&F
Note: Categories A / B A Critical points which need to be resolved /completed before start up of the facility.
B Points having low risk and where alternate temporary measures are acceptable for a limited period (2 weeks)