Danfoss has developed a injection valve type TXI 2 for desuperheating in 2-stage refrigeration systems operating on R22 where the hot gas temperature and the intermediate pressure are the controlling variables. Application In principle there are two dierent ways in which to setup 2-stage refrigeration systems as far as temperature signal to the liquid injection valve is concerned. Example 1 2-stage refrigeration system built up with a combined LP/HP compressor. In this case the discharge gas temperature on the HP side is used as temperature signal and the
Application examples
intermediate pressure as pressure signal to the injection valve. In this example a TXI 2 injection valve is used, see g. 1.
Fig. 1
DKRCC.PD.AV0.A2.02 / 520H0699
Technical leaet
Example 2 2-stage refrigeration system with 2 separate refrigerating compressors in series. In this set up a solution with injection valve type TXI 2 can be used, because the discharge gas temperature on
the HP side can be used as temperature signal and the intermediate pressure as pressure signal to the injection valve, see g. 2.
Fig. 2
LP: Low pressure compressor HP: High pressure compressor PI: Intermediate pressure
Example 3 Same setup as in example 2 with 2 separate refrigerating compressors in series. As in this setup there is an accessible control signal where there is correspondence between pressure and temperature, regulation of the strongly
superheated condition of the refrigerant can be undertaken by a traditional thermostatic expansion valve e.g. Danfoss type TX 2 for R22 refrigeration systems, see g. 3.
Fig. 3
LP: Low pressure compressor HP: High pressure compressor PI: Intermediate pressure
DKRCC.PD.AV0.A2.02 / 520H0699
Technical leaet
Operation
Pbulb
Pspring
PI
Fig. 4
The valve function is controlled by the intermediate pressure (PI) acting under the diaphragm and the bulb pressure derived from the discharge gas temperature across the diaphragm (g. 4).
DKRCC.PD.AV0.A2.02 / 520H0699
Technical leaet
Operation (continued)
The intermediate pressure (PI), setting spring and bulb temperature form a working range which, expressed in a co-ordinate system, makes up a working area, see g. 5.
Fig. 5
Fig. 5
Within the limits of this area, the working point required is found (PI/tbulb). The location of the working point depends on the spring force set and in addition to that dependent on the proportional band (the superheat) and the valve capacity (size of orice). Therefore, the sizing is decisive for a satisfactory result.
DKRCC.PD.AV0.A2.02 / 520H0699
Technical leaet
Sizing
To size TXI 2 the refrigerating capacity required to remove the superheat at the intermediate stage must be known as well as the required discharge gas temperature on the discharge side. Besides this the pressure drop p across the injection valve must be determined as the dierence between the condensing pressure and the pressure at the intermediate stage. With the values for the required capacity, the Example: Required refrigerating capacity Q = 5 kW Evaporating temperature at intermediate state t0 = 25C Pressure drop across TXI 2 p = 12 bar' Discharge gas temperature (HP) = 110C
Orice No. 00 01 02 03 04 05 06
evaporating temperature t0 (PI) of the intermediate stage and the pressure drop across TXI 2, the correct orice size can be determined.
Evaporating temperature 25C Pressure drop across valve p bar 2 0.69 1.21 1.66 2.98 4.36 5.55 6.80 4 0.83 1.51 2.13 3.82 5.59 7.10 8.68 6 0.94 1.71 2.42 4.33 6.35 8.06 9.84 8 1.02 1.85 2.62 4.69 6.89 8.74 10.67 10 1.08 1.96 2.77 4.96 7.30 9.26 11.30 12 1.12 2.04 2.87 5.15 7.60 9.64 11.77 14 1.14 2.09 2.94 5.27 7.80 9.89 12.08 16 1.15 2.11 2.97 5.33 7.91 10.02 12.25
Valve type TXI 2 - 0.2 TXI 2 - 0.3 TXI 2 - 0.6 TXI 2 - 0.8 TXI 2 - 1.2 TXI 2 - 1.5 TXI 2 - 2.0
TXI 2 with orice 03 ts that example as the values in the capacity tables are shown with a proportional band of 6 K.
