Faq - PFC Audit
Faq - PFC Audit
Faq - PFC Audit
POINTS REQUIRING CLARIFICATION ON BEHALF OF MECON LTD., THE CONSULTANT, FOR THE JOB OF ATC LOSS AUDIT IN 3 STATES PRELIMINARY ACTIVITIES
1) Should MECON Team meet the Nodal officer of PFC before proceeding to the 3 states for the beginning of the jobs ? 2) The details of the State power utilities like Name/place alongwith communication addresses of the Head/Sub Offices may be communicated to us before collection of data pertaining to AT&C losses ? 3) To whom shall MECON report in the concerned state right at the beginning of the job : PFC/FOR/State utility ? 4) Will there be any Nodal officer on behalf of the Utilities (upon being communicated by PFC in advance about the Audit to be undertaken) to deliver the data to MECON ? 5) Since all the 3 concerned states are having multiple Power Utilities, does MECON need to consider technical details of all the utilities including the Private ones ? 6) With whom shall MECON discuss about the selection of 4 zones (and 4 circles therein) for finalization ? 7) Shall MECON have to maintain correspondences simultaneously with PFC, FOR & the State utility ? What role shall FOR play in this regard or else during the Survey stage to follow ? 8) To whom shall MECON submit the Inception Report : PFC/FOR/State utility ? Who will give final approval to the report ? 9) Where will the Presentation (regarding Inception report & initial findings) take place ?
8) What else shall MECON need to do or exhibit in the workshop other than deliberation or presentation about the Draft Audit report, its findings, the hurdles faced, the issue of left over job etc ? ACTIVITIES (subsequent to submission of DRAFT AUDIT REPORT)
1 of 2
1)
Considering all the eventualities, what will happen about the feeder surveys remaining unfinished due to any reason whatsoever within the stipulated time frame of 6 months ?