Capacity in kW
Valve type TXI 2 - 0.2 TXI 2 - 0.3 TXI 2 - 0.6 TXI 2 - 0.8 TXI 2 - 1.2 TXI 2 - 1.5 TXI 2 - 2.0 Orice No. 00 01 02 03 04 05 06 2 0.79 1.6 2.2 3.9 5.8 7.4 9.1 4 0.96 2.0 2.9 5.1 7.6 9.6 11.8 6 1.1 2.3 3.3 5.9 8.7 11.0 13.5
Evaporating temperature 10C Pressure drop across valve p bar 8 1.2 2.5 3.6 6.4 9.5 12.0 14.7 10 1.2 2.6 3.8 6.8 10.1 12.8 15.6 12 1.3 2.7 4.0 7.1 10.5 13.3 16.2 14 1.3 2.8 4.1 7.3 10.8 13.6 16.6 16 1.3 2.8 4.1 7.3 10.9 13.8 16.8
Valve type TXI 2 - 0.2 TXI 2 - 0.3 TXI 2 - 0.6 TXI 2 - 0.8 TXI 2 - 1.2 TXI 2 - 1.5 TXI 2 - 2.0
Orice No. 00 01 02 03 04 05 06
Evaporating temperature 20C Pressure drop across valve p bar 4 0.88 17 2.4 4.2 6.2 7.9 9.6 6 1.0 1.9 2.7 4.8 7.1 9.0 11.0 8 1.1 2.0 2.9 5.2 7.7 9.8 11.9 10 1.1 2.2 3.1 5.5 8.2 10.3 12.6 12 1.2 2.3 3.2 5.8 8.5 10.8 13.1 14 1.2 2.3 3.3 5.9 8.7 11.0 13.5 16 1.2 2.3 3.3 6.0 8.8 11.2 13.7
DKRCC.PD.AV0.A2.02 / 520H0699
Technical leaet
Capacity in kW
Valve type TXI 2 - 0.2 TXI 2 - 0.3 TXI 2 - 0.6 TXI 2 - 0.8 TXI 2 - 1.2 TXI 2 - 1.5 TXI 2 - 2.0
Orice No. 00 01 02 03 04 05 06
Evaporating temperature (PI) 25C Pressure drop across valve p bar 2 0.69 1.21 1.66 2.98 4.36 5.55 6.80 4 0.83 1.51 2.13 3.82 5.59 7.10 8.68 6 0.94 1.71 2.42 4.33 6.35 8.06 9.84 8 1.02 1.85 2.62 4.69 6.89 8.74 10.67 10 1.08 1.96 2.77 4.96 7.30 9.26 11.30 12 1.12 2.04 2.87 5.15 7.60 9.64 11.77 14 1.14 2.09 2.94 5.27 7.80 9.89 12.08 16 1.15 2.11 2.97 5.33 7.91 10.02 12.25
Valve type TXI 2 - 0.2 TXI 2 - 0.3 TXI 2 - 0.6 TXI 2 - 0.8 TXI 2 - 1.2 TXI 2 - 1.5 TXI 2 - 2.0
Orice No. 00 01 02 03 04 05 06
Evaporating temperature (PI) 30C Pressure drop across valve p bar 4 0.79 1.4 1.9 3.4 5.0 6.4 7.8 6 0.90 1.5 2.2 3.9 5.7 7.2 8.8 8 0.96 1.7 2.7 4.2 6.2 7.8 9.6 10 1.0 1.8 2.5 4.4 6.5 8.3 10.1 12 1.1 1.8 2.6 4.6 6.8 8.6 10.5 14 1.1 1.9 2.6 4.7 7.0 8.8 10.8 16 1.1 1.9 2.7 4.8 7.1 9.0 11.0
Valve type TXI 2 - 0.2 TXI 2 - 0.3 TXI 2 - 0.6 TXI 2 - 0.8 TXI 2 - 1.2 TXI 2 - 1.5 TXI 2 - 2.0
Orice No. 00 01 02 03 04 05 06
Evaporating temperature (PI) 40C Pressure drop across valve p bar 2 0.60 0.90 1.23 2.20 3.20 4.07 4.98 4 0.71 1.11 1.55 2.78 4.04 5.14 6.28 6 0.80 1.25 1.74 3.12 4.56 5.79 7.07 8 0.86 1.35 1.88 3.36 4.93 6.26 7.65 10 0.92 1.43 1.97 3.54 5.21 6.62 8.09 12 0.95 1.49 2.05 3.68 5.43 6.90 8.44 14 0.98 1.53 2.09 3.77 5.58 7.09 8.68 16 0.99 1.55 2.12 3.81 5.67 7.20 8.82
DKRCC.PD.AV0.A2.02 / 520H0699
Technical leaet
Setting
TXI 2 cannot be set until the refrigerant system is started up. Setting after start-up is carried out when the discharge gas temperature has been recorded and the intermediate pressure is known or measured. By means of the diagram, g. 5, the actual working point is found. From the location of the working point in the diagram, g. Perm. working pressure PS/MWP: Max. test pressure: Capillary tube: 34 bar 37.5 bar 1.5 m.
5, it should be decided whether to increase or decrease the spring force. Alteration of the spring from slack to tight setting corresponds to 6 revolutions of the TXI 2 setting screw.
Technical data
Ordering valve
Connections [in.] /8 /2 SAE are /8 1/2 SAE are /8 SAE are 1/2 solder /8 1/2 SAE are
Temp. range +100 +130C +100 +130C +100 +130C +80 +110C
Ordering accessories
Orice assembly
Orice no. 00 01 02 03 04 05 06 Code no. TE 2 068-2003 068-2010 068-2015 068-2006 068-2007 068-2008 068-2009
Flare nuts
Symbol Connection for copper tubing with outside cam. in.
1 3 1 3
mm. 6 10 12 10
/4 /8 /2 /8
/4
011L1207
DKRCC.PD.AV0.A2.02 / 520H0699